Loading...
HomeMy WebLinkAbout851156 ° °'°REcu UNITED STATES W+ "< NUCLEAR REGULATORY COMMISSION m { 1 J REGION IV 3 lawr 611 RYAN PLAZA DRIVE. SUITE 1000 •° e° ARLINGTON.TEXAS 78011 MAY 15 1985 C67flT► CC`I regrn� In Reply Refer To: Jr[-7;74-' Docket: 50-267 a ' MAY 1 71985 R. F. Walker, President Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 Dear Mr. Walker: This is to confirm arrangements made with your staff during our telephone conversation for a management meeting at the Fort St. Vrain site on May 29, 1985. We have requested this meeting in order that we may discuss with PSC the Systematic Assessment of Licensee Performance (5ALP) report for the October 1, 1983, through February 29, 1985, evaluation period. Should you have any questions concerning these arrangements, we will be pleased to discuss them. Sincerely, 457-AtetaSi Robert D. Martin Regional Administrator Enclosures: 1. Notice of Significant Meeting 2. Proposed Agenda cc: See next page 851156 cc w/attachments: Public Service Company of Colorado ATTN: 0. R. Lee, Vice President Electric Production P. 0. Box 840 Denver, Colorado 80201 J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 193 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address) Mr. David Alberstein, 14/159A GA Technologies, Inc. P. 0. Box 85608 San Diego, California 92138 Kelley, Stansfield & O'Donnell Public Service Company Building 550 15th Street, Room 900 Denver, Colorado 80202 Chairman, Board of County Comm. of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1860 Lincoln Street Denver, Colorado 80203 Mr. H. L. Brey, Manager, Nuclear Licensing/Fuels Division Public Service Company of Colorado P. 0. Box 840 Denver, Colorado 80201 Colorado Radiation Control Program Director MAY 15 1985 Enclosure 1 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Public Service Company of Colorado Name of Facility: Fort St. Vrain Nuclear Generating Station Docket: 50-267 Date and Time of Meeting: May 29, 1985 - 1 :00 p.m. Location of Meeting: Fort St. Vrain Visitors Center Purpose of Meeting: NRC has requested this meeting to discuss the Systematic Assessment of Licensee Performance (SALP) report that was issued to PSC on May 7, 1985, as Inspection Report 50-267/85-08. NRC Attendees: Robert D. Martin, Regional Administrator J. M. Taylor, Director, IE H. L. Thompson, Director, DL/NRR R. P. Denise, Director, DRSP E. H. Johnson, Chief, RPB1 G. L. Plumlee, Resident Inspector Licensee Attendees: R. F. Walker, President 0. R. Lee, Vice President, Electric Production H. L. Brey, Manager, Nuclear Licensing/Fuels Division D. W. Warembourg, Manager, Nuclear Engineering Division J. W. Gahm, Manager, Nuclear Production Division L. Singleton, Manager, QA Division Note: Attendance by NRC personnel at the NRC/licensee meeting should be made known by 4:00 p.m. , on May 29, 1985, via telephone call to Dale A. Powers, FTS: 728-8195. Distribution: See next page MAY 15 1985 Distribution: V. Stello, DEDROGR J. M. Taylor, Director, Office of Inspection & Enforcement B. K. Grimes, Director, Quality Assurance, Vendor & Technical Training Programs, IE E. L. Jordan, Director, Division of Emergency Preparedness & Engineering Response, IE J. A. Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director & Chief Counsel , Regional Operations Enforcement, ELD NRC Attendees MAY 1 5 1885 Enclosure 2 PROPOSED AGENDA Public Service Company of Colorado Meeting with NRC Wednesday, May 29, 1985, 1:00 p.m. I. INTRODUCTION AND PRUPOSE OF MEETING Robert D. Martin II. OPENING COMMENTS R. F. Walker III. DISCUSSION NRC Staff IV. LICENSEE COMMENTS R. F. Walker V. CLOSING COMMENTS Robert D. Martin Hello