Loading...
HomeMy WebLinkAbout840256.tiff CHI _I AGE ORDER BUILDING SYSTEMS, INC. Number 1 2430 6TH AVENUE - GREELEY, CO 80631 /PHONE DATE 303353-7364 353-0540 9-19-84 JOB NAME/LOCATION TO Weld County Division of Human Resources 520 13th Avenue % Mr. Walter Speckman JOB NUMBER JOB PHONE 84-19 EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT RE: 520 13th Avenue Greeley, Colorado We hereby agree to make the change(s)specified below: Addition of 1 - 3 °7 ° Steel exterior door system with panic hardware, weatherstrip and thresholds. • 722 . 00 installed 722 . 00 Addition of 2 - 6°4° Mill finish aluminum windows, single glass 175.00 each installed 350 . 00 Relocation of 4 - 6 °4 ° existing windows 85. 00 340. 00 • Relocate existing door and install new weatherstrip, threshold and sweep.n 167 . 50 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at this price 4. $ 1 , 579 50 OATE PREVIOUS CONTRACT AMOUNT $ 55, 000 00 AJTHORIZED SIGNATURE(CONTRACTOR) _ j - REVISED CONTRACT TOTAL/ $, 56 , 579 50 ,5' ACCEPTED -The above prices and specifications of ��% this Change Order are satisfactory and are hereby ac- Date of acceptance cepted. All work to be performed under same terms and \\ conditions as specified in original contract unless other- ' Signature r., `YMs n yti wise stipulated. iO NE // /D ;1 840256 Hello