January 6, 1986
Mr. Jim Fleetwood
The Permian Corporation
P.O. Box 1970
Casper, Wyoming 82601
Re: USR-477:81:23
Dear Mr. Fleetwood:
The staff has completed its review of your letter dated December 19, 1985,
outlining the additions to USR-477:81 :23. It was determined that material
deviations would occur from the original Use by Special Review permit.
Therefore, a Use by Special Review permit amendment will be required.
I would recommend that you call and schedule an appointment with Gloria Dunn
or myself to discuss the procedures involved with filing an amendment to
USR-477:81:23.
If you have any questions, please call or write.
Sincerely,
0,1)-1-c'e, deliax_Le...._
Debbie deBesche
Current Planner
DLD:rjg
8:w85
r
THE PERMIAN CORPORATION
P. O. BOX 1970
GASPER, WYOMING 82602
307 234-6916
DVi� \N
12-19-85
Weld County Planning Staff
,-,=C 21985
915 10th Street
Greeley, CO 80631
Weld e . OleioIL
ATTN: Debbie Besche
RE: Permian Corporation facility at Continental Pipeline's Spindle "B"
station.
Dear Ms. Besche:
The Permian Corporation is planning to construct a tanker truck unloading
and crude oil custody transfer facility at Continental Pipeline's Spindle
"B" station located in the SW4/NW4, section 20, T-2-N, R-66-W, (approxi-
mately 2 miles north of Fort Lupton on Hwy 85) . The addition will be
similar to the other existing facilities at this site, and will consist
of the following:
1) ne - 72.5' X 15' X 9" concrete pad for trucks to
park on while being unloaded.
2) , arie - 72.5' X 10' X 6" concrete pad for truck un-
loading equipment and piping to set on.
3) one 15HP truck unloading pump and associated piping.
4) one - 500 Bbl steel tank for surge capacity while
oil is being transferred to Continental Pipeline.
5) one - Automatic Custody Transfer unit consisting
of a pump, oil quality sampling and testing device,
and a meter, contained in a building 5' X 10' X 6 ' .
•
„2 ,,age -yd'
extension consisting of approximately
500 yd of asphalt paving.
7) various - associated piping.
All the above items will be located within Continental Pipeline's station
as per attached drawing "A". If more information is needed for the com-
mission to make its determination on whether or not this facility would
require additional permitting above what Continental Pipeline has already
received, please contact me at the above telephone number or address.
Sincerely,
d''--
Jim Fleetwood
4
EXHIBIT s A
i! w
4
• I.k
x x * • - -- x
_ ` NEW_ ACT
NEW 500 -BBL TANK ,� -Q \ TRUCK PROPOSED UNLOADING PAD
f -I- -- -
I
N DRIVE EXTENTION/� ( \\
i7.'...- I
I I
I o UNLOADING
I PADS
• x j I
I It
(I)-8' TO FT. LUPTON
CCI STATION
"- I
O ' TANK IN
GE
CC I
O
x N UUNLOADING'--_ - n '
A 7 I O< it -0 O!
II
E x i
- ro O C�
ic
• * cl O
k
x
• x 1 vl
I w x •
x 1
x * x
SPINDLE B STATION
PROPOSED EXPANSION
SW 1/4,N W 1/4, SEC.20,T-2-N,R-66-W
ISSUE: No.
CONTINENTAL PIPE LINE CO.
HOUSTON, TEXAS OWL ,-Johrl sot?
DATE: Io-, 5-0: