HomeMy WebLinkAbout851156 ° °'°REcu UNITED STATES
W+ "< NUCLEAR REGULATORY COMMISSION
m { 1 J REGION IV
3 lawr 611 RYAN PLAZA DRIVE. SUITE 1000
•° e° ARLINGTON.TEXAS 78011
MAY 15 1985 C67flT► CC`I regrn�
In Reply Refer To: Jr[-7;74-'
Docket: 50-267 a
'
MAY 1 71985
R. F. Walker, President
Public Service Company of Colorado
P. O. Box 840
Denver, Colorado 80201
Dear Mr. Walker:
This is to confirm arrangements made with your staff during our telephone
conversation for a management meeting at the Fort St. Vrain site on May 29,
1985.
We have requested this meeting in order that we may discuss with PSC the
Systematic Assessment of Licensee Performance (5ALP) report for the October 1,
1983, through February 29, 1985, evaluation period.
Should you have any questions concerning these arrangements, we will be
pleased to discuss them.
Sincerely,
457-AtetaSi
Robert D. Martin
Regional Administrator
Enclosures:
1. Notice of Significant Meeting
2. Proposed Agenda
cc:
See next page
851156
cc w/attachments:
Public Service Company of Colorado
ATTN: 0. R. Lee, Vice President
Electric Production
P. 0. Box 840
Denver, Colorado 80201
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 193
Platteville, Colorado 80651
L. Singleton, Manager, Quality
Assurance Division
(same address)
Mr. David Alberstein, 14/159A
GA Technologies, Inc.
P. 0. Box 85608
San Diego, California 92138
Kelley, Stansfield & O'Donnell
Public Service Company Building
550 15th Street, Room 900
Denver, Colorado 80202
Chairman, Board of County Comm.
of Weld County, Colorado
Greeley, Colorado 80631
Regional Representative
Radiation Programs
Environmental Protection Agency
1860 Lincoln Street
Denver, Colorado 80203
Mr. H. L. Brey, Manager,
Nuclear Licensing/Fuels Division
Public Service Company of Colorado
P. 0. Box 840
Denver, Colorado 80201
Colorado Radiation Control
Program Director
MAY 15 1985
Enclosure 1
NOTICE OF SIGNIFICANT LICENSEE MEETING
Name of Licensee: Public Service Company of Colorado
Name of Facility: Fort St. Vrain Nuclear Generating Station
Docket: 50-267
Date and Time
of Meeting: May 29, 1985 - 1 :00 p.m.
Location of Meeting: Fort St. Vrain Visitors Center
Purpose of Meeting: NRC has requested this meeting to discuss the Systematic
Assessment of Licensee Performance (SALP) report that
was issued to PSC on May 7, 1985, as Inspection
Report 50-267/85-08.
NRC Attendees: Robert D. Martin, Regional Administrator
J. M. Taylor, Director, IE
H. L. Thompson, Director, DL/NRR
R. P. Denise, Director, DRSP
E. H. Johnson, Chief, RPB1
G. L. Plumlee, Resident Inspector
Licensee Attendees: R. F. Walker, President
0. R. Lee, Vice President, Electric Production
H. L. Brey, Manager, Nuclear Licensing/Fuels Division
D. W. Warembourg, Manager, Nuclear Engineering Division
J. W. Gahm, Manager, Nuclear Production Division
L. Singleton, Manager, QA Division
Note: Attendance by NRC personnel at the NRC/licensee meeting should be made
known by 4:00 p.m. , on May 29, 1985, via telephone call to Dale A. Powers,
FTS: 728-8195.
Distribution:
See next page
MAY 15 1985
Distribution:
V. Stello, DEDROGR
J. M. Taylor, Director, Office of Inspection & Enforcement
B. K. Grimes, Director, Quality Assurance,
Vendor & Technical Training Programs, IE
E. L. Jordan, Director, Division of Emergency Preparedness &
Engineering Response, IE
J. A. Axelrad, Director, Enforcement Staff, IE
J. Lieberman, Director & Chief Counsel , Regional Operations Enforcement, ELD
NRC Attendees
MAY 1 5 1885
Enclosure 2
PROPOSED AGENDA
Public Service Company of Colorado Meeting with NRC
Wednesday, May 29, 1985, 1:00 p.m.
I. INTRODUCTION AND PRUPOSE OF MEETING Robert D. Martin
II. OPENING COMMENTS R. F. Walker
III. DISCUSSION NRC Staff
IV. LICENSEE COMMENTS R. F. Walker
V. CLOSING COMMENTS Robert D. Martin
Hello