Loading...
HomeMy WebLinkAbout861485.tiff 4 DEPARTMENT OF PLANNING SERVICES 0 ?E PHONE(303)356-4000 EXT.4400 915 10th STREET 44 - GREELEY,COLORADO 80631 \ is iW ( :;S�t -t COLORADO January 6, 1986 Mr. Jim Fleetwood The Permian Corporation P.O. Box 1970 Casper, Wyoming 82601 Re: USR-477:81:23 Dear Mr. Fleetwood: The staff has completed its review of your letter dated December 19, 1985, outlining the additions to USR-477:81 :23. It was determined that material deviations would occur from the original Use by Special Review permit. Therefore, a Use by Special Review permit amendment will be required. I would recommend that you call and schedule an appointment with Gloria Dunn or myself to discuss the procedures involved with filing an amendment to USR-477:81:23. If you have any questions, please call or write. Sincerely, 0,1)-1-c'e, deliax_Le...._ Debbie deBesche Current Planner DLD:rjg 8:w85 r THE PERMIAN CORPORATION P. O. BOX 1970 GASPER, WYOMING 82602 307 234-6916 DVi� \N 12-19-85 Weld County Planning Staff ,-,=C 21985 915 10th Street Greeley, CO 80631 Weld e . OleioIL ATTN: Debbie Besche RE: Permian Corporation facility at Continental Pipeline's Spindle "B" station. Dear Ms. Besche: The Permian Corporation is planning to construct a tanker truck unloading and crude oil custody transfer facility at Continental Pipeline's Spindle "B" station located in the SW4/NW4, section 20, T-2-N, R-66-W, (approxi- mately 2 miles north of Fort Lupton on Hwy 85) . The addition will be similar to the other existing facilities at this site, and will consist of the following: 1) ne - 72.5' X 15' X 9" concrete pad for trucks to park on while being unloaded. 2) , arie - 72.5' X 10' X 6" concrete pad for truck un- loading equipment and piping to set on. 3) one 15HP truck unloading pump and associated piping. 4) one - 500 Bbl steel tank for surge capacity while oil is being transferred to Continental Pipeline. 5) one - Automatic Custody Transfer unit consisting of a pump, oil quality sampling and testing device, and a meter, contained in a building 5' X 10' X 6 ' . • „2 ,,age -yd' extension consisting of approximately 500 yd of asphalt paving. 7) various - associated piping. All the above items will be located within Continental Pipeline's station as per attached drawing "A". If more information is needed for the com- mission to make its determination on whether or not this facility would require additional permitting above what Continental Pipeline has already received, please contact me at the above telephone number or address. Sincerely, d''-- Jim Fleetwood 4 EXHIBIT s A i! w 4 • I.k x x * • - -- x _ ` NEW_ ACT NEW 500 -BBL TANK ,� -Q \ TRUCK PROPOSED UNLOADING PAD f -I- -- - I N DRIVE EXTENTION/� ( \\ i7.'...- I I I I o UNLOADING I PADS • x j I I It (I)-8' TO FT. LUPTON CCI STATION "- I O ' TANK IN GE CC I O x N UUNLOADING'--_ - n ' A 7 I O< it -0 O! II E x i - ro O C� ic • * cl O k x • x 1 vl I w x • x 1 x * x SPINDLE B STATION PROPOSED EXPANSION SW 1/4,N W 1/4, SEC.20,T-2-N,R-66-W ISSUE: No. CONTINENTAL PIPE LINE CO. HOUSTON, TEXAS OWL ,-Johrl sot? DATE: Io-, 5-0: Hello