HomeMy WebLinkAbout880962 CONTRACT CHANGE ORDER
CHANGE ORDER: NO. 1, Schedule I DATE: 9-12-88
Street Improvements
PROJECT: Weld County Business Park PROJECT NO. 8733F
OWNER: Weld County CONTRACTOR: Hall-Irwin Const. Co.
To the Contractor: You are directed to make the following changes or
modifications to the work. All other terms and conditions of the contract
expressly modified herein shall remain in full force and effect:
CHANGE:
1. A. ADD- trash rack shown by detail on Plan Sheet 23 .
B. CHANGE- striping width from 5" to 4" and ADD- 6 turn
arrows and 6 each, word "Only" .
C. ADD- 8 rectangular traffic signs shown on Sheet 32
of the plans.
2. ADD- 4258 sy 8" base furnished by Owner and placed by
Contractor.
3 . ADD- 2 foot shoulder along acceleration and decelera-
tion lanes on "O" Street.
CHANGE IN CONTRACT PRICE:
1. A. Add-trash rack 1 ea @ 380. 00 380. 00
B. Change striping width
& add 6 turn arrows'
and 6 word "Only" 0.00
C. Add rectangular traffic
sign 8 ea @ 150. 00 1200.00
1580. 00
2. Add 8" base furnished by
Owner 4258 sy @ 0. 88 3747. 04
3. Add 2 ' shoulder on lane on
"O" Street
Add 3" AC Pavement 237 sy @ 3 . 76 891. 12
Add 12" base furnished by
Owner 237 sy @ 1. 30 308. 10
Add common excavation 99 cy @ 5. 60 554. 40
1753 . 62
NET CHANGE IN CONTRACT COST: $ 7,080. 6§
I ��^ 860962
JUSTIFICATION:
1. Ciy of Greeley required change for plan approval.
2. Correct deductive Alternate No. 1 quantity to equal
quantity shown in Schedule I base bid.
3 . City of Greeley required change for plan approval.
Original Contract Amount $ 510,531.80
Net change by previous change orders $ 0.00
New contract amount including this change order . . . $ 517,612.46
Contract time will be ( inoroaccd) (dcorcaacd)
by zero (0) days.
Completion as of the date of this change order
therefore is January 30, 1989.
CONTRA OR: NORTON UNDERWOO D , INC.
By; �' i./' �f�� _ V4//Ylit'(' By
Date: 74; AX Date:
OWNER APPROVAL BY: JAW( an DATE:
ATTEST: `Iyy72i1r ���
WELD COUNTY U EPK 4.ND PSCORDER
AND CU Pi< TO THE [CARD
BY:.A.: a77?,i}z,.-e_ u L.c
DDputy Cc :nty Clerk
'4.
880332
CONTRACT CHANGE ORDER
CHANGE ORDER: NO. 1, Schedule II DATE: 9-12-88
Sewer Lines
PROJECT: Weld County Business Park PROJECT NO. 8733F
OWNER: Weld County CONTRACTOR: Hall-Irwin Const. Co.
To the Contractor: You are directed to make the following changes or
modifications to the work. All other terms and conditions of the contract
not expressly modified herein shall remain in full force and effect.
CHANGE:
1. ADD- 1200 cy of County select material and dispose
of 1200 cy of unstable material.
CHANGE IN CONTRACT PRICE:
1. Add County Pit Run 1200 cy @ 1.16 1392. 00
Dispose of unstable
material 1200 cy @ 1.16 1392.00
2784. 00
NET CHANGE IN CONTRACT COST: $ 2,784. 00
JUSTIFICATION:
Request by City to prevent waiting for material
to dry.
Original Contract Amount $ 284, 534. 94
Net change by previous change orders $ 0. 00
New contract amount including this change order $ 287, 318. 94
Contract time will be (increased) (decreaced)
by zero ( 0) days.
Completion as of the date of this change order
therefore, is January 30, 1989.
CONTRAC R: // NORTON, DERWOOD , INC.
,,*#
Date: 7/�%/- Date: q -is
ER PP OVAL BY: a //Jj4/fAftelke.---1DATE:
WELD C i fl' C'_ERK AND RECORDER
AP CLIRK TO Tf1E BOARD 880962
4
BY' / yij,._n.c�.r __( L. ,--2( c‘..
Decqty County Cerk
CONTRACT CHANGE ORDER
CHANGE ORDER: NO. 1, Schedule III DATE: 9-12-88
Water Lines
PROJECT: Weld County Business Park PROJECT NO. 8733F
OWNER: Weld County CONTRACTOR: Hall-Irwin Const. Co.
To the Contractor: You are directed to make the following changes or
modifications to the work. All other terms and conditions of the
contract not expressly modified herein shall remain in full force and
effect.
CHANGE:
1. A. ADD- 6" fire service with valve to five ( 5) feet behind
property line and plug.
B. ADD- 8 - 2" water services.
C. DELETE- 10 - 1" water services.
D. ADD- 1 - 3" ductile iron water service with valve at main and
property line.
2. ADD- 430 lf of 8" DIP with 8" valve and fire hydrant along west
property line of motor pool site.
3 . ADD- 2 - 16" gate valves.
4. ADD- 3 fire hydrants on 11th Avenue off of 16" line.
CHANGE IN CONTRACT PRICE:
1. A. Add 6" fire service for
motor pool building 1 ls 1510. 00
B. Add 2" water service 8 ea @ 987. 65 7901. 20
C. Delete 1" water service 10 ea @ 344. 68 ( 3446 .80)
D. Add 3" D.I . water service
and valves 1 ea @ 1738. 00 1738.00
7702.40
2. Add fire hydrant at south-
west corner of motor pool site
Add 8" DIP 430 lf @ 13 . 16 5658. 80
Add 8" gate valve 1 ea @ 484. 00 484. 00
Add hydrant at end of 8" line 1 ls 1558 .00
7700. 80
3 . Add 16" gate valve 2 ea @ 2440. 00 4880.00
4. Add hydrants 3 ea @ 1912. 34 5737 .02
Thrust protection, shipping
& handling 1162. 98
6900.00
NET CHANGE IN CONTRACT COST: $ 27, 183 . 20
JUSTIFICATION:
1. A. Request by Owner for sprinkler system in motor
pool building.
3. ,C. , D. 3" service for motor pool building, also
change 1" services to 2" services to allow for more flexi-
bility in future building.
2 . Request by Owner, fire protection for fuel storage
area.
3 . Change proposal quantity to plan quantity.
-4. City of Greeley request to be paid for out of City
dire hydrant fund.
Original contract amount $469,391. 64
Net change by previous change orders $ 0. 00
New contract amount including this change order $496,574. 84
Contract time will be ( incroasod) (dcorcaccd)
by zero ( 0) days.
Completion as of the date of this change order
therefore is: January 30, 1989
CONTRACTOR: NORTON UNDERWOOD L , INC.
BY: ` �L� % 'v By:
Date: 717, Date: 9
OWNER APPROVAL BY: afff #Yede/lat DATE:
ATTEST: ,
WELD COON i� ��-FRK AND RECORDER
AND CI E ZK TO THE BOARD
z“ii "-./
Deputy C.cunty Clerk •