Loading...
HomeMy WebLinkAbout890159.tiff CHANGE OWNER N . ARC nTrc:T LI ORDER CONTRACTOR I 1 FIELD H MA DOCUMENT 6701 OTHER PROJECT: WELD COUNTY, COLORADO CI IANGE ORDER NUMBER: TWO (name, address) HUMAN RESOURCES OFFICE BUILDING WELD COUNTY BUSINESS PARK TO (Contractor)GREELEY, COLORADO ARCHITECT'S PROJECT NO: 8801 Bassett & Associates , Inc. 7388 S. Revere Parkway CONTRACT FOR: HUMAN RESOURCES Suite 806 OFFICE BUILDING Englewood, Colorado 80112 Greeley, Colorado L _J CONTRACT DATE: July 11 , 1988 You are directed to make the following changes in this Contract: 1 . Addition of 10" high bronze numbers reading 1551 per Contractor 's letter dated November 10, 1988. ADD: $ 210.00 2 . Door modification to roof top unit as requested by Owner and per Contractor' s letter dated November 25, 1988. ADD: 187.00 3. Addition of four l/4" steel orifice plates added on inlet side of concrete pipes at drainage ponds as per Contractor' s letter dated December 1 , 1988. ADD: 135.00 4. Door glass frame modifications for panl ,.. hardware bar in lieu of spacer kits from hardware allowance as per Contractor' s verbal quotation dated January 4, 1989. ADD: 280.00 The original Contract Sum was $ 772 ,000.00 Net change by previous Change Orders $ 37,579.00 The Contract Sum prior to this Change Order wis $ 809,579.00 The Contract Sum will he (increased) (41@c-ceased)- haed) by this Change Order . . $ 812.00 The new Contract Sum including this Change Order will be $ 810,391 .00 The Contract Time will be (increased) (decreased)-(unchanged) by Five ( 5 ) Days. The Date of Completion as of the date of this Change Order therefore is January 12, 1989. LARRY E . STEEL ASSOCIATES BASSETT & ASSOCIATES , INC . WELD COUNTY, COLORADO rcei ECT CO.L,T' F Feeley National Plaza, Suite 3g$T�. severe Pkwy. Suite c Nt8'.0 . Box 758 Address 640 Vd Ir - -8O-6-- Address r.c i , Colorado 80631 Englewood, Colorado 80112 Creole , Colorado X Hello