HomeMy WebLinkAbout871336.tiff HEARING CERTIFICATION
DOCKET NO. 87-72
RE: APPEAL DECISION OF HEALTH BOARD - RONALD & MARY ANN SCHMUNK
A public hearing was conducted on October 26, 1987, at 9:00 A.M. , with
the following present:
Commissioner Gordon E. Lacy, Chairman
Commissioner C.W. Kirby, Pro-Tem - Excused
Commissioner Gene Brantner
Commissioner Jacqueline Johnson
Commissioner Frank Yamaguchi
Also present:
Acting Clerk to the Board, Tommie Antuna
Assistant County Attorney, Bruce T. Barker
Health Department representative, Wes Potter
The following business was transacted:
I hereby certify that a public hearing was conducted on October 26,
1987, at 9:00 A.M. to consider the appeal of Ronald and Mary Ann
Schmunk concerning a decision by the Health Board. Wes Potter,
representing the Health Department, said Mr. and Mrs. Schmunk requested
a variance to connect a second mobile home to an existing septic system
which is located at 38418 Weld County Road 33, Eaton. Mr. Potter said
both of the mobile homes are three-bedroom, and the Health Protection
staff feels that the current system is not sufficient to handle both of
the mobile homes, because a 1 ,750 gallon septic tank is required for
six bedrooms. Mr. and Mrs. Schmunk stated they have a receipt showing
they paid for a 1 ,250 gallon septic tank, but the installer told them
he did not have a tank of that size, so he installed a 1 ,500 gallon
tank. Mr. Potter said the variance request was granted by the Board of
Health on September 22, 1987, subject to the following three
conditions: 1) The septic tank size be determined to be 1,500 gallons;
2) The absorption field be increased an additional 702 square feet; and
3) The repairs to the system be completed within 30 days. Bruce
Barker, Assistant County Attorney, said this appeal was different from
previous appeals because this variance request was approved by the
Board of Health, and Mr. and Mrs. Schmunk are appealing the conditions..
Ronald Schmunk, one of the applicants, came foward to answer questions
of the Board. Mr. Schmunk requested that, if the Board denies his
appeal, he be given more time to complete the work for the absorption
field. Pat Shepherd, of the Health Department, made comments
concerning the absorption field. He said the 30-day requirement of
Condition No. 3 is so that the work can be completed before winter sets
in. Commissioner Johnson moved to deny this appeal us to Conditions
No. 1 and 2; and grant the appeal as to Condition No. 3, allowing the
Schmunks until May 20, 1988, to accomplish the repairs to the system.
Commissioner Brantner seconded the motion and it carried unanimously.
//t L 'r 371336
Page 2
RE: BOARD OF HEALTH APPEAL - SCHMUNK
This Certification was approved on the 28th day of October, 1987.
APPROVED:
���//////���� BOARD OF COUNTY COMMISSIONERS
7 ATTEST: "111 ":214 ^^" .) WELD COUNTY, COLORADO
Weld County Clerk and Recorder EXCUSED DATE OF APPROVAL _
and Clerk to the Boas, Gordon E. Lacy, Chairman
EXCUSED
Dputy County Cl rk C. Kirby, Pro-Tem
Gene R. Brantner
J.cquel'=.e Joh so
Frank Y aguchi
TAPE #87-110
DOCKET #87-72