Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
850350.tiff
CHANGE Distribution to: ORDER OWNER kl ARCHITECT n AM DOCUMENT G701 CONTRACTOR R] FIELD ❑ OTHER ❑ PROJECT: Ft. Lupton Service Center CHANGE ORDER NUMBER: 1 (name, address) 330 Park Avenue, Ft. Lupton INITIATION DATE: 9/20/85 TO (Contractor): I— —I ARCHITECT'S PROJECT NO: I Lockhart Constructors 3400 W. 16th Street, Suite 6L CONTRACT FOR: Weld County Greeley, Co 80631 L. I CONTRACT DATE: 9/16/85 You are directed to make the following changes in-this Contract: Add tapered insulation from 1/2 inch to 3 inch sloping insulation on the lower portion of the roof. With this addition the sloping crickets will remain. The insulation will come from the upper roof materials and will be repurchased. The added insulation to the lower roof will assist in drainage which will lower the water load. Provide new fleshings to suit change in roof slope in area t"Btt from level condition to 1/8" per foot slope. flashing previously fabricated for a "zero" slope condition shall remain the property of Weld County. Increase of change order #1 includes all labor and materials to do the above changes. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 46,418,00 . Net change by previously authorized Change Orders $ 0.00 . The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 46,418.00 . The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 5,550.00 . The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 51,968.00 , The Contract Time will be (increased) (decreased) (unchanged) by none ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: Everson Thgjneering, Inc. Lockhart Constructors Wold County A0CT2g CON34OO W 16th Street bL OWNER 1020 28th Avenue 440000 W. 915 10th Street. Address Address Address Greeley, Co 80631 Greeley, /Coo 806.1 Creele,y, f 80631 B �..'G �%".tom BY ,�,9() s,..2 o� `/�j /.e%iu� o DATE /Q— _3'G,5 DATE /Cr- . j - �5 TE f — 7-p MA DOCUMENT O01 • CHANGE ORDER • APRIL 1970 EDITION • AIA® • © 1977{ THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. M00G G701 -1978 • / I 0 850350 PO(11.Y 4-'1:::::..
Hello