Loading...
HomeMy WebLinkAbout851266.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS X 4Am'01 p,.,, 4201 East Arkansas Ave. if Denver, Colorado 80222 ACC```��✓ (303)757-9011 "w 8 FOR MORE INFORMATION: i 751x922 ;� ❑;ii—rf #85-25 p Highway News RELEASE AT WILL i '. ; ill June 13, 1985 JUN 1.81985 IXFU 0121-1 (15) WADSWORTH BLVD. AT WEST JEWELL AVE. GREELEY. COW. IN LAKEWOOD The Department's Division of Highways accepted three bids at the June 13 opening for a project to reconstruct the Wadsworth Blvd. , West Jewell Ave. intersection in Lakewood. Bituminous Roadways of Colorado, of Englewood, turned in an apparently successful bid of $ 1,332,812. The work begins 0.2 mile south of the S.H. 121 junction and extends 0.3 mile north. Elements include grading, stabilization, structures, extending a concrete box culvert, hot bituminous and concrete paving, signing, striping, lighting, signalization, seeding and mulching. R. L. McKenzie of Golden is resident engineer. The project requires completion within 180 working days following its Notice to Proceed. 000 I-IR 70-2(129) I-70 EAST OF VAIL Resurfacing Interstate 70 east of Vail drew three bidders at the Division of Highways June 13 opening. A project which begins 9.1 miles east of the mountain community and extends 5.1 miles easterly consists of hot bituminous paving, plant mixed seal coat, structures, striping, topsoil , seeding and mulching. An apparently successful bid of $860,207 was received from Kiewit Western Company of Littleton. The project is scheduled for completion within seventy workable days, coordinated by resident engineer Wes Goff of Frisco. 000 BRS 0012(22) S.H. 12 AT LA VETA Replacing a State Highway 12 bridge at La Veta with a concrete box culvert drew five bidders at the Division of Highways June 13 opening. (This project was re-advertised May 23; you may have read the results of a bid opening in the May 9 Highway News on this project as a Set-Aside proposal restricted to minority bidders, but no contract was awarded. ) Walsenburg Sand & Gravel Company of Walsenburg turned in an apparently successful bid of $255,443 June 13; the project calls for completion within 50 working days. The project, which begins at the southern boundary of the town and extends 0.2 mile westerly, includes grading , structures, the concrete box culvert, hot bituminous paving, seeding, oulching, and striping. Project engineer is 0.E. Olson of Pueblo. 000 (over) sasse 851266 Highway News — Page 2 Department of Highways June 13, 1985 SR 0014(19) S.H. 14 SOUTHEAST OF WALDEN Kiewit Western Company of Littleton submitted an apparently successful bid of $596,153 at the Division of Highways June 13 opening to resurface S.H. 14 southeast of Walden. Five firms turned in offers for a project which begins 3.7 miles southeast of the town and extends nine miles southeasterly. Elements include grading , stabilization, structures, hot bituminous pavement overlay, topsoil , seeding and mulching, and are scheduled for completion within 60 workable days following the Notice to Proceed. D. C. Pyle of Craig is resident engineer. O 00 IR 25-c(182) I-25 NIGHTTIME RESURFACING IN DENVER MP 99-6000- i9 Resident engineer Joe Seitz of Denver will coordinate nighttime pave- ioent overlay and striping on Denver's Valley Highway, following contract award for a project whose bids were opened June 13 at the Division of Highways head- quarters. Two segments of Interstate 25 will be resurfaced; one 3.8-mile segment extends from the 23rd Ave. interchange south to Broadway, and a second extends from Franklin St. 0.3 mile southerly to University Blvd. The combined project is one of five nighttime construction projects scheduled this summer for the Denver area. Six firms turned in offers. An apparently successful bid of $1 ,318,706 was received from Siegrist Construction Company of Denver. The project requires completion within fifty working days . O 00 MP 12-0007-12 S.H. 7 WEST OF BRIGHTON A cover coat material (chip seal ) and striping project for East 160th Ave. in Adams county drew five bidders at the Division of Highways June 13 opening. GMCO Corporation of Glenwood Springs turned in an apparently successful bid of $99,928. The S.H. 7 project extends 8.19 miles, from milepost 68.31 east of Interstate 25 to milepost 76.5 west of the South Platte River. Resident engineer Steve Horton of Arvada will coordinate the project, which requires completion within twenty working days. O 00 - Highway News Page 3 Department of Highways June 13, 1985 BIDS TO BE OPENED July 3: 9:15 a.m. , Resurfacing highways in Delta county, consisting of hot bituminous pavement overlay, guardrail and striping, located on S.H. 92, beginning at the intersection of S.H. 133 in Hotchkiss and extending 10.9 miles southerly through Crawford; also located on S.H. 133, beginning east of the intersection of S.H. 187 near Paonia and extending 2-1/2 miles east, combined projects SR 0092(9) and SR 0133(15) . 9:30 a.m. , Improving Interstate 70 east of Limon, consisting of hot bituminous pavement, striping, seeding and mulching, beginning 2.1 miles east of the city (MP 357.8) and extending 4.3 miles east; also consisting of grading, not bituminous pavement and lighting, same location, all situated in Elbert and Lincoln counties, I 70-5(37) and IR 70-5(42), as combined. 9:45 a.m. , Resurfacing highways near Longmont, consisting of hot bituminous pavement overlay, located on S.H. 52, beginning 0.2 mile east of the junction of U.S. 287 and extending 2.9 miles east, in Boulder and Weld counties; also located on S.H. 66, beginning 3.9 miles east of the junction of U.S. 287 and extending 2-1/2 miles east, in Weld county, combined projects, MP 07-0052-01 and MP 03-0066-03. 10:00 a.m. , Bridge repair in Pueblo, consisting of deck rehabilitation, hot bituminous pavement and striping, located on U.S. 50, beginning approximately 0.07 mile east of I-25 and extending 0.06 mile east, in Pueblo county, BRF 050-3(29) . 10:15 a.m. , Resurfacing 5th Street in Grand Junction, consisting of rotomilling, hot bituminous pavement overlay and striping, located on U.S. 50, beginning at Pitkin Ave. and extending 0.6 mile south, in Mesa county, C 08-0050-09. 10:30 a.m. , Replacing a bridge north of Sterling, consisting of grading, aggregate base course and one bridge, located on County Road 40, approximately 0.4 mile west of the intersection with North Seventh Avenue, in Logan county, DRO 0013(1) . 10:45 a.m. , Improving U.S. 160 west of Durango, consisting of guard- rail and signing, 10.2 miles west of Durango and extending 4.8 miles easterly, in La Plata county, HES 0005(10). Certified, prequalified minority bidders only. 11 :00 a.m. , Widening on Interstate 225 and 13th Ave. bridge, consisting of grading, structure, bridge, stabilization, hot bituminous pavement, signing, striping, topsoil , seeding, and mulching, located on I-225, beginning 0.3 mile south of Colfax Ave. and extending 0.1 mile south over future 13th Ave. , in Arapahoe county, IR 225-4(35) . 11 :15 a.m. , Widening U.S. 50 near Cimarron, consisting of grading , stabilization, hot bituminous pavement and guardrail , beginning at milepost 109.37 and extending 1 .6 miles easterly to milepost 110.97, in Montrose county, FR 050-2(21 ) . 000 (over) Highway News Page 4 Department of Highways June 13, 1985 CONTRACTS AWARDED Road/ Bid Contract Project Street Description Awarded to 0peninct Awarded FCU 157-1(10) Foothills A project which will Ames Construction, 5/30/85 6/6/85 Parkway build 0.7 mile of Inc. $3,192,951 the Foothills Park- way in Boulder. The S.H. 157 segment extends from the Pearl St. inter- change northerly to a point just past Valmont Road. MP 01-0095-16 Sheridan To resurface a mile Dumar Contractors., 5/30/85 6/6/85 Blvd. of S.H. 95 in Inc. $220,829 Denver along the Denver and Jeffer- son county boundary -- extends from 30th Ave. to 43rd Ave. on Sheridan Blvd. ECU 040-4(17) East Furnishing signals Eagle Signal Con- 5/30/85 6/11/85 Colfax east of Chester St. trols $26,370 Ave. on East Colfax Ave. in Aurora. * * * Hello