Loading...
HomeMy WebLinkAbout841147 ,`` �r�.n „q UNITED STATES 1 NUCLEAR REGULATORY COMMISSION 2 N i REGION IV "ILL 3 ' "^' I 611 RYAN PLA7A DRIVE, SUITE 1000 tram (TJTTq!^ f ti 1�" w�„ ARLINGTON, TEXAS 76011 D ,. r7.7 5 ;‘,-,(34 JUN 2 8 . �, Docket: 50-267 84 g GREET@r. COLD, Public Service Company of Colorado ATTN: 0. R. Lee, Vice President Electric Production P.O. Box 840 Denver, Colorado 80201 Dear Mr. Lee: As I discussed with you during our June 25, 1984 meeting, I and members of my staff have a number of concerns about a new building at the Fort St. Vrain site. This building, referred to as Building 10, contains some vital electrical equipment and should, therefore, provide acceptable levels of protection. Adequate information for us to reach a decision on the acceptability of this building has not been provided. We, therefore, request that you respond to the concerns presented in the enclosure to this letter. Further, we request that your response be submitted within 30 days of the date of this letter and be in accordance with the provisions of 10 CFR Part 50. 54(f). Since this reporting requirement relates solely to the Fort St. Vrain facility, fewer than ten respondents are affected; therefore, OMB clearance is not required under P. L. 96-511. If you have any questions on this subject, please contact the NRC Project Manager - Philip C. Wagner at (817) 860-8127. Sincerely, tJohn T. Collins U Regional Administrator Enclosure: NRC Concerns cc: See next page 841147 r Public Service Company of Colorado -2- cc: C. K. Millen hairman, Board of County Commissioners Senior Vice President of Weld County, Colorado Public Service Company Greeley, Colorado 80631 of Colorado P. 0. Box 840 Denver, Colorado 80201 James B. Graham, Manager Regional Representative Licensing and Regulation Radiation Programs East Coast Office Environmental Protection Agency General Atomic Company 1860 Lincoln Street 2021 K Street, NW, Suite 709 Denver, Colorado 80203 Washington, DC 20006 Don Warembourg J. K. Fuller, Vice President Nuclear Production Manager Public Service Company Public Service Company of Colorado of Colorado P. 0. Box 368 P. 0. Box 840 Platteville, Colorado 80651 Denver, Colorado 80201 Albert J. Hazle, Director G. L. Plumlee Radiation Control Division NRC Senior Resident Inspector Department of Health P. 0. Box 640 4210 East 11th Avenue Platteville, Colorado 80651 Denver, Colorado 80220 Darrell G. Eisenhut, Director Kelly, Stansfield & O'Donnell Division of Licensing Public Service Company Building Office of Nuclear Reactor Regulation Room 900 U.S. Nuclear Regulatory Commission 550 15th Street Washington, D.C. 20555 Denver, Colorado 80202 NRC CONCERNS ABOUT BUILDING 10 1. The safety evaluation contained in the Change Notice for the construction of Building 10 (CN 1460) concludes that the activity does not appear to involve an unreviewed safety question nor does it appear to be safety significant. We assume the basis for these conclusions is the statement that "the design criteria for the new structure meets or exceeds that applicable to the original plant." In order for us to determine your compliance with the provisions of 10 CFR Parts 50.59 and 50.92 we request that you provide a comparison of all applicable design criteria utilized for Building 10 to those of the original plant. 2. Provide a description of all of the safety related equipment located within Building 10 and briefly explain its function and/or significance; also include a discussion of any plans you may have for the installation of additional safety-related equipment. 3. Provide a discussion on how the provisions of 10 CFR Part 50.48 are being fulfilled in the absence of a staff fire protection evaluation report accepting the adequacy of protection to BTP 9. 5-1 . 4. Since it would appear that changes may be necessary to at least one of the first four categories of information (Background, Generic Planning Base, Licensee Planning Base, Responsibility Matrix) and that changes to the safeguards contingency plan (together with detailed procedures and personnel training) are required, provide a discussion on how the provisions of 10 CFR Part 50. 54(p) were fulfilled. Hello