Loading...
HomeMy WebLinkAbout891294.tiff RESOLUTION RE: APPROVE AMENDMENT TO CONTRACT WITH CREATIVE STRUCTURES, INC. , CONCERNING BRIDGE 29/62B WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, on June 20 , 1988 , the Board did, by Resolution, approve a Contract with Creative Structures, Inc. , concerning Bridge 29/62B over the Cache La Poudre River, and WHEREAS, the Engineering Department has recommended changes to said Contract, in the additional amount of $262 .41 , as stated on the copies being attached hereto and incorporated herein by reference, and WHEREAS, after study and review, the Board deems it advisable to approve said Amendment to the Contract. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Amendment to the Contract with Creative Structures, Inc. , concerning Bridge 29/62B, be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 11th day of December, A.D. , 1989 . /1 "i BOARD OF COUNTY COMMISSIONERS ATTEST: " fi WELD COUNTY, COLORADO Weld County lerk and Recorder and Clerk to the Board C.W irby, hairman n DIMS')�dywyw � L ,lj e R. rantner, Pro-Tem eputy County lerk � APPROVED /c-.:a/y/7 AS TO FORM: onstance L. Har►ert EXCUSED George K nney ounty Attorney Gor / t r Li` 891294 r � "0/O limn- C✓% SUPPLEMENTAL CONTRACT By mutual agreement, Weld County and Creative Structures, Inc. hereby amend the contract between these two entities dated June 27, 1988, for engineering services necessary to replace the bridge on County Road 29 over the Cache La Poudre River, between County Road 62 and County Road 64. 1. In Article IV, Section I, Paragraph A, change the "lump sum" amount from $24,312.00 to $24,574.41. • 2. In Article IV, Section I, Paragraph C, change the "Total cost not to be exceeded without a supplemental contract" amount from $25,392.00 to $25,654.41. BOARD OF COMMISSIONERS OF WELD COUNTY,L COLORADO By: `+A' / 42417Y Chairman Date Attest: County erk and Recorder and Clerk to th oard cY k nt_, ( ) l 1cns,' Dep ty County Clerk CR TRUCTUR , NC. By: G' ID JAw 9a Robert A. Tallarico Date President COLORADO DEPARTMENT OF HIGHWAYS Approved By: Title: Date: :fsc. 1 x:391294 coo (i,Q CONSULTING ENGINEERS , 583'• THE RANCH OFFICE COMMONS•2006 WEST 120TH AVENUE,SNITEB•DENVER,COLORADO 80234•(303)16&2995 °ab116�`4 . ..„7,,, ,,, 4 OCT 9 8 1989 ROBERTA.TALLARICO,P.E.,PRESIDENT Wig.Lq,5y ta:Oar •.. October 23, 1989 Board of County Commissioners Weld County P.O. Box 758 Greeley, CO 80632 Re: Contract Dated June 27, 1988, Weld County Bridge 29/62B over the Cache La Poudre River. Gentlemen: The enclosed statement and detail of work is being submitted to you for additional compensation. It represents work performed subsequent to the Final Office Review by the Department of Highways, your staff and completion of final revisions by our firm. The major portions of the work resulted from right—of—way negotiations with the owners adjacent to the project and format changes from the Department of Highways. If you have any questions, or if I can be of further assistance, please 7 call me. 8• Y, Robert A. Tallarico, P.E. RT/jlr Enclosure 891294 dR 11t • L CONSULTING ENGINEERS 0 o C u r •ffi• THE RANCH OFFICE COMMONS•2006 WEST 720TH AVENUE,SUITE B•DENVER,COLORADO 80191`(30.71 4 89-2 9 9 5 °vuu Weld County Engineering Attn: Rex Cantrell P.O. Box 750 Greeley, CO 80632 Statement for professional services Date Description Charge - - Credit _ Balance Due 240ct89 Job #1188 — BRO-0003(7) Bridge #29/62B - - over the Cache La Poudre River - Prime Consultant - Coordination of Revisions 65.79 Civil Consutlant Revisions after Final Acceptance Project Engineer 93.65 _ Draftsman _ - 64.33- Civil October 157:98 Direct Non—Labor Charges Reproductions — Civil 38.64 240ct89 NET BILLING DUE 262.41 891294 - THANK YOU - REVISIONS AFTER FINAL ACCEPTANCE BRO-0003(7) SHEET NO. ENGINEER DRAFTSMAN DESCRIPTION OF REVISION PRIME CONSULTANT 1.5 Coordination of Revisions CIVIL CONSULTANT 1 .5 Changed CDOH Format Added Standards 2 — — Deleted one 3 — — Revise Notes 4 — .5 Add Landscape Items 5 - .5 Revised CDOH Format - Add F/A Note 6 - 7 .5 Revise Earthwork - Road App. Delete Delineators 8 1.5 2.0 Revise R.O.W. , Add special Design of Road Approach. Remove telephone conduit 9,10,11,12,22 — — Minor Notes/Revisions Meeting 1.0 Meet with Division Staff & Co. TOTALS 4.0 4.0 891294 Hello