Loading...
HomeMy WebLinkAbout881777.tiff p o � w7(0007Jil \ �` (YlE(Yl®RA(1DU1 !CT , 7 1988 Wi`P�e Brian Bingle, Planning October 17, 988 To Date r ` 1 id CO. Ahaawna emmmaeein,, Drew Scheltinga, County Engineer COLORADO From Storm Drainage Report, Samad Aghajani, USR-846. Subject: I have reviewed the storm drainage report submitted by McRae and Short, Inc. dated September 30, 1988. The report is complete and the criteria and engineering principles used in the report are in compliance with Weld County regulations. The report indicates the 100-year storm could be detained on the existing site and discharge limited to an undeveloped five-year storm runoff rate by restricting the flow through the existing 9" corrugated metal pipe. Therefore, if the pipe is metered in accordance with the report and plan submitted, Weld County storm drainage criteria will be satisfied. I am aware there is a dispute with Mr. Brantner, the property owner to the south. I can only review the engineering material submitted. I cannot determine whether it is proper or legal to discharge across Mr. Brantner's property. DLS/mw:prsa xc: Commissioner Yamaguchi Planning Referral File. - Samad Aghajani, USR-846 U1111 ?LOIN9 Hello