Loading...
HomeMy WebLinkAbout881017.tiff RESOLUTION RE: APPROVE CHANGE ORDER TO BASSETT & ASSOCIATES, INC. , CONCERNING HUMAN RESOURCES OFFICE BUILDING AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, Weld County entered into construction contracts on July 11 , 1988 , with Bassett & Associates, Inc. , concerning the Human Resources Office Building, and WHEREAS , the Board has been advised that a Change Order totaling $37 ,579 . 00 is necessary. NOW, THEREFORE , BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that a Change Order totaling $37 , 579 .00 concerning the contract dated July 11 , 1988 , with Bassett & Associates, Inc. , be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said Change Order. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 26th day of October, A.D. , 1988 . ATTEST: �/ O� l tJn BOARD OF COUNTY COMMISSIONERS WEL OUN/T�Y, COLORADO Weld County lerk and Recorder /(� and Clerk to the Board ene R. Brantner, Chairman BY: L7z�nc �_ z C.W. Kir y, Pr -Tem Deputy County O4erk APPROVED AS TO FORM: J.cqu ine o nson EXCUSED Gordon E Lacy County Attorney Frank Yamaguchi V . 881017 CHANGE OWNERARCHITECT Li ORDER CONTRACTOR o RECEIVED OCT 1 7 1988 FIELD AM DOCUMENT G701 OTHER • PROJECT: WELD COUNTY, COLORADO CHANGE ORDER NUMBER: ONE (name, address) HUMAN RESOURCES OFFICE BUILDING WELD COUNTY BUSINESS PARK TO (Contractor) GREELEY, COLORADO Bassett & Associates, Inc. —1 ARCHITECT'S PROJECT NO: 8801 7388 5. Revere Parkway CONTRACT FOR: HUMAN RESOURCES Suite 806 OFFICE BUILDING Englewood, Colorado 80112 Greeley, Colorado L J CONTRACT DATE:Jul y 11 , 1938 You are directed to make the following changes in this Contract: 1 . Owner requested changes (building department) , items 1-5, Architect' s iecter dated July 25, 1988 and Contractor' s letter da_ed August 1 , , 1338• ADD: $ 1 ,485.00 2. Addition of an air-conditioning system to electrical room 10 per Contractor' s letter dated September 29, 1988. ADD: 4, 103.00 3 . Addition of 2 sections of 12-inch diameter concrete pipe at east end of pond 112 per Contractor' s letter. ADD: 577.00 4. Extend structural columns as instructed by structural engineer and per Contractor' s letter dated October 11 , 1988. ADD: 210.00 5. Additional landscaping and sprinkler system, Base Bid over $20,000 allowance, per Contractor' s letter dated October 12 , 1988. ADD: 42,522.00 6. Substitution of Bali Blinds in lieu of Levalors specified. DEDUCT: 185.00 7. Carpet allowance minus carpet bid. ($26,500-$18,386) DEDUCT: 8, 114.00 8. Hardware allowance minus hardware bid. ($15,000-$11 ,981) DEDUCT: 3,019.00 The original Contract Sum was $ 7772.OOO.OU • Net change by previous Change Orders $ 0.00 • The Contract Sum prior to this Change Order was $ 772,000.00 • The Contract Sum will be (increased) (Efseretlsetf) (anehangedl by this Change Order . . . $ 37,579.00 • The new Contract Sum including this Change Order will be $ 809,579.00 • The Contract Time will be (inefeast:1) (degrease) (unchanged) by ( -0- ) Days. The Date of Completion as of the date of this Change Order therefore is January 7, 1989 • LARRY E. STEEL ASSOCIATES BASSETCTT�& ASSOCIATES, INC. WELD COUNTY, COLORADO re ueley National Plaza, Suite 6�t8NT,ffi . Revere Pkwy. Suite0 ER P.O. Box 758 Address Address Address Greeley, Colorado C 080631 A r �EEnng�l`ewood, Colorado 80112 }/jf�Gree`ley, Colorado 80632 BY dal E.. 2 tet t , A. I .A YtY -1I14,3 L r By Janet ilt.-Gs�.-- DATE IC /14198 DATE to -12) -SE) DATE /6 _. ‘X6 - j by AR DOCUMENT C701 • CHANGE ORDER • APRIL 1070 EDITION • AIA® • C 1970 • THE ONE PACE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 1017 Hello