Loading...
HomeMy WebLinkAbout871543.tiff RESOLUTION RE : APPROVE CHANGE ORDER FOR RBD, INC. WHEREAS , the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, Weld County entered into a contract for certain engineering services with RBD, Inc. concerning Bridge No. 58/47B, and WHEREAS, additional engineering services are necessary at said Bridge and the Board has been presented with a Change Order for said services, with the revised total contract amount not to exceed $41 ,020 .00 , and WHEREAS, after review, the Board deems it advisable to approve said Change Order for RBD, Inc. , a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Change Order, with the revised total contract amount not to exceed $41 ,020 .00 , for RBD, Inc. be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 14th day of December, A.D. , 1987 . BOARD OF COUNTY COMMISSIONERS ATTEST: 4Ark p� �� WELD COU Y LORADO Weld County erk and Recorder and Clerk to the Board G airman BY: NOhat lL/ Clerk U C.W irby, Pro- em Deputy County APPROVED AS TO FORM: ene R. Brant er \-, eCe-;7 ac uel ��e Joh o�! County Attorney Frank amaguchi E"•,•� -nI) 871543 WELD COUNTY BRIDGE 58/478 JOB NO. 114-004 ADDITIONAL ENGINEERING SERVICES RELATED TO SECOND STRUCTURE AT IRRIGATION DITCH 1. Additional Surveying - (8 hrs x $65.00) = $ 520.00 (Topo. for Crossing Area) 2. CADD Plot - (4 hrs x $50.00) = $ 200.00 3. Coordination with Ditch Co.-(8 hrs x $50.000 = $ 400.00 Re: Requirements for flume redesign 4. Coordination with landowner -(4 hrs x $50.00)= $ 200.00 RE: Irrigation Laterals and Suspended Crossing 5. Coordination w/Utility Co.-(4 hrs x $50.00) = $ 200.00 RE: Pole and Guy Wire Relocations 6. Conceptual Design and - (8 hrs x $55.00) = $ 440.00 Hydraulics 7. Final Structural and - (16 hrs x $55.00) = $ 880.00 8. Final Design Drafting - (24 hrs x $30.00) _ $ 720.00 9. Clerical - (4 hrs x $15.00) = $ 60.00 10. Expenses = $ 100.00 ESTIMATED TOTAL = $ 3,720.00 Hourly, Not-to-Exceed = $ 4,000.00 Revised Total Contract Amount (Not-to-Exceed) = $41,020.00 • 8'71543 MEMORAnDUM 1111€. To ___ Clerk to the Board __ Date_ December 9, 1987 COLORADO Front Drew L. Scheltinga, County Engineer 1V-W1/ subject Change Order to RBD for Bridge 58/47B_ Please place on the Commissioners' agenda "Consider Change Order to RBD Inc. , Consulting Engineers, for design contract for Bridge 58/47B". The Commissioners have approved a Review/Work Session Request. The attached Exhibit B should be all that is necessary for the Commissioners packet. DLS/bf Enc. xc: Bette Rhoden, Director of Purchasing 871543 Hello