Loading...
HomeMy WebLinkAbout890552.tiff CHANGE OWNER ❑ ARCHITECT ORDER CONTRACTOR FIELD 0 MA DOCUMENT G701 OTHER PROJECT: WELD COUNTY, COLORADO CHANGE ORDER NUMBER: THREE MOTOR POOL SERVICE CENTER BUILDING (name, address) _ WELD COUNTY BUSINESS PARK TO (Contractor) GREELEY, COLORADO Jerald Construction Co. , Inc. 7 ARCHITECT'S PROJECT NO: 8803 P.O. Box 1962 CONTRACT FOR: MOTOR POOL Fort Collins , Colorado 80522 SERVICE CENTER BUILDING GREELEY, COLORDO L J CONTRACT DATE:September 1 , 1989 You are directed to make the following changes in this Contract: 1 . Electrical changes as per Contractor's letter dated June 21 , 1989. ADD: $5,052.00 2. Landscaping credi;tas per Contractor's letter dated May 1 , 1989. 'DEDUCT: $ 346.00 The original Contract Sum was $ 1 ,511 ,000.00 Net change by previous Change Orders $ 20,748.00 The Contract Sum prior to this Change Order was $ 1 ,531 ,748.00 The Contract Sum will be (increased) (dec ease4) (.0 ehangeel) by this Change Order . . $ 4,706.00 The new Contract Sum including this Change Order will be $ 1 ,536,454.00 The Contract Time will be (increased4 (docceased) (unchanged) by ( -0- ) Days. The Date of Completion as of the date of this Change Order therefore is February 1 , 1989 . LARRY E. STEEL ASSOCIATES JERALD CONSTRUCTIONS. , INC. WELD COUNTY, COLORADO ARCHITECT CONTRACTOR OWNER Greeley National Plaza. Suite P.O. Box 1962 P.O. Box 758 Address 640 Address Address Greeley, Colorado Q 80631 R A Fort Collins , Colorado 80522 Greeley, Colorado 8.0632 BYla4 E . h�/tK✓<.l AIA BY BY DATE G/ 'S/Fjg DATE DATE /Z ki AIA DOCUMENT 0701 • CHANGE ORDER • APRIL 1970 COITION • AlAS • 09 1970 • THE ( ONC PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 890552 eGOOr 4- :� " ConeRruc oon 1314 Webster 482-0414 P.O. Box 1962 Fort Collins, CO 80t-^2 June 21 , 1989 Larry E. Steel & Associates 822 7th Street, #640 Greeley, CO 80631 Re: Weld County Motor Pool Attn: Mr. Steel This letter is in request of electrical change items as discussed and agreed upon with the electrical engineer and owner on June 14, 1989. As follows: Item // 1 : Add outlet for landscape sprinkler control $ 245.00 Item // 2: Conduit to sump pump for Johnson Control 241 .00 Item // 3: Add smoke detectors 300.00 Item /1 4: Air supply blower 240.00 Item 1/ 5: Door operators 1 ,900.00 Item // 6: Three-Phase pumps 440.00 Item 1/ 7: Add relay for lighting in wash bay 206.00 Item # 8: Lights in Room 116 167.00 Item 1/ 9: New lamps 370.00 Item #10: Credit for lights Room 113 -<130.00> Item #11 : Conduit for waster oil and antifreeze tanks 414.00 Sut-total $ 4,393.00 P & 0 15% 659.00 Total Add $ 5,052.00 Sincerely, JE LD CONSTRUCTION CO. , INC. iZc(o-alci Douglas R. McCarthy Project Manager DRM/sam 89UL 32 Hello