HomeMy WebLinkAbout830366.tiff RESOLUTION
RE : APPROVAL OF ROAD IMPROVEMENTS AND MAINTENANCE AGREEMENT
WITH FRONTIER MATERIALS , INC. AND AUTHORIZATION FOR CHAIRMAN
TO SIGN SAME
WHEREAS , the Board of County Commissioners of Weld County,
Colorado, pursuant to Colorado statute and the Weld County Home
Rule Charter, is vested with the authority of administering the
affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners has been pre-
sented a road improvements and maintenance agreement between
Weld County and Frontier Materials, Inc. , and
WHEREAS, the terms and conditions of said agreement are as
stated in the agreement, a copy being attached hereto and in-
corporated herein by reference, and
WHEREAS, the Board has studied said agreement and deems it
advisable and in the best interests of the citizens of Weld
County to approve said agreement.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Com-
missioners of Weld County, Colorado that the agreement for road
improvements and maintenance between Weld County and Frontier
Materials, Inc. be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chairman be,
and hereby is , authorized to sign said agreement.
The above and foregoing Resolution was, on motion duly made
and seconded, adopted by the following vote on the 17th day of
October, A. D. , 1983.
ATTEST: � � BOARD OF COUNTY COMMISSIONERS
WE .COUNTY, COL DO
Weld County Clerk and corder
and Clerk to th/e Board } ucck Carlson, airman
rk J n T. Martin, Pro-Tem
K, eputy County -1 APP ED AS TO FORM: Se/0g-119t-e
n Gene R. Brantner
County1; ttorn �/L Norman Carlson
ac uel e Joh s
/ DAY FILE: October 19 , 1983 PL0778
Pary llg 830366
OCT - s 1983
COUNTY OF WELD, STATE OF COLORADO
ROAD IMPROVEMENTS AND MAINTENANCE AGREEMENT
THIS AGREEMENT, made and entered into this 17th day of
October , 1983, by and between the COUNTY OF WELD,
STATE OF COLORADO, hereinafter called "County" and FRONTIER
MATERIALS , INC., hereinafter called "Frontier" .
WHEREAS, Frontier has applied to the County for a Use by
Special Review Permit for an open-cut gravel pit and asphalt
batch plant located in part of Sections 20 and 21, Township
2 North, Range 68 West of the 6th Principal Meridian, and
WHEREAS, said gravel pit and asphalt batch plant will
generate increased truck traffic, and
WHEREAS, the County roads serving the property will not
efficiently support the increased truck traffic, and
WHEREAS, the County and Frontier have reviewed proposed
improvements to the existing county roads and acknowledged they
will enhance the accessibility and safety of the haul route to the
above-mentioned gravel pit and asphalt batch plant,
NOW, THEREFORE, in consideration of the mutual covenants and
conditions hereinafter set forth, the County and Frontier mutually
agree as follows :
1. The designated haul routes to be improved will
be Weld County Road 5 from the entrance to the
gravel pit and asphalt batch plant south to
Weld County Road 18 ; Weld County Road 18 from
Weld County Road 5 to Weld County Road 7; and
Weld County Road 7 from Weld County Road 18
south to State Highway 52.
2 . The improvements will consist of a 3 inch thick,
24 feet wide hot bituminous asphalt mat and a
total of 6 inches of aggregate base course on
Weld County Road 7 from Highway 52 to Weld County
Road 18 .
Weld County Road 18 from Weld County Road 7 to
Weld County Road 5 and Weld County Road 5 from
Weld County Road 18 to the entrance to the
gravel pit and asphalt plant will have a total
of 6 inches of aggregate base 20 feet wide . The
exact thickness of additional base course will
be determined by sampling and testing of the
existing materials.
3. Frontier will furnish the necessary base material,
hot bituminous pavement, equipment and labor to
construct the improvements .
4 . The County will reimburse Frontier for the cost
of the AC-10 liquid asphalt required to manu-
facture the hot bituminous pavement.
-1-
5 . The County will inspect and replace any culverts
and bridges that are in a deteriorated condition
prior to paving.
6 . All construction and materials shall be in accor-
dance with the State Department of Highways ,
Division of Highways, State of Colorado, Standard
Specifications for Road and Bridge Construction,
1981.
7 . The County will provide testing and inspection
for the construction.
8 . The unpaved portion of the designated haul routes ,
Weld County Roads 18 and 5 , will be maintained by
Frontier during periods of hauling by Frontier.
Maintenance will consist of regular grading to
keep the surface reasonably smooth and the control
of dust by the use of water, oils , or other com-
mercially available chemicals. The County will
be responsible for all other aspects of maintenance,
such as culverts and signs. After a 2-year period,
if the County or Frontier finds the maintenance of
the unpaved roads is unacceptable, the County and
Frontier may renegotiate the requirements on the
unpaved roads.
9 . Frontier will not be restricted in hauling either
direction on Weld County Road 7 from its intersec-
tion with Weld County Road 18 .
10 . Access from the gravel pit and asphalt batch plant
site to Weld County Road 20 to the north will be
allowed on an occasional basis , but is not desig-
nated as a haul route for periods of regular hauling.
IN WITNESS WHEREOF, the parties hereto have duly executed the
agreement the day and year first-above written.
FRONTIER MATERIALS, INC. BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
By: /�' Akita
Chuck Carlson, Chairman
Title : ei..2j0.4,14
ATTEST717Q.cAi ti CtiA,, leA,wuali :�+� '
Weld County Clerk and Recorder
and Clerk to the Board ,
BY titA
t-C �./' '12,2..O
-2-
Hello