HomeMy WebLinkAbout861209.tiff RESOLUTION
RE: ACTION OF THE BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY,
COLORADO, CONCERNING SITE APPLICATION OF ORVILLE W. AND
BILLIE JEAN SMITH AND AUTHORIZE CHAIRMAN TO SIGN
WHEREAS, the Board of County Commissioners of Weld County,
Colorado, pursuant to Colorado statute and the Weld County Home
Rule Charter, is vested with the authority of administering the
affairs of Weld County, Colorado, and
WHEREAS, Orville W. and Billie Jean Smith wish to construct a
wastewater treatment facility for B & B Smith Mobile Home and
Recreational Vehicle Park on the following described parcel of
land , to-wit:
Part of the Sigh of Section 31 , Township 2
North, Range 68 West of the 6th P.M. , Weld
County, Colorado
WHEREAS, the Regulations for Site Applications for Domestic
Wastewater Treatment Works require review of the Site Application
by the Board of County Commissioners before construction may be
started and , further, that various local and state agencies be
given the opportunity to review and comment on said Site
Application , and
WHEREAS, Orville W. and Billie Jean Smith have submitted
their Site Application to the Board of County Commissioners of
Weld County for review and comments, a copy of said Application
being attached hereto and incorporated herein by reference, and
WHEREAS, after study and review, the Board finds that said
Site Application is compatible with the Weld County Comprehensive
Plan and that it is in the best interest of Weld County to
recommend approval of said Application.
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Weld County, Colorado, that the Site Application
of Orville W. and Billie Jean Smith be, and hereby is, recommended
favorably to the Colorado Department of Health as being compatible
with the Weld County Comprehensive Plan.
BE IT FURTHER RESOLVED by the Board that the Chairman be, and
hereby is, authorized to sign said Site Application.
PC ';cc %I, 4/ rar,, I — I- < 861209
Page 2
RE: SITE APPLICATION - SMITH
The above and foregoing Resolution was, on motion duly made
and seconded , adopted by the following vote on the 17th day of
December, A.D. , 1986.
ATTEST: ' ., yi; „ � BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
Weld County Clerk and Recorder
and Clerk to the
11-
Board J cqu s , Chairman
BY: i&� ,/l.// `,{yG -Tem
Deputy uh � k
APPROVED AS TO FORM: Gene R. Bran er
County Attorney 1,17
Frank Yamag i
861209
COLORADO DEPARTMENT OF HEALTH
Water Quality Control Division
4210 East 11th Avenue
Denver, Colorado 80220
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF:
A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS,
OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY.
B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3))
APPLICANT: O.W. Smith and Billie Smith
ADDRESS: 29 State Hwy. 52, Longmont, CO 80501 PHONE: (303) 652-2941
Consulting Engineer's Name and Address: W.C. Squires Consulting Engineers
3515 S. Norfolk Way. Aurora. CO 80013 Attn. William C Squires PHONE: (303) 693-9116
A. Summary of information regarding new sewage treatment plant:
1. Proposed Location: (Legal Description) cw 1/4, SW 1/4, Section 31
Township 2N , Range 68W
Weld County.
2. Type and capacity of treatment facility proposed: Processes Used Extended
aeration sewage treatment plant with mechanical sludge clarifier.
Hydraulic 15,000 Organic 25. 1 to 30. 1
gal/day lbs. BOD5/day
Present PE 124.5 Design PE 184.5 % Domestic100 % Industrial -0-
3. Location of facility:
Attach a map of the area which includes the following:
(a) 5-mile radius: all sewage treatment plants, lift stations, and domestic
water supply intakes.
(b) 1-mile radius: habitable buildings, location of potable water wells, and
an approximate indication of the topography.
4. Effluent disposal: Surface discharge to watercourse none
Subsurface disposal to Boulder Creek via polishing pond (quarry pond)
after aerobic digestion.
State water quality classification of receiving watercourse(s) see text and Drawing 1
Proposed Effluent Limitations developed in conjunction with Planning and Standards
Section, WQCD: BODS 30 mg/1 SS 30 m /1 Fecal Coliform 6000
g 17000 /100 ml
Total Residual Chlorine n 5 mg/1 Ammonia 5 to 15 mg/1 Other 10 mg/1
5. Will a State or Federal grant be sought to finance any portion of this project? No
6, Present zoning of site area? Agriculture and R-5
Zoning with a 1-mile radius of site? Agriculture
7. What is the distance downstream from the discharge to the nearest domestic water
supply intake? None within 5 miles
(Name of Supply)
(Address of Supply)
What is the distance downstream from the discharge to the nearest other point of
diversion? None within 5 miles
(Name of User)
(Address of User)
-1-
WQCD-3 (Revised 8-83)
8. Who has the responsibility for operating the proposed facility? O.W. Smith
29 State Hwy. 52, Longmont, CO (303) 652-2941
9. Who owns the land upon which the facility will be constructed? O.W. Smith
(Please attach copies of the document creating authority in the applicant to
construct the proposed facility at this site.)
10. Estimated project cost: $30,000.00
Who is financially responsible for the construction and operation of the facility?
0.W. Smith
11. Names and addresses of all water and/or sanitation districts within 5 miles
downstream of proposed wastewater treatment facility site.
None
(Attach a separate sheet of paper if necessary.)
12. Is the facility in a 100 year flood plain or other natural hazard area? y„
If so, what precautions are being taken? Walls of WWTP to be reinforced concrete
with top of wall 18" above 100 year flood plain
Has the flood plain been designated by the Colorado Water Conservation Board,
Department of Natural Resources or other Agency? Colorado Water Conservation Board
(Agency Name)
If so, what is that designation? Boulder Creek 100 year flood plain
13. Please include all additional factors that might help the Water Quality Control
Division make an informed decision on your application for site approval.
B. Information regarding lift stations: Not applicable
1. The proposed lift station when fully developed will generate the following additional
load: Peak Hydraulic (MGD) - P.E. to be served -
2. Is the site located in a 100 year flood plain? _
If yes, on a separate sheet of paper describe the protective measures to be taken.
3. Describe emergency system in case of station and/or power failure. -
4. Name and address of facility providing treatment: _
5. The proposed lift station when fully developed will increase the loading of the
treatment plant to - % of hydraulic and - % of organic capacity and
agrees to treat this wastewater? Yes- No -
(Treatment Agency/))
D e Sig ature and Title
W.C. Squires Consulting Engineers
•
—2—
WQCD-3 (Revised 8-83) =•)
C. If the facility will be located on or adjacent to a site that is owned or managed by a
Federal or State agency, send the agency a copy of this application.
D. Recommendation of governmental authorities:
Please address the following issues in your recommendation decision. Are the proposed
facilities consistent with the comprehensive plan and any other plans for the area,
including the 201 Facility Plan or 208 Water Quality Management Plan,, as they affect water
quality? If you have any further comments or questions, please call 320-8333, Extension
5272.
Recommend Recommend No
Date Approval Disapproval Comment Signature of Representative
1.
Management Agency
2.
Local Government: Cities or Towns (If
site is inside boundary or within three
miles) and Sanit_tion Districts.
3. AI:) - N\
�/ B•4 • Co `►� mmiss oners
' ' di .•ti
Local He th Aut on }is
5.
City ounty Planning Authority
6.
Council of Governments/Regional Planning
7.
State Geologist
(For lift stations, the signature of the State Geologist is not required. Applications for
treatment plants require all signatures.)
I certify that I am familiar with the requirements of the "Regulations for Site Applications
For Domestic Wastewater Treatment Works," and have posted the site in accordance with the
regulations. An engineering report, as described by the regulations, has been prepared and is
enclosed.
DATE 76 0.W. Smith
Signature of Applicant TYPED NAME
-3-
e'.,T ti
WQCD-3 (Revised 8-83)
ATTACHMENT TO SITE APPLICATION
In accordance with C.R.S. 1981, 25-8-702 (2)(a), (b), and (c), and the "Regulations for Site
Applications for Domestic Wastewater Treatment Works", the Water•Quality Control Division must
determine that each site location is consistent with the longrange, comprehensive planning for
the area in which it is to be located, that the plant on the proposed site will be managed to
minimize the potential adverse impacts on water quality, and must encourage the consolidation
of wastewater treatment works whenever feasible.
In making this determination, the Division requires each applicant for a Site approval for a
domestic wastewater treatment works to supply an engineering report describing the project and
showing the applicant's capabilities to manage and operate the faility over the life of the
project to determine the potential adverse impacts on water quality. The report shall be
considered the culmination of the planning process and as a minimum shall address the
following:
Service area definition including existing population and population projections,
flow/loading projections, and relationship to other water and wastewater treatment plants
in the area.
Proposed effluent limitations as developed in coordination with the Planning and Standards
Section of the Division. (Allow minimum four weeks processing time.)
Analysis of existing facilities including performance of those facilities.
Analysis of treatment alternatives considered.
Flood plain and natural hazard analysis.
Detailed description of selected alternatives including legal description of the site,
treatment system description, design capacities, and operational staffing needs.
Legal arrangements showing control of site for the project life.
Institutional arrangements such as contract and/or covenant terms for all users which will
be finalized to accomplished acceptable waste treatment.
Management capabilities for controlling the wastewater throughout and treatment within the
capacity limitations of the proposed treatment works, i.e. , user contracts, operating
agreements, pretreatment requirements.
Financial system which has been developed to provide for necessary capital and continued
operation, maintenance, and replacement through the life of the project. This would
include, for example, anticipated fee structure.
Implementation plan and schedule including estimated construction time and estimated
start-up date.
Depending on the proposed project, some of the above items may not be applicable to address.
In such cases, simply indicate on the application form the non applicability of those.
WQCD-3 (Revised 8-83)
I"VENTCRY OF ITEMS SUBMITTED FOR CONSIDERATION
Case Number cz= Submitted or Prepared
Prior
to Hearing At Hearing
1. Application l_ Pages ^ /v
2. Application plat(s) pages) N`PE
3. DPS Referral Summary Sheet A)/4
4. PPS Recommendation
5. DPS Surrounding Propery Owner Mailing List N/ /'r
6. DPS Mineral Owners Mailing List A // A-
7. DPS Maps Prepared by Planning Technician J✓ ! / '
8. DPS Notice of Hearing /n�"'
9. DPS Case Summary Sheet ,/�/ /4 y
10. DPS Field Check /V l,�/!//
11. /vl
12.
13.
14.
15.
16.
17.
18.
19.
20.
I hereby certify that the items identified herein were submitted to the
Department of Planning Services at or prier to the scheduled Planning Commission
hearing. I further certify tha these items wer forwarded to the Clerk to the
Board's office on //� 19
l --0.14 �l l 4
Current Planner
STATE OF COLORADO )
COUNTY OF WELD )
SUBSCRIBED AND SWORN TO BEFORE ME THIS 13 DAY OF yr..t.wJ.,'�}y 19 'alp ,
SEAL 1
Cts S k\o.. 'tae
•
NO ARY PUBLIC
My Commission Expires Fob. 13, 1989 8612{i9
N9 COMMISSION EXPIRES
RESOLUTION OF THE WELD COUNTY PLANNING COMMISSION
Moved by Lydia Dunbar that the following resolution be introduced for
passage by the Weld County Planning Commission. Be it therefore Resolved by
the Weld County Planning Commission that the following be adopted:
APPLICANT: Orville W. and Billie Jean Smith
ADDRESS: 29 Colorado Highway 52, Erie, CO 80561
REQUEST: Site Application for a wastewater treatment facility for B & B
Smith Mobile Home and Recreational Vehicle Park
LEGAL DESCRIPTION: Part of the SW} of Section 31, T2N, R68W of the 6th
P.M. , Weld County, Colorado
LOCATION: Approximately 2 miles north of Erie City Limits; north of Highway
52 and east of Weld County Road One
Motion seconded by LeAnn Reid.
The Weld County Planning Commission recommends approval of this request.
The wastewater treatment facility system will not adversely affect the local
water quality and presently there is a sufficient capacity to serve the
proposed development.
The subject proposal was reviewed and approved by the Weld County Board of
Health on September 30, 1986. The Weld County Health Department is
recommending approval of the proposal.
VOTE:
For Passage Against Passage
Lydia Dunbar Paulette Weaver
Lynn Brown Ann Garrison
LeAnn Reid
Ivan Gosnell
Louis Rademacher
Jack Holman
The Chairman declared the resolution passed and ordered that a certified
copy be placed in the file of this case for a permanent record of these
proceedings.
CERTIFICATION OF COPY
I, Bobbie Good, Recording Secretary of the Weld County Planning Commission,
do hereby certify that the above and foregoing Resolution is a true copy of
the Resolution of the Planning Commission of Weld County, Colorado, adopted
on 4th of November, 1986, and recorded in Book No. X of the proceedings of
the said Planning Commission.
Dated the 5th day of November, 1986.
Bobbie Good
Secretary
November 4, 1986
APPLICANT: Orville W. and Billie Jean Smith
ADDRESS: 29 Colorado Highway 52, Erie, CO 80561
REQUEST: Site Application for -a wastewater treatment facility for B & B
Smith Mobile Home and Recreational Vehicle Park
LEGAL DESCRIPTION: Part of the SW} of Section 31, T2N, R68W of the 6th
P.M. , Weld County, Colorado
LOCATION: Approximately 2 miles north of Erie City Limits; north of Highway
52 and east of Weld County Road One
The Department of Planning Services staff recommends approval of this
request. The wastewater treatment facility system will not adversely affect
the local water quality and presently there is a sufficient capacity to
serve the proposed development.
The subject proposal was reviewed and approved by the Weld County Board of
Health on September 30, 1986. The Weld County Health Department is
recommending approval of the proposal.
U
T W
Y y m Cr•
m -
03 tc
m C -
a. ¢¢ = _
0 U Y - - -
W Z O __
3 IN
E
_, 7 J. - -
L --• L 7 _
1... ci -
Ap V C V1
Z ¢ i. U .... _ - -
O < •-",• C --. C
H C inL _
U N - - - .� --
O - ¢ _ _ - „" - _
x ' - - - _ - -
W >1 - _ .-
0. Y = Z- V. -
—
3 ¢ Z 0 - -
F n
J u. W 7 C - -
.C C ._ C.
a Cl.: T. - .-
O ._ x• cJ Lr J _ - ,_
f u
J r
6m W 4_ - . 1---. 7
_ m e t) -^ _
/ O 1 -
Ili 1
¢ CC
c q ` v. L
J p r
O _ J ._
Y f — - T
W L J "7 C C :J L
W � -C
¢ ¢ - ^W a r
, O .y .r, — 'l,
O ≥
CO - C
—
C V
Al. m — 7 L :e7 _
O,1" U i 2 7 7 O — — 'r,
GI
CCj
et
6
Hello