PROJECT: WELD COUNTY, COLORADO CI IANGE ORDER NUMBER: TWO
(name, address) HUMAN RESOURCES OFFICE BUILDING
WELD COUNTY BUSINESS PARK
TO (Contractor)GREELEY, COLORADO
ARCHITECT'S PROJECT NO: 8801
Bassett & Associates , Inc.
7388 S. Revere Parkway CONTRACT FOR: HUMAN RESOURCES
Suite 806 OFFICE BUILDING
Englewood, Colorado 80112 Greeley, Colorado
L _J CONTRACT DATE: July 11 , 1988
You are directed to make the following changes in this Contract:
1 . Addition of 10" high bronze numbers reading 1551 per Contractor 's letter
dated November 10, 1988. ADD: $ 210.00
2 . Door modification to roof top unit as requested by Owner and per Contractor' s
letter dated November 25, 1988. ADD: 187.00
3. Addition of four l/4" steel orifice plates added on inlet side of concrete
pipes at drainage ponds as per Contractor' s letter dated December 1 , 1988.
ADD: 135.00
4. Door glass frame modifications for panl ,.. hardware bar in lieu of spacer kits
from hardware allowance as per Contractor' s verbal quotation dated
January 4, 1989. ADD: 280.00
The original Contract Sum was $ 772 ,000.00
Net change by previous Change Orders $ 37,579.00
The Contract Sum prior to this Change Order wis $ 809,579.00
The Contract Sum will he (increased) (41@c-ceased)- haed) by this Change Order . . $ 812.00
The new Contract Sum including this Change Order will be $ 810,391 .00
The Contract Time will be (increased) (decreased)-(unchanged) by Five ( 5 ) Days.
The Date of Completion as of the date of this Change Order therefore is January 12, 1989.
LARRY E . STEEL ASSOCIATES BASSETT & ASSOCIATES , INC . WELD COUNTY, COLORADO
rcei ECT CO.L,T' F
Feeley National Plaza, Suite 3g$T�. severe Pkwy. Suite c Nt8'.0 . Box 758
Address 640 Vd Ir - -8O-6-- Address
r.c i , Colorado 80631 Englewood, Colorado 80112 Creole , Colorado
X
Hello