Loading...
HomeMy WebLinkAbout851279.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS 4201 East Arkansas Ave. ; Denver, Colorado 80222 (303)757-9011 YIELR CCl!1'l9 P r a 1 G •%a im 7�e� ‘..',00.",.- SEP 1 ti985 n• 1,1 ) IF85-38 L, ighway News ' co...+La. Sept. 12, 1985 FOR MORE INFORMATION: 757-9228 RELEASE AT WILL CONSTRUCTION BIDS OPEN FOR U.S. 36 BRIDGE REPLACEMENT "We had a Denver-Boulder Turnpike detour built during a weekend. A contractor hired on an emergency basis is building U.S. 36 bridge piers. Now, having opened the sealed bids on bridge deck replacement, we can concentrate on opening U.S. 36 to a regular flow of traffic by the first of December. " Those were the words of Highway Commissioner Richard J. Albrecht, Fort Collins, when he learned of bid results read aloud Thursday, September 12 at the Division of Highways construction bid opening in Denver . A combined project replaces the U.S. 36 bridge near 108th Avenue in Broomfield wrecked August 2 by a Burlington Northern railroad accident. The project calls for deck replacement and removal of the four-lane detour which presently serves motorists . There were ten offers accepted at the bid opening. An apparently successful bid of $594, 945, from Edward Kraemer & Sons, Inc. of Plain, Wisconsin, was 30 percent below the engineer ' s estimate for this work. Technically, the combined project is numbered FR 036-1(32) and CC 11-0036-07. It begins four tenths of a mile northwest of the railroad overpass and extends eight tenths of a mile southeast. It includes bridge replacement, grading, hot bituminous pavement, striping, guardrail, topsoil, seeding, mulching and detour removal . Resident engineer is Steve Horton of Arvada; the combined project requires completion within 85 working days. Some detour removal work may occur after the expected December 1 opening to traffic. (more) ( over) 851279 c1 [ ,J`l, / , , , Page 2 -- Highway News Department of Highways Sept. 12, 1985 BID OPENING CORRECTIONS It happens. Sealed envelopes are opened for a construction project by Department of Highways engineers at a typical Thursday morning session, the numbers are called out, and the "apparently successful bid" amount and contractor name are published. Later that day, careful calculations are made and the amount read aloud proves to be inaccurate. It happened twice September 5. Colorado's first urban interchange at South Santa Fe Drive and Evans Ave. in Denver was bid by Irving F. Jensen Construction Company at $6,337,710, not the $6,346,699 figure read aloud when bids were opened. The combined project is IXFU 085-2(26) , FCU 085-2(25) , and CC 01-0085-01 . Set-Aside project BRF 050-3(31) also has a corrected calculator bid total . Available only to minority business enterprises, this project replaces a U.S. 50 bridge deck east of Pueblo. Marquo, Inc. of Castle Rock actually bid $392,372, not the amount $392,312 read aloud in the Department of Highways auditorium in Denver September 5. Neither calculated total affects the lowest-bidder status of the firms. 000 SR 0069 (14) S.H. 69 NORTH OF GARDNER The Department's Division of Highways accepted five bids at the September 12 opening for a project to widen 3.28 miles of S.H. 69 north of Gardner. Walsenburg Sand & Gravel Company submitted an apparently successful bid of $808,813 for the project, which requires completion within forty five working days following its Notice to Proceed. Work begins 3.3 miles south of the Huerfano/Custer county line and extends north. Elements include grading, structures, stabilization, hot bituminous pavement, precast concrete box culvert, striping, seeding and mulching. Jilliam Rjzley, Jr. of Pueblo is resident engineer. 000 MP 01-0002-41 COLORADO BLVD. IN DENVER Crabtree Corp. of Denver turned in an apparently successful bid of $65,822 at the Division of Highways September 12 opening to improve the median on Colorado Blvd. near Martin Luther King Drive in Denver. A Set-Aside project restricted bidding to certified, prequalified minority business enterprises only. Two minority firms bid the work, which begins north of 30th Ave. on S.H. z and extends three tenths of a mile north to 34th Ave. The project, scheduled for completion within fifteen workable days, consists of median edging, median cover, landscaping and sprinkler system. Resident engineer is J.C. Seitz of Denver. 000 Highway News Page 3 Department of Highways Sept: 12, 1985 C 10-0177-15 UNIVERSITY BLVD. SOUTH OF DENVER Resident engineer J. J. Ward of Englewood will coordinate the resurfacing of four miles of University Blvd. through Greenwood Village and Arapahoe county, if contract award follows Division of Highways bidding activity of September 12. Six firms bid work which begins a tenth of a mile south of Belleview Ave. (S.H. 88) and extends south to County Line Road. The project includes hot bituminous pavement overlay, striping and planing past residential neighborhoods and the Southglenn shopping mall . Construction is scheduled to be completed within twenty working days after it starts. Western Paving Construction Co. of Denver turned in an apparently successful bid of $317,750. 000 C 04-0083-37 ACADEMY BLVD. IN COLORADO SPRINGS Resurfacing S.H. 83 in Colorado Springs drew two bids when Division of Highways engineers opened sealed envelopes September 12. A 1 .69-mile project between Maizeland Road and Templeton Gap Road includes hot bituminous pavement overlay and striping. Broderick & Gibbons, Inc. of Pueblo turned in an apparently successful bid of $250,420 for the project, which requires completion within 25 workable days. V. D. Anders of Colorado Springs is resident engineer. 000 C 52-0096-11 S.H. 96 IN CUSTER COUNTY A & S Construction Co. of Canon City submitted an apparently successful bid of $257,564 at the Division of Highways September 12 opening to resurface five miles of S.H. 96 in Custer county. Consisting of hot bituminous pavement overlay and striping, the project begins six miles east of Westcliffe and extends easterly. Three firms bid the project, which is scheduled to be completed within twenty working days. Resident engineer is William Rizley of Pueblo. 000 (over) Highway News Page 4 Department of Highways Sept. 12, 1985 BIDS TO BE OPENED Oct. 3: 9:30 a.m. , Resurfacing S.H. 10 northeast of Walsenburg, consisting of grading, structures, stabilization, hot bituminous pavement, striping, topsoil , seeding and mulching, beginning about 81/2 miles northeast of Walsenburg and extend- ing 2.2 miles northeasterly, in Huerfano county, FR 010-1 (17) . 9:45 a.m. , Resurfacing U.S. 85 north of Brighton, consisting of hot bituminous pavement overlay, beginning half a mile north of Brighton and extend- ing 5.4 miles north in Weld county, MP 03-0085-21 . 000 CONTRACTS AWARDED Road/ Bid Contract Project Street Description Awarded to Opening Awarded BRS 0037(1 ) SH 37 A bridge rehabili- Dumar Contractors, 8/22/85 8/28/85 tation project on Inc. $349,772 S.H. 37 in Weld county. BRO 0044(2) Replacing a bridge Sewell Construction 8/22/85 9/5/85 on Vail Valley $136,374 Drive over Gore Creek in Vail . FR 082-1 (12) SH 82 Channelizing an Grand River Construc- 8/29/85 9/5/85 intersection on tion Co. $385,975 S.H. 82 west of Basalt MP 04-0024-24 US 24 To resurface 5.3 Schmidt-Tiago Con- 8/29/85 9/5/85 miles of U.S. 24 struction Co. in El Paso county. $458,282 I-25-2(194) I-25 Combined project Westbrook Con- 8/29/85 9/10/85 IXFU 470-1 (59) C-470 providing light- struction, Inc. ing, signing, $2,459,121 landscaping, strip- ing and sprinkler system, south of Denver on I-25 and the C-470 Centennial Parkway. MP 02-0050-19 US 50 Resurfacing of 2.37 Broderick & Gibbons, 8/29/85 9/5/85 miles of U.S. 50B Inc. $291 ,597 in Pueblo. try , t ETA. E OF COLORADO DEPARTMENT OF HIGHWAYS SEP 1 6 1985 - �0, or„ 4201 East Arkansas Ave. II ij ittptt Denver, Colorado 80222 (303) 757-9011 Glt . L '-r 8 #85-39 F°�`°- FOR MORE INFORMATION: 757-9228 Highway News (Special Release) BUDGET FACTS, 1985-86 September 13, 1985 HIGHWAY CONSTRUCTION BUDGET, $291 .1 MILLION Governor Richard D. Lamm signed the Department of Highways construc- tion budget August 23, 1985 making official the list of projects the agency intends to advertise during the current fiscal year which began July 1. Project lists follow this short introduction. They reflect "category" allocations to Colorado designated by the federal government. State officials can' c switch money from the Interstate construction category to Bridge Re- placement spending, for example, nor from the Primary road category (U.S. - designated numbers) to Interstate 4R (resurfacing, restoration, rehabilitation and reconstruction) . The budget includes projects totaling $42.2 million in Glenwood Canyon for a series of Interstate 70 projects on Colorado's western slope, and $17 million toward the extension of Interstate 76 in Adams and Jefferson counties . Almost $35 million is budgeted for the C-470 Centennial Parkway southwest cir- cumferential route around metropolitan Denver; this is new design, right-of-way and construction funding beyond Phase I which is scheduled to allow four lane travel between Interstate 25 and South Santa Fe Drive beginning December 7, 1985. Interstate 70 travelers may be happy to learn that the new budget pro- vides for three new rest areas. Two are in Kit Carson county on the high plains, near Flagler and Burlington. A third is proposed at the 22 Road inter- change about four miles west of Grand Junction. Persons interested in specific geographic areas of Colorado should watch for county references, by project, under each funding category in the list which follows. The following page sums up funding categories. The totals combine federal aid (where applicable) with state or local matching funds. (MORE) (OVER) ,pd rATA cii/g/e, Highway News Page 2 Department of Highways 1985-86 Budget Total Interstate construction $ 64.4 million Interstate 4R (resurfacing, restoration, rehabilitation, reconstruction) $ 57. 5 million Interstate Transfer (Denver area) $ 49. 1 million Primary (includes 4R funds) $ 43.5 million Secondary (includes 4R funds) $ 13.5 million Urban System $ 12.9 million Bridge Replacement $ 26.8 million Elimination of Hazards $ 3.1 million Rail/Highway protection devices $ 1 .5 million Rail/Highway elimination of hazards $ 1 .5 million Highway planning and research $ 3.9 million Metropolitan planning $ 859 thousand State projects, no federal aid $ 10.0 million Reimbursable projects paid by others $ 2.2 million The construction budget estimates revenue for the fiscal year. It is "fine-tuned" several times each year by the State Highway Commission with budget Supplements. Circumstances prompting a supplemental budget might be a project cost overrun, the emergency need for road repair following a mudslide, or an influx of discretionary money (at the discretion of the Secretary of Transpor- tation) from the federal government, for example. All projects in the budget have been approved by local officials , councils of government, metropolitan planning organizations and planning commissions in accordance with the Department's "Five Year Program of Projects." The program is developed on the basis of priorities presented by local elected officials at Highway Commission hearings each autumn, and on the basis of the sufficiency and condition of state highways and bridges . This autumn the county hearings (affecting the 1986-87 budget) are sched- uled to occur in Grand Junction November 8, in Colorado Springs on November 18, and in Denver on November 22. Highway News Page 3 Department of Highways 1985-86 Budget INTERSTATE PROJECTS (91% Federal, 9% State) ($64 , 400.000) I 70, East end of Debeque Canyon, new construction, re- taining walls and construction, 4 miles, Mesa county, $1, 578 , 000. I 70, Glenwood Canyon, new construction and preliminary engineering, 12 . 6 miles, Garfield and Eagle counties, $6, 902 , 000. I 70, Grizzly Creek - west (eastbound) , new construction, 1. 3 miles, Garfield county, $9, 123 , 000. I 70, Shoshone Power Plant Interchange, eastbound, new con- struction-structures, 0. 8 mile, Garfield county, $14 , 795,000. I 70, Reverse Curve, eastbound, new construction, Garfield county, $3, 632,000. I 70, Reverse Curve Tunnel, new construction-tunnels, 0. 1 mile, Garfield county, $6,762, 000. I 70, Glenwood Canyon Traffic Control Support, new con- struction, signing and flagging, Garfield county, $1, 008 ,000. I 70, Junction at C-470 Interchange (south) , new route, construction, 1. 9 miles, Jefferson county, $1, 978 , 000. 170, Junction at C-470 Interchange Structures, new route, structures and construction, Jefferson county, $1, 560,000. I 76, Junction I 70 to Junction I 270, new route and right of way, 6 . 8 miles, Adams and Jefferson counties, $7 ,072,000. I 76 over Lowell Blvd. , new route, structure and construc- tion, Adams county, $1, 200, 000. I 76 , Lowell Blvd. to Federal Blvd. - Clear Creek struc- tures, new route, structures and construction, Adams county, $3 , 280, 000. I 76 at Federal Blvd . , new route, structures and construc- tion, Adams county, $1, 650,000. I 76, Clear Creek east of Lowell Blvd. , new route - channel change and construction, Adams county, $550, 000. I 76, Federal Blvd. improvements, new route - reconstruc- tion and construction, 0. 3 mile, Adams county, $1, 310,000. Highway News Page 4 Department of Highways 1985-86 Budget I 76, Tennyson to Lowell , new route - grading and construction, 0. 5 mile, Adams county, $2, 000, 000. INTERSTATE 4R Resurfacing, Restoration, Rehabilitation and Reconstruction (91% Federal, 9% State) ($57, 453 ,000) I 25, Larkspur - north, signing, preliminary engineering and construction, 11. 2 miles, Douglas county, $228 ,000. I 25, north of U.S. 85 junction, signing and preliminary engineering, ten miles, Douglas county, $21,000. I 70, Lawson to Idaho Springs, bridge deck widening, reha- bilitation, preliminary engineering and construction, 3 . 8 miles , Clear Creek county, $2, 694,000. I 70, Bakerville to Georgetown, resurfacing, preliminary engineering and construction, 6 . 3 miles, Clear Creek county, $2, 102,000. I 70 , Lawson - east, bridge widening and rehabilitation and preliminary engineering, 1. 4 miles, Clear Creek county. $242,000. I 70, Floyd Hill - west, resurfacing and safety and pre- liminary engineering, one mile, Clear Creek county, $105,000. I 70, east of Idaho Springs - east, reconstruction and preliminary engineering, 1.4 miles, Clear Creek county, $52,000. I 70, Colfax Ave. - east and west, restore, rehabilitate, preliminary engineering and construction, 1 . 1 miles, Adams county, $1, 126,000. I 70, east of Strasburg, bridge rehabilitation and widen- ing, preliminary engineering, one mile, Arapahoe county, $105,000. I 70, east of Airpark Road, resurfacing, construction, 3 . 3 miles, Adams and Arapahoe counties, $634,000. I 70, east of Agate - east, reconstruction and preliminary engineering, 5 . 5 miles, Elbert county, $207,000. Highway News Page 5 Department of Highways 1985-86 Budget I 70, east of Limon - east, resurfacing, safety, prelimi- nary engineering and construction, 4 . 3 miles, Lincoln county. $1, 801,000. I 70, Burlington Rest Area, new rest area, preliminary en- gineering and construction, Kit Carson county, $630,000. I 70, at Republican River, new rest area, preliminary en- gineering, Kit Carson county, $116,000. I 70, at Junction S.H. 71, bridge rehabilitation, prelimi- nary engineering, Lincoln county, $26,000. I 25, Aguilar - north and south, resurfacing, preliminary engineering and construction, 8 .4 miles, Las Animas county. $3 , 644,000. I 25, north of Harrison Rd . to north of Tejon St . , resur- facing, preliminary engineering, right of way and utilities, 1.7 miles, El Paso county, $123 ,000. I 25, Garden of the Gods Road Interchange, modify inter- change, preliminary engineering, right of way and utilities, El Paso county, $589,000. I 25, Pine Creek - north, resurfacing, preliminary engin- eering and construction, 7 . 3 miles, El Paso county, $2, 697, 000. I 25, USAF Academy North Boundary - north, resurfacing and preliminary engineering, 2.8 miles, El Paso county, $90,000. I 25, Sand Creek - one mile north of El Paso county line, bridge rehabilitation, preliminary engineering, utilities and con- struction, $444,000. I 25, two miles north of Pueblo/E1 Paso county line, bridge rehabilitation, preliminary engineering, utilities and construction, El Paso County, $287,000. I 25, half a mile north of U. S. 85, bridge rehabilitation, preliminary engineering, utilities and construction, El Paso county, $957,000. I 25, half a mile north of U. S. 38, bridge rehabilitation, preliminary engineering, utilities and construction, El Paso county, $586,000. Highway News Page 6 Department of Highways 1985-86 Budget I 70, Palisade - east, resurfacing, bridge rehabilitation, preliminary engineering and construction, 7 . 9 miles, Mesa county, $5, 088,000. I 70, 22Rd. Interchange Rest Area, new rest area, prelimi- nary engineering, utilities and construction, Mesa county, $578,000. I 70, Eagle Interchange, bridge rehabilitation, preliminary engineering and construction, Eagle county, $541,000. I 70, Wolcott - east, resurfacing and safety and prelimi- nary engineering, 12 miles, Eagle county, $220,000. I 70, east of Wolcott - east. resurfacing, preliminary en- gineering and construction, 2. 5 miles. Eagle county, $1, 260, 000 . I 25, County Rd . 26 - north, resurfacing, preliminary en- gineering, right. of way, utilities and construction, five miles , Larimer county, $8 , 026,000. I 25, S.H. 392 - north, resurfacing, preliminary engineer- ing and utilities, 4 . 8 miles, Larimer county, $511,000. I 25, north of S.H. 402, three locations, bridge widening and construction, Larimer county, $630,000. I 25, Little Thompson River and St . Vrain, bridge widening, preliminary engineering, right. of way and utilities, Larimer county, $103,000. T 25, Prospect Road Interchange in Fort Collins - north, resurfacing, preliminary engineering and utilities, 4 . 8 miles, Larimer county, $300, 000. I 25 and I 70 Interchange, modify Denver ' s "Mousetrap" in- terchange and preliminary engineering, Denver , $300, 000. I 25 , Junction U. S . 40 and S.H. 33 Interchange, modify in- terchange and preliminary engineering, Denver, $219,000 . I 25, 6th Avenue ramps F and C, modify interchange and con- struction, Denver, $442 , 000. I 25, Colorado Blvd. - north, resurfacing, preliminary en- gineering and construction, three miles . Denver, $1, 162 ,000 . Highway News Page 7 Department of Highways 1985-86 Budget I 25, at Dry Creek and County Line Road - northbound, transportation systems management-ramp metering, preliminary engineering, utilities and construction, Arapahoe county, $630, 000. I 25, 6th Avenue, 8th Avenue Off Ramp, modify interchange and construction, Denver, $3,755,000. I 25, 6th Avenue Ramp E - eastbound to northbound, modify interchange and construction, Denver , $4, 561,000. I 25 and I 70 Interchange (phase I ) , modify Denver ' s "Mousetrap" interchange, preliminary engineering, right of way and utilities, Denver, $600,000. 125 from C-470 to l 225, major widening and preliminary engineering, 5.2 miles, Arapahoe, Denver and Douglas counties, $110,000. I 25, 19th Street - North, High Occupancy Vehicle Lane, HOV Lane Study and preliminary engineering, 12 . 2 miles, Denver and Adams counties, $100,000. I 25, 44th Avenue structure, bridge replacement and con- struction, Denver, $1, 840,000. I 25, Junction Lincoln Avenue, bridge rehabilitation, pre- liminary engineering and construction, Douglas county, $1, 155, 000. 125, Junction U.S. 36, transportation systems management, modify interchange and construction, Adams county, $210, 000. I 70 at C-470 Interchange Structures, new route--structures and construction, Jefferson county, $960,000. I 70, Junction W. 32nd Avenue, transportation systems man- agement - signal improvements, preliminary engineering and construc- tion, Jefferson county, $79, 000. I 70, Junction Kipling Street, transportation systems man- agement, signal improvements and preliminary engineering, Jefferson county, $59, 000. I 70 from I 25 to Washington Street, noise abatement, pre- liminary engineering and construction, 0. 6 mile, Denver, $485,000. Highway News Page 8 Department of Highways 1985-86 Budget I 70, at Tower Road, bridge replacement, preliminary en- gineering, right of way, utilities and construction, Adams county, $504, 000. I 70, I 270 and Quebec Street Interchange, modify inter- change, preliminary engineering, right of way and utilities, Denver. $525,000. I 70, at Chambers Road, bridge replacement , preliminary engineering, right of way, utilities and construction, Adams county, $1, 524, 000. I 70, I 25 to Washington Street, modify interchange and construction, Denver , $1, 124,000. I 225 from U.S. 40 to Smith Road, noise abatement and pre- liminary engineering, 1. 6 miles, Adams county, $110,000. I 270, Junction York Street, transportation systems man- agement - ramp metering, preliminary engineering and construction. Adams county, $236,000. INTERSTATE TRANSFER APPORTIONED AND DISCRETIONARY (Apportioned "by formula. " Each is 85% Federal, 15% State or Local . These are all Denver area projects from I-470) ($49, 132,000) Littleton railroad depression, new route - preliminary engineering and utilities, 1. 6 miles, Arapahoe and Jefferson counties, $27, 000. Prince Street to Flume structure, new route - structures, depression and construction, 0. 3 mile, Arapahoe and Jefferson counties, $4, 100, 000. South Santa Fe Drive, Mississippi Avenue to C- 470, major widening, preliminary engineering, right of way and utilities , 9 . 6 miles, Denver and Arapahoe counties, $2, 119,000. South Santa Fe Drive and Belleview Interchange, from Crest- line Avenue to Big Dry Creek, major widening and interchange, pre- liminary engineering, right of way and utilities, 0.7 mile, Arapahoe county, $742, 000. Highway News Page 9 Department of Highways 1985-86 Budget South Santa Fe Drive south of Hampden Avenue to Yale Avenue, railroad relocation, utilities and construction, 1 . 9 miles , Denver and Arapahoe counties, $538, 000. South Santa Fe Drive at Hampden Avenue, interchange, pre- liminary engineering, right of way and utilities , one mile, Arapahoe county, $760,000. South Santa Fe Drive from Big Dry Creek to Hampden Avenue, major widening, grade separation, preliminary engineering, right of way and utilities, 1.7 miles, Arapahoe county. $934, 000. South Santa Fe Drive north of Hampden Avenue to Yale Avenue, major widening, grade separation, preliminary engineering, right of way and utilities, one mile, Arapahoe county. $2, 445,000. South Santa Fe Drive over Hampden Avenue, railroad bridge and construction, Arapahoe county, $700,000. Belleview Avenue, Platte River Bridge to South Santa Fe Drive, major widening and construction, 0 . 8 mile, Arapahoe county. $309 , 000. Wadsworth Blvd . at the Hampden, Jewell, Mississippi , 1st. and 6th Avenue intersections, modify intersections, preliminary en- gineering, right of way and utilities, Jefferson county, $543 ,000. Wadsworth Blvd. at West Alameda Ave. ( S .H. 26) , modify intersection and construction, 0. 3 mile, Jefferson county. $1,783 ,000. Rooney Road connection to C-470, new route - structures and construction, Jefferson county, $811,000. C-470 at Alameda Avenue and Open Space Access Road struc- tures, new route - grade, drain, pavement, structures and con- struction, 0.7 mile, Jefferson county, $2, 491,000. C-470 from I 70 to north of Morrison Road . , new route - grade, drain and construction, three miles, Jefferson county $3 , 611, 000. C-470 from Morrison Road. to Hampden Avenue new route - grade, drain, paving and construction, 1. 6 miles . Jefferson county, $4, 659,000. a Highway News Page 10 Department of Highways 1985-86 Budget C-470 and Wadsworth Blvd. Interchange, new route - grade. drain, paving and construction, 0.7 mile, Jefferson county, $5, 551,000. C-470 from Ken Caryl Road to north of Wadsworth Blvd. , new route - paving and construction, 3 .7 miles, Jefferson county, $4, 725, 000. C-470 from Hampden Avenue to South Santa Fe Drive (Phase III-Right of Way) , new route, preliminary engineering, right of way and utilities , 5 . 9 miles , Jefferson and Arapahoe counties , $2, 604,000. C-470 from I 70 to Hampden Avenue (Phase III Right of Way) , new route, preliminary engineering, right of way and utilties, 5. 2 miles, Jefferson county, $6, 907, 000. Kipling - Independence Streets in Arvada, new route, pre- liminary engineering, right of way and utilities, 1 . 6 miles, Jeffer- son county. $1,417,000. Kipling Street - Ridge Road and railroad structures, new route - railroad grade separation and construction, Jefferson county, $1, 356,000. PRIMARY PROJECTS (84% Federal, 16% State) ($14 , 401,000) I 25 to Hancock Expressway in Colorado Springs, structures - Phase I , new route, preliminary engineering, right of way, utili- ties and construction, five miles, El Paso county, $4, 047,000. Trinidad Bypass, new route, preliminary engineering, right of way, utilities and construction, one mile, Las Animas county, $817 , 000. 47th St . Parkway in Boulder from Table Mesa Drive to - S.H. 119, new route, preliminary engineering, right of way and utilities, four miles , Boulder county, $2, 413,000. Highway News Page 11 Department of Highways 1985-86 Budget Foothills Parkway from Valmont Street to S.H. 119 in Boulder, new route and construction, 0.7 mile, Boulder county, $1, 950,000. Fort Collins Expressway, Environmental Impact Statement supplement and preliminary engineering, 3 . 5 miles, Larimer county, $25, 000. U.S. 287 . around LaPorte, Overland Trail - east, new route and construction, 5 . 3 miles, Larimer, $5, 149,000. PRIMARY 4R PROJECTS Resurfacing, Restoration, Rehabilitation, Reconstruction (84% Federal, 16% State) ($29, 115,000) S.H. 9 North of Silverthorne - north, minor widening and preliminary engineering, 2 . 5 miles, Summit county, $131,000. U.S. 24 east and west of Simla, minor widening and resur- facing and preliminary engineering, 4. 5 miles, Elbert county, $121,000. U.S. 36 from the East Junction of I 70 at Byers - east, resurfacing and preliminary engineering, 4. 5 miles, Arapahoe county, $61,000. U.S. 40 east of Wild Horse, resurfacing and safety, pre- liminary engineering, 3 . 1 mles, Cheyenne county, $99,000. S.H. 71 South of Limon - south, minor widening and resur- facing, preliminary engineering and construction, 7 .7 miles, Lincoln county, $1, 819,000. S.H. 71 at a site 16 . 8 miles south of U. S . 36, bridge re- placement, preliminary engineering and construction, Lincoln county, $405, 000. S.H. 71 at a site 9 . 5 miles north of Limon - north, bridge replacement and preliminary engineering, one mile, Lincoln county, $92, 000. Highway News Page 12 Department of Highways 1985-86 Budget Parker Road (S.H. 83 ) from Arapahoe Road to Lincoln Avenue, major widening, preliminary engineering, right of way, utilities and construction, 1. 5 miles, Arapahoe county, $2, 894,000. U. S . 85 from the I 25 junction at Castle Rock northwest to Arapahoe/Douglas county line, major widening and preliminary en- gineering, 16 miles, Douglas county, $252,000. U.S. 285 northeast of Webster, minor widening, preliminary engineering, right of way, utilities and construction, three miles , Park county, $2, 379 , 000. U. S . 285 northeast of Grant, minor widening and preliminary engineering, three miles, Park county, $135,000. Various Locations in District II , traffic signals pool, preliminary engineering and construction, various counties, $116, 000. S.H. 47 in Pueblo from I 25 east to Jerry Murphy Road (3rd phase) , major widening, preliminary engineering, right of way, util- ities and construction, one mile, Pueblo county, $750, 000. U.S. 50 from a site 3 .7 miles east of Cotopaxi - east, safety, traffic operations, transportation systems management, passing lane, preliminary engineering, right of way and utilities, 0. 6 mile, Fremont county, $60, 000. U. S . 50 from Pueblo Blvd. (S.H. 45) - west (westbound lane) , resurfacing, preliminary engineering and construction, six miles, Pueblo county, $1, 270,000. U. S. 50 at the junction of U.S. 287 (Wiley Junction) , new interchange, preliminary engineering, right of way and utilities, Prowers county, $230, 000. U.S. 350 from a point 6 . 3 miles east of Thatcher - east, resurfacing, preliminary engineering and right of way, 2 . 5 miles , Las Animas county, $54,000. S .H. 13 north of Rifle from 20th Street to S .H. 325, major widening, preliminary engineering, right of way, utilities and construction, two miles, Garfield county, $1, 979,000. Highway News Page 13 Department of Highways 1985-86 Budget S.H. 13 north of Craig from 2 . 9 miles north of Fortifi- cation Creek - north, minor widening, preliminary engineering, right of way, utilities and construction, two miles, Moffat county, $1, 500,000. U. S. 24 south of Leadville, minor widening and preliminary engineering, 1. 2 miles, Lake county, $144,000. U.S. 50 from a location 5 . 4 miles south of Delta - south, major widening, preliminary engineering and right of way, 5 . 1 miles, Delta and Montrose counties, $81,000. S.H. 82 Basalt Bypass bridges, new structures and construc- tion, Pitkin and Eagle counties, $2,766,000. S.H. 82 east of Basalt through Aspen, reconstruction and preliminary engineering, 14. 8 miles, Pitkin county. $99,000. Various locations in District IV, traffic signals - Pool, preliminary engineering, utilities and construction, various counties, $429 ,000. ii U. S. 6 from 1. 1 mile east of the Sterling eastern city limit - east, resurfacing, preliminary engineering, right of way, utilities and construction, 1. 5 miles, Logan county, $400,000. S.H. 14 east of S.H. 52 - east, near Raymer, minor widen- ing, preliminary engineering, utilities and construction, 6 . 2 miles, Weld county, $1, 259,000. S.H. 14 at Pawnee Hill west of Sterling, minor widening, preliminary engineering, right of way, and utilities, four miles, Logan county, $131,000. S.H. 14 east of County Road 5, minor widening and construction, two miles, Latimer county, $1, 301, 000. U. S . 34 east of Greeley, Mile Post 133 . 1 - east, major widening, preliminary engineering, right of way and utilities , 1. 6 miles, Weld county, $100,000. Junction U.S. 50 and U.S . 285 , west of Salida, modify in- tersection, preliminary engineering and construction, Chaffee county, $231,000. Highway News Page 14 Department of Highways 1985-86 Budget U. S . 160 from Wolf Creek Pass to Alberta Snow Shed, major widening, preliminary engineering and construction, 1. 5 miles , Mineral county, $3 , 360, 000. U.S. 550 from Rockwood to Purgatory ski area, major widen- ing, preliminary engineering and right of way, 11 miles, LaPlata county, $184,000. U.S. 6 west of Kipling Street, resurfacing, preliminary engineering and construction, one mile, Jefferson county, $350,000. Denver-Boulder Turnpike wrecked bridges, on U.S. 36 at Burlington Northern Railroad structure, structure improvement and major widening, preliminary engineering and construction, Jefferson county, $400, 000. Parker Road, at Lehigh Avenue near Cherry Creek State Rec- reation Area, transportation systems management, signals, prelimi- nary engineering and construction, Arapahoe county, $95,000. U.S . 85 south of Littleton, from C-470 to Church Street, major widening and preliminary engineering, four miles, Arapahoe and Douglas counties, $45 ,000. S .H. 93 north of Golden, from S.H. 58 to S.H. 72 , major widening, preliminary engineering, right of way and utilities, 6 . 9 miles, Jefferson county, $214,000. S.H. 93 north of Golden, from 2 . 1 miles south of S .H. 72 - north, major widening and construction, one mile, Jefferson county, $1, 147,000. Wadsworth Blvd. , all the way from C-470 to Miramonte Blvd. in Broomfield, corridor improvement study and preliminary en- gineering, 27 . 4 miles, Jefferson and Boulder counties, $78 ,000 . South Carr Street (S.H. 121) south of the Southwest Plaza Mall , from Peakview Ave. - south, transportation systems management - intersection improvements, preliminary engineering and construc- tion, Jefferson county, $181,000. Highway News Page 15 Department of Highways 1985-86 Budget U. S. 287 at S.H. 128 in Broomfield, modify intersection, preliminary engineering, right of way, utilities and construction, Adams county, $1, 349, 000. U.S. 287 from West 10th Avenue. , to S.H. 42 north of Broom- field , major widening, preliminary engineering and right of way, 2. 9 miles, Boulder county, $424,000. SECONDARY 4R PROJECTS Resurfacing, Restoration, Rehabilitation, Reconstruction (84% Federal, 16% State) ($13, 537,000) S.H. 51 south of Brighton, from I 76 to Bromley Lane, minor widening and preliminary engineering, 3 . 5 miles, Adams county, $63 ,000. S.H. 94 west of Punkin Center, resurfacing and safety, pre- liminary engineering and construction, 12.2 miles, Lincoln county, $1, 232,000. S.H. 119 south of Rollinsville - north, minor widening (stage construction)-grade, drain, preliminary engineering and con- struction, four miles, Gilpin county, $957,000. S.H. 119 north of S.H. 46, minor widening (stage construc- tion) grade, drain and preliminary engineering, 5 .7 miles, Gilpin county, $151,000. S.H. 12 east and west of Valdez, reconstruction, prelimi- nary engineering, right of way, utilities and construction, 1. 7 miles, Las Animas county, $1, 106,000. S.H. 12 west of Valdez, reconstruction, preliminary en- gineering, right of way and utilities, 1. 5 miles, Las Animas, $90,000. S.H. 109 southeast of LaJunta, relocation, preliminary en- gineering, right of way, utilities and construction, 2. 6 miles, Otero county, $947,000. Highway News Page 16 Department of Highways 1985-86 Budget S.H. 194 from 8 . 5 miles west of Las Animas - east, resur- facing and preliminary engineering, 4 .4 miles, Bent county, $46,000. S .H. 65 in Plateau Canyon east of Grand Junction, minor widening, preliminary engineering and right of way, seven miles . Mesa county, $412,000. S.H. 90 from the western urban boundary of Montrose - west, minor widening, resurfacing and construction, one mile, Montrose county, $1,000,000. S.H. 133 west of Somerset, reconstruction, preliminary en- gineering, right of way and utilities, four miles, Delta and Gunnison counties, $469,000. S.H. 133 from the Fire Mountain Canal Intake - west, recon- struction and construction, 1. 1 mile, Delta and Gunnnison counties, $2, 271,000. S.H. 52 east of Hudson, resurfacing, preliminary engineer- ing, right of way, utilities and construction, five miles, Weld county,$473, 000. S .H. 59 for 1 . 5 miles south of Haxtun, minor widening, pre- liminary engineering, right of way, utilities and construction, Phillips county, $529,000. S.H. 59 from the Yuma/Phillips County Line - north, minor widening, preliminary engineering, right of way and utilities, three miles, Phillips county, $62, 000. S.H. 61 north of Otis , resurfacing, preliminary engineer- ing, right of way, utilities and construction, three miles, Washington county, $741,000. S.H. 63 north of Akron, north, minor widening, preliminary engineering, right of way and utilities, three miles, Washington county, $61,000. S.H. 140 south of the La Plata River , reconstruction and preliminary engineering, five miles, La Plata county, $32,000. S .H. 142 west of San Luis, resurfacing, preliminary en- gineering and construction, 13 miles, Costilla county, $1, 281,000. Highway News Page 17 Department of Highways 1985-86 Budget S.H. 184 north of Mancos, resurfacing, preliminary en- gineering and construction, four miles, Montezuma county, $589,000. Various locations in the Denver metro area, resurfacing, preliminary engineering and construction, several counties, $525, 000. Indiana Street (S.H. 72) from 64th Avenue to 84th Avenue northwest of Arvada, major widening and preliminary engineering, 1. 6 miles, Jefferson county, $290, 000. Access control demonstration projects on Arapahoe Road south of Denver, from 125 to Parker Road (S.H. 83 ) , transportation systems management-spot improvements, preliminary engineering, right of way, utilities and construction, 4 . 8 miles, Arapahoe county. $210, 000. URBAN SYSTEM COMMUNITIES OVER 200, 000 POPULATION (Pool monies used at the discretion of the community) (78% Federal, 22% State or Local) ($9 , 745,000) Colorado Springs, (Pool) , El Paso county„ $1, 292, 000. Pikes Peak Council of Governments, (Pool) , El Paso, $373 ,000. Denver, (Pool) , $236,000. West Alameda Avenue, Sheridan to Knox court, reconstruc- tion, preliminary engineering, right of way and utilities, Denver. $1, 817, 000. Denver Ridesharing ( ' 86) , ridesharing and preliminary en- gineering, Denver, $100, 000. Various locations in Denver, traffic signal reconstruction, preliminary engineering and construction, $239,000. Broadway at Evans in Denver , intersection improvement, pre- liminary engineering, $174,000. Quebec/Tamarac Street, Girard Avenue to Yale Avenue, medi- an, landscaping, resurfacing, bikepath, preliminary engineering, right of way, utilities and construction, Denver , $304,000. Highway News Page 18 Department of Highways 1985-86 Budget Denver Regional Council of Governments (DRCOG) , (Pool) , various counties, $26,000. Belleview Avenue at Holly Street, east and west, major: widening, utilities and construction, 0.7 mile, Arapahoe county,$1, 218,000. Sheridan Avenue at 80th Avenue in Westminster , safety, traffic operations , transportation systems management, preliminary engineering and construction, Jefferson county, $358 ,000. Denver Regional Council of Governments (DRCOG) , ridesharing ( ' 86) , ridesharing and preliminary engineering, various counties other than Denver, $246,000. Kipling Street at Ridge Road in Arvada, structures and con- struction, Jefferson county, $1, 588 , 000. Kipling Street at West Colfax Avenue in Lakewood, safety, traffic operations, transportation systems management, preliminary engineering, right of way and construction, Jefferson county, $517,000. Pecos St. and West 64th Avenue, safety, traffic operations, transportation systems management, preliminary engineering and con- struction, Adams county, $404,000. West 44th Avenue from Tabor Street. to Youngfield Street in Wheat Ridge, major widening, preliminary engineering and construc- tion, half mile, Jefferson county, $853 , 000. URBAN SYSTEM COMMUNITIES UNDER 200,000 POPULATION (Pool monies used at the discretion of the community) (78% Federal, 22% State or Local ) ($3 , 143 ,000) Brighton, Pool, Adams county, $76,000. Evergreen, Pool , Jefferson county, $38, 000. Pueblo Council of Governments, Pool, Pueblo county, $654 ,000. Highway News Page 19 Department of Highways 1985-86 Budget Canon City, Pool, Fremont county, $100,000. La Junta, Pool, Otero county, $56,000. Lamar, Pool, Prowers county, $46,000. Trinidad, Pool, Las Animas county, $58,000. Pikes Peak Council of Governments, Pool, El Paso county, $52, 000. Grand Junction, Pool, Mesa county, $338, 000. Montrose, Pool, Montrose county, $52,000. Craig, Pool, Moffat county, $49, 000. Gunnison, Pool, Gunnison county, $35,000. Steamboat Springs, Pool, Routt county,$30,000. Fort Collins, Pool, Latimer county, $468 ,000. Fort Morgan, Pool, Morgan county,$52,000. Longmont, Pool, Boulder county, $256, 000. Sterling, Pool, Logan county, $68,000. Lafayette, Pool, Boulder county. $54,000. Gunbarrel, Pool, Boulder county, $31,000. Various Streets in Greeley, resurfacing, preliminary en- gineering and construction, Weld county, $61,000. Greeley - Master Signal System, modernize traffic signals, preliminary engineering and construction, Weld county, $96,000. Various Intersections in Greeley, signals, preliminary en- gineering and construction, Weld county, $86, 000. 37th Street at Burlington Avenue in Evans, pedestrian signals, preliminary engineering and construction, Weld county, $31,000. 16th Street and Union Pacific Railroad in Greeley, resur- facing, preliminary engineering and construction, Weld county, $37,000. McCaslin Blvd, and South Boulder Road in Louisville. signals, preliminary engineering and construction, Boulder county, $27,000. Highway News Page 20 Department of Highways 1985-86 Budget Taft Avenue and 8th Street, in Loveland, signals, modify intersection, preliminary engineering and construction, Larimer county, $36,000. Boise Avenue and Eisenhower Blvd, in Loveland, signals, modify intersection, preliminary engineering and construction, Larimer county, $45,000. 29th Street and Colorado Avenue in Loveland, signals, pre- liminary engineering and construction, Larimer county, $60,000. Alamosa, Pool, Alamosa county, $41,000. Cortez, Pool , Montezuma county, $42,000. Durango, Pool, La Plata county, $68,000. BRIDGE REPLACEMENTS (80% Federal, 20% State or Local) ($26, 771,000) S.H. 71 bridge south of Punkin Center , 7 . 1 miles south of S.H. 94, bridge replacement and preliminary engineering, Lincoln county, $83,000. S .H 12 bridge, 1. 1 miles east of Weston (Purgatoire River) , bridge replacement, preliminary engineering, right of way, utilities and construction, Las Animas county, $695,000. S.H. 96 bridge, 10. 6 miles east of Eads (Rush Creek) , bridge replacement, preliminary engineering, right of way and utilities, Kiowa county, $112,000. U. S . 24 bridge . 2 mile southeast of Pikes Peak Toll Road, bridge rehabilitation, preliminary engineering, right of way, utili- ties and construction, El Paso county, $235 ,000. Bridge on S.H. 266 east of Rocky Ford, 4 . 9 miles east of U.S. 50 ( Ft . Lyon Storage Canal) , bridge replacement, preliminary engineering, right of way and utilities, Otero county, $234 ,000. U.S. 50 bridge 4 . 4 miles east of Cotopaxi (Sandy Creek) , bridge replacement, preliminary engineering, right of way and utili- ties, Fremont county, $107,000. Highway News Page 21 Department of Highways 1965-86 Budget On U. S. 50 at the western edge of Las Animas (Atchison Topeka and Santa Fe Railroad) , bridge replacement, preliminary en- gineering, right of way, utilities and construction, Bent county, $882,000. On U.S. 50 about seven miles west of Granada, bridge re- placement, preliminary engineering, right of way and utilities, Prowers county, $92,000. On U.S. 50 about . 2 mile north of Lamar (Arkansas River) , bridge replacement, preliminary engineering, right of way and utili- ties, Prowers county, $467,000. On U.S. 50 east of Holly, bridge replacement, preliminary engineering, right of way and utilities, Prowers county, $60,000. On U.S. 160 a mile west of Walsenburg (Denver & Rio Grande Western Railway) , bridge replacement, preliminary engineering, right of way and utilities, Huerfano county, $232,000. U. S. 287 about 9 . 2 miles north of junction S.H. 96 (Rush Creek) , north of Eads, bridge replacement, preliminary engineering, right of way and utilities, Kiowa county, $181,000. On U. S. 6 half a mile west of Fruita, bridge replacement, preliminary engineering, right of way and utilities, Mesa county, $356,000. East of Fruita on U.S. 6, bridge replacement, preliminary engineering, right of way and utilities, Mesa county, $223,000. S.H. 13 north of Craig, 4. 5 miles north of U.S. 40, bridge replacement, preliminary engineering and construction, Moffat county, $258,000 . U.S. 40 east of Hot Sulphur Springs, bridge replacement, preliminary engineering and construction, Grand county, $2, 290,000. On U. S. 40 over Ten Mile Creek near Granby, bridge replace- ment, preliminary engineering, right of way and utilities, Grand county, $69, 000. East of Cimmaron on U.S. 50 at Blue Creek, bridge rehabili- tation, preliminary engineering and construction, Gunnison county, $617,000. Highway News Page 22 Department of Highways 1985-86 Budget South of Dinosaur on S.H. 64, about 5 .7 miles southeast of U. S . 40, bridge replacement. preliminary engineering, right of way and utilities, Rio Blanco county. $44,000. On S .H. 125 sixteen miles north of Walden, bridge replace- ment, preliminary engineering and construction, Jackson county, $1, 138 , 000. S.H. 14 east of Rustic, bridge replacement, preliminary engineering, right of way and utilities, Larimer county, $113 ,000. Near Gill on S.H. 37, south of S .H. 392, bridge replace- ment, preliminary engineering, right of way, utilities and construc- tion, Weld county, $194,000. On S.H. 60 near Milliken 3 . 9 miles east of S .H. 257, bridge replacement, preliminary engineering, right of way and utilities, Weld county, $31, 000. On S .H. 263 in Greeley, 8th Street at Poudre River , bridge replacement, preliminary engineering, right of way, utilities and construction, Weld county, $1,027,000. On the Denver-Boulder Turnpike (U.S. 36) 0.7 mile east of Foothills Parkway, S .H. 157, bridge rehabilitation, preliminary en- gineering, right of way, utilities and construction, Boulder county, $623 ,000. Denver-Boulder Turnpike (U.S. 36) over Baseline Road, bridge rehabilitation, preliminary engineering, right of way and utilities, Boulder county, $42 , 000. U.S. 385 north of Idalia, bridge replacement, preliminary engineering, right of way, utilities and construction, Yuma county, $2, 841, 000. U.S. 160 at Pagosa Springs, over the west fork of the San Juan River , bridge replacement, preliminary engineering and con- struction, Archuleta county, $999,000. U.S. 550 Dexter Creek Bridge north of Ouray, bridge re- placement and preliminary engineering, Ouray county, $21, 000. Highway News Page 23 Department of Highways 1985-86 Budget Colorado Blvd. at Vasquez Blvd. in Commerce City, on S.H. 2 at the junction of U.S. 6, bridge replacement, preliminary engineer- ing and construction, Adams county, $866,000. S.H. 72 north of Arvada, Diversion Canal, bridge replace- ment, preliminary engineering and construction, Jefferson county, $368,000. 70th Avenue (S .H. 224) north of Denver over the Union Pacific Railroad, bridge rehabilitation, preliminary engineering, utilities and construction, Adams county, $660,000. Denver-Boulder Turnpike (U.S. 36) over Broadway, bridge re- habilitation, preliminary engineering and construction, Adams county, $865,000. Off-System Pool - Bridges, bridge replacement and construc- tion, various counties, $9, 140,000. State Highway System Bridge Inspections, bridge inspection and preliminary engineering, various counties, $606, 000. ELIMINATION OF HAZARDS (90% Federal, 10% State) ($3, 131,000) Statewide, Pool, various counties, $3, 131,000. RAIL HIGHWAY PROTECTION DEVICES (90% Federal, 10% State) ( $1,446, 518) Statewide, rail-highway protection devices - Pool, various counties, $1, 201, 518 . Near 13th Avenue and Sheridan Blvd. in Denver, protection devices, preliminary engineering and construction, Denver county, $25,000. Near Tower Road and Smith Road in Aurora, protection de- vices, preliminary engineering, utilities and construction, Adams county, $220,000. Highway News Page 24 Department of Highways 1985-86 Budget RAIL HIGHWAY ELIMINATION OF HAZARDS (90% Federal, 10% State) ($1, 446, 518) In Julesburg, new U.S. 385 railroad separation, preliminary engineering, right of way, utilities and construction, 0. 3 mile, Sedgwick county, $1, 446, 518 . HIGHWAY PLANNING AND RESEARCH FUNDING (87% Federal, 13% State) ($3, 877, 676) Statewide Highway Planning and Research, various counties, $3, 877, 676 . METROPOLITAN PLANNING (87% Federal, 13% State) ($859, 390) Statewide Pool, various counties, $859, 390. STATE PROJECTS (100% State) ($9, 921,000) U.S. 24 near Bethune, from ten miles east of S.H. 57 - east, resurfacing, 4 . 2 miles, Kit Carson county, $358,000. S.H. 94 near Aroya, west of the U.S. 40 junction, resur- facing, 5. 2 miles, Cheyenne and Lincoln counties , $450,000. U. S . 6 on Loveland Pass - east, resurfacing, 4 . 2 miles, Clear Creek county, $260,000. U. S. 50 west of the Army Ordnance Depot, resurfacing, five miles, Pueblo county, $970,000. U.S. 24 in Colorado Springs, Union Blvd, to Chelton Road, plant mix seal & rotomill , two miles, El Paso county, $356, 000. Academy Blvd . in Colorado Springs, from Maizeland Road to Templeton Gap, resurfacing, 1.7 miles, El Paso county. $310,000. . . ._. ._ Highway News Page 25 Department of Highways 1985-86 Budget U.S. 50 in Lamar, from Auwaerter Street north to the Arkansas River, rotomill and resurfacing, one mile, Prowers county, $224,000. S.H. 96 east of Westcliffe, resurfacing, five miles, Custer county, $330,000. S.H. 65 from Mesa to the Powderhorn Ski Area, resurfacing and drainage improvement, 5. 6 miles, Mesa county, $450,000. S.H. 90 west of Montrose, from Chipeta Drive west to the west edge of town, minor widening and overlay, half a mile, Montrose county, $405,000. S.H. 325 north of Rifle from S.H. 13 to the Rifle Fish Hatchery, resurfacing, 11. 3 miles, Garfield county, $650,000. U.S. 50 near Blue Creek between Cimarron and Sapinero, slide drainage correction, roadway repair, snow fencing, 0. 2 mile, Gunnison county, $200,000. S.H. 92 on Black Mesa above the Black Canyon of the Gunnison National Monument (ten locations) , slide repair, 20. 5 miles, Gunnison county, $400,000. S.H. 257 north of Windsor, resurfacing, 5 . 8 miles, Weld county, $428,000. S.H. 1 from Ft. Collins to Wellington, resurfacing, 9 . 3 miles, Larimer county, $700,000. Foothills Parkway (S.H. 157) in Boulder north of the Denver-Boulder Turnpike, signing, Boulder county, $50,000. U.S. 6 east of Holyoke to the Nebraska state line, resur- facing, 12 . 6 miles, Phillips county, $1,000,000. Durango, Dove Creek, Cortez, Pagosa Springs, communications system update, various counties, $209,000. Alamosa, Buena Vista, South Fork, Ft. Garland, communica- tions system update, various counties, $159,000. S.H. 17 south of Hooper, resurfacing, six miles, Alamosa, $400,000. Highway News Page 26 Department of Highways 1985-86 Budget U.S. 84 south of Pagosa Springs, resurfacing, Archuleta county, $867,000. U.S. 160 from Cat Creek Road to Martinez Creek, no distance recorded, resurfacing, Archuleta county, $300,000. University Blvd. south of Denver, C-470 to Belleview, re- surfacing, 4 . 1 miles, Arapahoe county, $445,000. MISCELLANEOUS REIMBURSABLE PROJECTS ($2, 191,000) I 225 north of East Jewell Avenue in Aurora, drainage im- provement, Arapahoe county, $70,000. Denver-Boulder Turnpike (U.S . 36) , Burlington Northern Railroad crossing near West 108th Avenue, bridge replacement, detour and detour removal, Jefferson county, $2,000,000. (For bridges wrecked August 2, 1985) . Front Range Airport - Adams County, review appraisal serv- ices , Adams county, working with the Colorado Department of Highways Right of Way Branch, $1, 000. Tower Road ( S.H. 32) at Smith Road in Aurora, minor widen- ing, 0. 1 mile, Adams county, $120,000. Hello