HomeMy WebLinkAbout851581.tiff July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME ?iely C /047504 ADDRESS X222 4- /6:571— ‘-reel7 Ca 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. /1/4711/ f i-shft) 6S — /hose bes/ sv;feaf to so Ei'L/l tATf - J//T/f /1/'Aft/`1 L/"1 CA14E iqvs s'w O/i ue< Cb1-in t.x c --�� n WIi/DuS of . S "1 ores /.+✓f �� e hen fg, 3. At what point in thee and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 40000 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you fFec prefer.J� CAcCtri /ink e- lb f1 ill l7Q )r J &Weee. tff Q5 a 5 up7 est(°Y' 851581 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. A N/trumt. gEwiv BELT - Am/ ,25,./"A)toe -- W flh if 6i/ c%r�n LnL fence &Jiro, -fhe Wi- — 73 file Noxr# of THr Green be// — ou1Q k o— ?erg? 0enf barrier -Tor tie f it, 4 4-he ope 'afro'\ NND pRaeb98Gy Nor wile To 6E d/s Tu R En no K AG 7h►S 1-714E- Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 ` I V July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME 1,»O i E rJ 1 ,� ADDRESS 2.320 5. Up 5T 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landsca ing (i.e. trees, shrubs) you t1 prefer. I\J,Me, vice5 A hd 5hru Wise, enou h - j shi6i vf+e pit Enel h VArtety 1-KAt it50111- CiiC.,, e>i rS CAYi Contme, �-to 'Corr 1 1 shield V f evl ;rorn [t 5c-e± 1 2ok 3. At what pofnt in/ the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 0 Prior to extracting any sand and gravel from the gravel pit. d. Other, please omment. t 5 ceded -ro ate d ' t /ri1e p , s •eV', AreP Ot " iP c.er�r�ct?rr �'u e t in' Y 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? — circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. / rl v v t0 -r% cr1 AI h h 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 . 4 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME A/LA A k E L L ER ADDRESS 167/7 � /4 s t (O r E E L-CX 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer ES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer.ira 066, 0 ;:'?er?-7:j Apir7 //,),,, i.' ,,f. v X ,,,i_ 7e... , Z. ,4317-- 4_ ni.-- -1,ter--_,_____-_-- 114-14 ( 11- LL ', /4 "6L-pLo.„ ) 3. At w at point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. ('c.' Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. ' 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? �'� circle one answer ' YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6 ' Ch-P4i -el---r-tb' 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 1 / l/� . fr- July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME /)A J Y JEAN .)O o 6/A/v Ada, L Le ADDRESS 10 / 9 E, lb`t S f.� G 1'e-/e �J 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer (YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. aQ ,,,,,i.--„La__,,z._ i„:„.,61 c,.t ,es_a_4_,tit__ 4 ( 1-i- vi-,c--4- e- {--4- 3. At what int in the sand and gravel operation should additional landscapin along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary.Q1 . Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. WC /6-- OL_ 4° ,"-p...../1,"--C.Q. /1 \f/- adbil/\- 2-12/1/ t -} 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. C.CPrior to extracting any sand and gravel from the gravel pit. d.✓ Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME ADDRESS !7v, ,/ �� 1'� ' /- = __ 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer DYES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer.a 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer_ a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. C2) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. to P004 dna i Gl link 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. II Grp "n �, �'Xl no Y'�-� �1d e� 9re & rik, e1 .1- Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME 12-'s .iy ADDRESS 1741 4 E & .i 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer (`YES) NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. -vim z 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. ' cij-.1 0.0 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. or Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 Nd - f,e) ti M i tv' t July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 y ADDRESS f a a g 1. Should additional landscaping guidelines be rdgzired of the gravel pit 4 - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. O J 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing r barrier (i.e. berm, wood fence, metal chain length) you prefer. 6 ' f ' 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 21-E,") Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. (5 7:-u _... ix. Ly.„ Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME //An' 6 ... f' 1-A7-erq ADDRESS a Sl L i' /d r 5 7-4,E- I Cf /4 I 4 )/ 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. A(i5 ,' 0G,/P ,..1-VUV/%a /c ` C L A ` Cv( ;iL /:L YC:'f-e,AI /34/F i Noi s e 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer ES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. � eiLA, G ( 4 // ' //All — � cee ,) :7--ec �Sie 66 /6/ 1 ,� �- r , 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Ra/FiA, c a,% 0 ti uti isy , 6 Sl Etc i-5, go (..: U�' J if' 3 (711 P ,z 51 _-:( 5 , 0 c 0/) , /,/ .vi./(1 ' SiP1t) / Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 ON), cc l,'st Ne-t v."P ,r�s. • July 24, 1985 . 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 • 1 c3 / y ,,e-e-A— (J � ADDRESS �. ' �C _ / O/N 41;14,2L___, C_Q (O(n,5 2— V 1. Should additional landscaping guidelines be rdgired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. (trees; shrubs) you prefer. '2' iGV CJ 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. 'c) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. / � D�o�r � e0,_, ,E;;?____),2-/-1-4--4' 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? • circle one answer OYES J NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If yourr answer was yes p ease comment on this question. aid/ 6 Indicated the type a height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any and and gravel from the gravel pit. / 'd. Other, please comment 1�_ /Z , 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. diLa 6-7‘--a-LiArd--1-17c-e"-) Thank You f r your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 o ) Sfo ( ;• July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 (-9 .J�� ADDRE S f/t ' r 1. Should additional landscaping guidelines be required of the gravel pit f - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer CYES,.-; NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. —1/444C4L c17/ 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. (..1C1) Prior to extracting any sand and gravel from the gravel pit. d. Other, please co nt. 4y, 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII?• / circle one answer /YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. I__ nsw/��as yes pI secomment on this question. Indicated the type and height o fencing or barrier (i.e. berm, wood C --;,` fence, metal chain length) you prefer. • 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. CS) Prior to extracting any sand and gravel from the gravel pit. d. Other,, p ease omment. / .Y^ 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. seoz--&-1-- a-4°4-* 4:2-heij" letzT2'4 -- � � Thank You for your cooperation in filling out this questionnaire.' Rod Allison Department of Planning Services ,,,� 915 10th Street , ✓/� ? p � G� Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 " 0e ',el • July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 ` NAME--, ---- :=P-i /�//C1/e0 4e. ----ill.0, -11./11/ /,,- '. ADDRESS i 7 AO ,c rte" c aiz-16 -.4FY s.. ---/3 3. 1. Should additional landscaping guidelines be required of the gravel pit A . operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer/cr) After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. - c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YE NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicat t e a 114- ight of fencing or barrier (i.e. berm, wood fence metal chain ength you prefer. . E•) c 7p- 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 01;;-<k\-) /5-577 Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 440O i / 7i/ 77/ 27- v/-1 .�i40,e% - NIL • July 24, 1985 - 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 az(NAME..- - i �- 67 /( 7, 147-7-n/i( is jf ADDRESS 1- h 1. Should additional landscaping guidelines be rdquired of the gravel pit 4 . operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES C2F) 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. r r , 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the and and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. a - � 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. • Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 vL July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME.. - i . ALL,064,1<isl....c., e, / 3 5. - Z U 2 ADDRESS J N �.Li.4 U r ALLeiLiteoZ • 6063/ 1. Should additional landscaping guidelines be required of the gravel pit 4 . : operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. -1 `f r C- 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b./ Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer �ES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) your. 4dly 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. (b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics., _eiLyjejLeLe iil 4,4,. . ! r ,4/1"-ji Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street _ Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 _� cio spa I Not (,4 iv- rr°d,,,ji July 24, �1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 a 1NAME.. -"' s y 2 - 'O - ADDRESS / `7' 9.0 e/ r 1 ,8 6 �/ 1. Should additional landscaping guidelines be rdquired of the gravel pit . - - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer (17) NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this questioa. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. /2o 4 I'L. -- )" /y2:4>t q'cll. .: /('''6/2- 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. c. . d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES' NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. J ; i 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary.0c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have + about the gravel pit as it relates to safety, noise, or visual aesthetics. b(-6eiz-ce-c6 4, r -1 /2-4 ck Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 ,; 6r� SoP ),s4- c .) ri-• • July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 .% NAME. ----- :-/C--- --e-t.C� '` - �-,ce.--- :3 -2. - /7 O 2 x 4. . - - ADDRESS // a 1 O 'e — ,e CL�..o, f'G 63/ ,7j 1. Should additional landscaping guidelines be required of the gravel pit . operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. r .7//L/--E?� `{ 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. - L . Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? -- - circle one answer YES_ NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer i .a 1 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 CIO/vtet 11(-- 2 /. July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME •- /-0 R e 5 ! /1 u e i/e i ADDRESS /0O /— E_ J , ti` 1. Should additional landscaping guidelines be rdquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. OPrior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. % • 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. i Prior to extracting any sand and gravel from the phases along the southern boundary. C) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. • Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 • July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME,.--- --ro S % 67 ce € /l e /L d ; 3 - 3 6 7 V ADDRESS / 0 e) 1.- E- /l - T d? l 1. Should additional landscaping guidelines be required of the gravel pit 4 . - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer E NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. • 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. 44 Prior to extracting any sand and gravel from the phases along the 'southern boundary. 674 c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. & Prior to extracting any sand and gravel from the phases along the southern boundary. ® Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 11. • 353 cj3 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 ' ADDRESS /Y 1. Should additional landscaping guidelines be relquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. - r ' . ,ew e q 74- ,Z,,1,--74 a'"e/iPe 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer , YES ) NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. d.c. � Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. n e2=d.feA) I % , , Jag /6 T 70/-ta -/3"14.-) e.g-4-766.7:1 Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME.. Y () ADDRESS 3 6 Zl SLt 1)(1-L5 z 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. • ft 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 0-1-0-1;11- ' ., '� 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. • 411 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street _ Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 r - July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME. N t ADDRESS /3 O CJ ZE 1. Should additional landscaping guidelines be rdquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. . icru ..6.apeey 01- 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. • b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please co ent. (213 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. C 4 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME l.0. y \ eiL '- ADDRESS /te r) / KeLL. 6Lc. 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate th tye of landscaping (i.e. trees, shrubs) you prefer. /0 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. Cc ) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? 1 circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. (---- ....5.......) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 4.5"41-11\-•`� . -Faj2° Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 • s. • July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME j43$37 '2S ADB / o Y �' /6 P.F.S 1. Should additional landscaping guidelines be required of the gravel pit • - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer-to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. X � — 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the t e and eight of fencing or barrier (i.e. berm, wood fence, metal chain leng h you prefer. /-(27/V—Q - 12/2'1---Ye- 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aes etics. A49/0-c9 p . Y\ 5 C--Q-Q-C-P 5 C- r.),\ cAlc.7 19.A.A_PvL-t-T14.; A6-4 5c77,-,A Thank You for your cooperation in filling out this questionnaire.' Rod Allison Department of Planning Services 915 10th Street _ Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 06)f- N't I y?si July 24, 1985 V QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME g, //t ADDRESS /.61‘O 7 L/6 5"7"--- 1. Should additional landscaping guidelines be rdquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? caS,- circle one answer 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landsc pg (i.e. trees, shrubs) you prefer. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES , NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. -� Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. • 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. S �d� / f /o ex;7� It(c7vt A" 74 0 Mc( 6 4 ci,/ a - 5i‹ Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 Nk G N''Pe isjg i/ July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 47 NAME-- !' .:1=a,0) > / ADDRESS 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. w , Indicate the type of landscaping (i.e trees, shrubs) you prefer. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c0 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YE NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated theytype and height of fencing or barrier (i.e. berm, wood fence, metal min lengt you prefer. 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. , fti Prio to extracting any sand and gravel from the gravel pit. d. Other, please commert. (1k),I, - . , ;- if 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. - 41 / :L. ' ; ' '.,-___:42-AAS, • ‘,-Ai_ i , .1---' 7 if --IL-C/r;e ir ) , -----7; : ' Lihi> v 24P -j. ' 17.61-e (l .`^ J,e1 Thank You for your cooperatii in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME @))o,, /"1a vt SO\ v,-S eV rn ADDRESS .17 97 J- Ea.5 El/11/4,G' 4 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. Ws,s A A_ C y ' C��/1 a a LC ei/Lc �sy`���ce .mss f&Ueos °z, � , o w�.s 3 , �1 V'i2 e bv1 c 1�J r S,u-r ! c k t I c Q i. r 4 012+e v� . .'1614 a W 6(); qi y ?hope-v-17-v-17 /;h e s to b@1/45!ik e F i e d r' r f* c / C t,o s, Fen star o t,...a GL 04. a(e 4 i :p tl . 3. At what point f5 the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. ePrior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. / �` 5,/, k tl C'c oC�;iJ 6' do ��' 0. 1 L, is E c - c.c. fTt� el NA S� CL fr o G am.. aS ( h , Indicated the type and height of fencing or barrier (i.e. berm, wood " f 7' fence, metal chain length) you prefer./6-0- k Lr, P 6. At what -point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 10J OR R 1 p j a ui 11 `co L; vt LC. Fe_v'tc L5Da Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 • July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME /i /,A / / g/''���✓ ADDRESS /F� /,� 71/4? 4 s/ 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES J NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. � ceNe/q - C /- �tee/O /3c/r' - /o '7e 't�/'erz�+f Gin eei ,)/' ��6 � /or 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 6c Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 7 eip%v /ti4 • 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary.(5) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. ,r / /UP(P�' 7'O //..e.90off of `�,,4, ' 4' , c y rl "rr �1 �6L - ' - fr �J/!/0 C °f O „{5/-'y F , '4 ,2 1, �S,', I1/'''';;13• O/� 5147/ I � �s it V v��IA r/1 (67®17_; 46/v�� i Ov 4/1 Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 , f July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME r� �/G��� ^ ��/(7)j'�'° #w C.Y/fa/^, ADDRESS /87 �L� E ✓Jgi:1ri it 9XC 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES_") NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate th type of landscaping (i.e. trees, shrubs) you prefer. tde GO 0 edd d_av;t; /it* 40/7,1e1 e7-5 111-ir away "l S rOS / �' . k- -ream ea " ce/ve 4r mod✓ 74/1"&t, qvieeiv be# /6 /W e eA Out Fero t' c'vt • P ake-oev 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 0 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer ES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. r 6. At what ,point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. e) Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. • WNW (// i/o see,/d4"/ /0e_.45- /?ass/a,0 e,`des eta O e.cs D��di�a,oO �pe fafe�� -C'e vc e /'/v�s Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 UK . . O/3 CV° /r144 • • July 24, 1985 " 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 P/nq g ADDRESS 1. Should additional landscaping guidelines be rdquired of the gravel pit 4 operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO . 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. r lre'CL*5- 6L-1-44! 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO . 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yea please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. igeryt ea„tel ___ S- /6/ iLek r • / 6. At what •point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. , c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 51-----otAl------r. ..e 1 pj- 1,&-p° SO0 )1 - 6LA Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 t R - - - July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 'ti NAME.-Y-•"i jfi tL 9 (3 147.21t.,4✓/ ., �/ a' h � ADDRESS / • 4 1 J E 7‘ 51 6-1p k" 4 y c_. e Po 6 .el 1. Should additional landscaping guidelines be rdgiiired of the gravel pit . - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer OYES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. }�'r II 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. �� Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Ind'cated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. / or I -' ' . 4 ' N 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. (c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. ,54 v Pr' STXR r T ,P O F V / T c:):dO0 Fl--- L J A/01)5—/1 G r so TA? 8c q .,✓ p 4- T Y Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 -- W 35-v2-' 7777 • July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 //l ADDRESS � �- 34- / Zp 1. Should additional landscaping guidelines be rdquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer -YES NO 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. j P d t/'mac -✓ r�N/`U 1 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer 71E—SDNO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain l .ngth) you prefer. 1 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 6E - goo_t___,A -y4 5-12-2-e-eo /64„„, Cr Thank You for your cooperati n in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 1 35 777 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME,- � GG' "` SOU ADDRESS 1"/ / _ 2.✓ G 1. Should additional landscaping guidelines be rdquired of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. *'l4Yu&, j 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer (-21!) NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain 15th) you prefer. I 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics.1711 p I L / - Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME (Dram n /1.4 G ADDRESS / 7/3 47774- , 4v 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer elp NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the/ type of landscaping (i.e. trees, shrubs) you prefer. C� � d�a -t�P E'lr.e � r 44,j ri ace,ssayy Lk) i d4�. - o2' Y`ei e � r� �� �G1 f�+ ®.t, &A-O, G� r Sri t" r-'e i'0 6.ci Ck /czt ) ben c-r,'c 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. -c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. -(L �� � c4a ,'m / 11k 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. The chat`/1t lib `- 4.4„_ ,0ould, L .e ®4.-1 6ist 4o rik s ® de a4 fed al. reedt 1e'/4 I aLrcapt'7 I.011 leek t o rd e re 41 .c cotes 41i fi let` St'. O 4 ape t ray e I Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME (A 1 4 , L6QI /5�' J ADDRESS 2'®® F- /(, s4-. 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate � the type of landscaping (i.e. trees, shrubs) you prefer. � Q/3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 0Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicat the—type an fight of fencing or barrier (i.e. berm, wood fenc , metal chain lengt you prefer. / 4c 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. /C---2 r i Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. 4 ` c Q '�la-C" S(77-e-,e 6"c¢ti,t,.(4�, C9 j ` I cif q /6_,t)„,,,, (/ ) j Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 L L g O &I t/ '� 3 ,5-2- 2 y 7O July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME: Arthur-C. Bistline Ov644r I s W/rs1' • ADDRESS 2074 E. 8 St. #1 , Greeley, Colorado 80631 1. Should additional landscaping guidelines be required of the gravel pit 4 F - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. The landscape should be returned to it's natural state as it was before any gravel operations started. Trees, shrubs & grasses should cover all 'barren areas. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. cePrior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. Chain link fence eight feet high with a three strand barb wire apron along the top should be minimum security for this type of operation. i - • • • July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:1O �- •NAMES:--. ADDRESS /.11. /f" � as •��'d`'�'4 , C 5J 3v�rt-VI / 311- /Pi/ 1. Should additional landscaping guidelines b required of the gravel pit - 4 operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer NO . 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. r tx , r 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer /� NO 4 . 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. ,1 • 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 4110 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. • 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aestheti7cs�y. ,14~Ca, T‘1111114 Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street • Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 • July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME CO fd / L i 4 tj5'G 1/ ADDRESS 0 E. /� ,Y-e ..Q, 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Ind cate the type of landscaping (i.e. trees, shrubs) you prefer. X11, 2'"ter. A4 r , 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. © Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer Iiiiil NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southere boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 110 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. rGL.w` C4)-111C24"--alle44-414-0410 46‘11/24 6P/ 44.4-4 oCheACK""-1 61140-14244"-LA. .-7A,44,-64),,, 7fr.„4,44...44/11:14) Thank You f your cooperation in f ing o t this questionnaire. IV CwL ��la�t.C /1/404 d Allis n " Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 wk. July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME •1d/i cia L. WA7 ADDRESS /7/3 A/a/er Ave, (Greeley Co 80 63/ 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer 412b NO 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. Scuera 1, rows of gees leas' 5d -Fee//• /A wi . 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. OPrior to extracting any sand and gravel from the phases along the southern boundary. •c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer gal) NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6 At milaf c he;n j et,7-th 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Weer ant -tear. oa IV) sheet — da,7er ''(o persons r;c I n9 horses and 0 h'ef s 4.4.5i n, +he sfreel Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME .46144:1/. ADDRFSS IQ/ (_i 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES) NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. -41 (%d'e-% �!/,. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer CES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. ' c.)/ Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. `72/ .,,,c,.....(x; ,.;,/,/,,,,JvAL--.,y, ,7,-ek, -A11:1)- 'L/"'L - - '!,^1 72.- ?,,---e-ii- t ' / SJ� s i''/,A �^e ✓ L Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 a fr, , July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME l „, �_- ti era-� J ADDRESS rp ,9 a p 2. ) ,. .:£. ; ti - 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. ec-o/- dot « e!_ Q! ,if-- 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. ?1 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. Q.; i 1 17., {_,.d ,-(3 1--- ,4_11, )...O ✓) 111 1 CC r r�ki c≥, e. I's t i\ )(p c. v,,-,d 0 \n &r,\l z..1-1 - 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. J . /h 6. At what point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. l! Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. -7 tt �P7T N O l, !iA 0 I 1 0 (o l� {- O t_ 'ti h C1 `a e 1' ' 5 F�� ` c.—rte �� G� J f� `� Ar Coo i Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 6c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 / - July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 / 4 „e � '� 3, 3 — 7 �4( ADDRESS 1. Should additional landscaping guidelines be rdgtired of the gravel pit 4 • - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 cr 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. .-2ZL YYC- r 3. At what point in th sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer 67) NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain lend) you prefer. 6 ' 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. (=c7._75 Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 NAME--._�---" G��-�� ��'' 353 -02-7y - ADDRESS 9 /d - a c'jO , V 1. Should additional landscaping guidelines be required of the gravel pit . - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES ,' NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. (i-rees, shrubs) you prefer. r ' 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, ,please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicat ype all eight of fencing or barrier (i.e. berm, wood fence, metal chain length) u prefer. 4./p d_' 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. rior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. .51,44.4.41Azi /Tit- 1.14-4.a402_ Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 1 r•• • • July 24, 1985 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 % NAME..--• ADDRESS g / a 1. Should additional landscaping guidelines be required of the gravel pit 4 operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the (FL) 'southern boundary. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer (-At NO • 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing r arrieerr (i.e. berm, wood fence, metal chain length) you prefer. • dry/ G /��f a . 6. At what .point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along • the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. 0c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. • 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. • Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street . Greeley, CO 80631 Phone: 356-4000 — Ext. 4400 N - el July 24, 1985 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 w P-C e e_ e, 3 J 3 - 0 -7/j ADDRESS 9 1 0 E -E. )4 S r p_ , ao 1. Should additional landscaping guidelines be required of the gravel pit operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YE NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. 5 5 tr 5 So ' t ‘.uo Tve-s Co ti-. wood maple. Wood QL,Yr la0.c.k h eY vy 3 Ywbs ��. ��. 9 �.�� Pry, �-te � 'tob� ���o � ' Jul I Yea 5 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. OPrior to extracting any sand and gravel from the gravel pit. d. Other, please comment. R 15 r, 1 Y ep 5 6 Ih r‘,..b 5 0 7 G cZ.S-E 4- est hour•-.of vie s *c - hp i scc BE?Y'Y'1 �'.v,s a- 6 Yj c P (lye./ 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer .YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicat- . - .. _ eight of fencing or barrier (i.e. berm, wood fence,'metal chain le tlr) you prefer. ` 11•hh �-t- .. ) east w ;th DO -Ua .,W, r 2 e r r i e r cA.Yl �0{� 6. At what ,point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. rfp G 1 h q t 0 be e X{e r1 d e cl. n n E a s 6 4_ k) p o n d i & s et, s A c_ S S v c © 'Y 1 Yp ec.-b'i 6 n � �c°� c h bOv A% bQS1 � d e As re u , red by A J grave I o eyat r is hs cuus'):.. cs Go( l 7. Please write down ally additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. AP `�r� Gk s )ecLv : p 1t a: Y'e0. 5V ow1d be 7a. r13�d y �o ke? P ,ra � �l , or\ 5 P.M nR ON-N Pci, Ve r su.. C es �- 9 � A IJ Wile) _ sing � reca. � or �� shg -4 ho1 )d be e 0tQck..e hay l'as 'm2r Thank You for your cooperation in filling out this questionnaire. Rod Allison Department of Planning Services 915 10th Street Greeley, CO 80631 Phone: 356-4000 - Ext. 4400 - July 24, 1985 - 1 QUESTIONNAIRE FOR AMENDED SUP-345:85:10 " NAME_.--- 7114/7 5",s9 (-? ) ADDRESS g_5-I4 / P ree J-e`r Fb 63) • 1. Should additional landscaping guidelines be required of the gravel pit • - operator along the southern boundary of gravel pit phases VII, IX, X, and XII? circle one answer YES NO 2. If your answer to question 1 was no, do not answer questions 2 or 3. If your answer was yes, please comment on this question. Indicate the type of landscaping (i.e. trees, shrubs) you prefer. See, c I/0h 0-c lye-e-s E L)hr- t..ble Hot- b esf SIA-lte To Pi 6-44---fr- 3. At what point in the sand and gravel operation should additional landscaping along the southern boundary of the gravel pit occur? circle one answer a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the • 'southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 4. Should any additional fencing or barrier standards be required of the gravel pit operator along the southern boundary of phases VII, IX, X, and XII? circle one answer - YES NO 5. If your answer to question 4 was no, do not answer questions 5 and 6. If your answer was yes please comment on this question. Indicated the type and height of fencing or barrier (i.e. berm, wood fence, metal chain length) you prefer. •N. --- •.iiiiiw' * -:'.' . 6. At what ,point in the sand and gravel operation should the additional fencing or barrier along the southern boundary of the gravel pit occur? a. After the sand and gravel has been removed from the phases along the southern boundary. b. Prior to extracting any sand and gravel from the phases along the southern boundary. c. Prior to extracting any sand and gravel from the gravel pit. d. Other, please comment. 7. Please write down any additional ideas, concerns, or questions you have about the gravel pit as it relates to safety, noise, or visual aesthetics. L_ p / �I p„d--4.0 0,„„t ....g-O-44„,LeLtAa X) -*a_, Thank You fo your cooperation in filling out this questionnaire. Atia_Ze J /, ',4)2ZU2,e„:( , I n n Hello