Loading...
HomeMy WebLinkAbout810624 LAW OFFICES GEORGE A. EPPERSON DONALD F. McCLARY EDWARD L. ZORN t ate231 MAIN ST• V.O. BOX 597 \AO �� ' • 1\ FORT MORGAN COLORADO 80701 July 9, 1981 `� 0%:;›,-1.--:� `c\\ ...) 1-303/867 4.;21 l `1/.�11.�` 1L 1 Board of County Commissioners Weld County Weld County Court House Greeley, CO 80631 Re: Empire Diversion Works at Kuner Bridge Gentlemen: The officers of the Bijou Irrigation District have contacted me with regard to a problem which has arisen with regard to the structure constructed by Weld County at the Kuner Bridge crossing on the South Platte River. Your file, no doubt, reflects that in 1925, an agreement was made between the Bijou Irrigation District and the County for the construction of certain structures , and thereafter in 1970 , a new bridge structure was placed across the River. Again, correspondence and discussions between the District and the County were had. As a result of all of the above , it was agreed and the County had previously agreed to maintain and repair the facilities , thereby allowing the Bijou Irrigation District to divert water as it has in the past through its Empire diversion works immediately downstream from the Kuner Bridge. Also, your records will reflect that the North channel of the South Platte River was blocked by a roll-over type dam facility , thereby forcing water to remain in the main channel and thus accessible to the Empire diversion works immediately downstream. The problem now arises that the above roll-over type dam has become insufficient and needs repairs as water does escape around the ends and underneath the structure and is allowed to proceed in the north channel which channel does not join the main channel of the South Platte River until after the same has passed the Empire diversion works . Mr. Ross Osburn, Superintendent of the Bijou Irrigation District, has contacted the county authorities and has advised them of this potential problem. To date, nothing has been done, u1052 ,, , j 2-P,-- - ci c CO la Page 2 July 9, 1981 and no response has been received from the company . Consequently, we are asking that you immediately look into the matter and contact us in order that we may mutually resolve the pending problem. There is some immediate urgency to this matter as the Bijou Irrigation District plans to divert water into its Empire system on or before August 1, if available. Thus, if the water is still escaping from the main channel around the dam to the north channel, there will be no water available for diversion and the Bijou water will be lost to the stream. This , of course, would result in enormous irreparable damage to the Bijou Irrigation District in the form of crop failure and other foreseeable damages due to the failure and inability to deliver water to our District people. Our Superintendent indicates that the work to correct this matter will be fairly simple, and therefore, I do not see any reason why the matter cannot be immediately taken care of in order to eliminate any possible damages to the Bijou Irrigation District or its patrons. Please look into this matter at your earliest convenience and as soon as you are ready to make the necessary repairs , please contact Ross Osburn, Superintendent of the Bijou Irrigation District, whose phone number is 353-3323 in order that he may approve your plans for reinforcement and extension of the roll-over type dam. urs very tr DFM/bf cc : Mr. Sam Telep Attorney at Law 1220 11th Avenue, Suite 300 Greeley, CO 80631 County Engineer of Weld County Court House Greeley, CO 80631 Bijou Irrigation District 410 East Railroad Avenue Fort Morgan, CO 80701 Hello