HomeMy WebLinkAbout20260791 Resolution
Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of
County Road 25.5 Between County Roads 42 and 40 for Approximately
Five (5) Weeks, for Bridge Repairs
Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective
jurisdiction may, for the purpose of road construction and maintenance, temporarily close
to through traffic or to all vehicular traffic any highway or portion thereof for a period not
to exceed a specified number of work days for project completion and shall, in conjunction
with any such road closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
Whereas, pursuant to said Statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary
to temporarily close County Road 25.5, between County Roads 42 and 40, to through
traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said
closure being effective April 15, 2026, for approximately five (5) weeks for bridge repairs,
and orders the posting of such traffic control devices as shall be reasonably necessary to
regulate, warn, and/or guide traffic thereon for the safety of the general public and that
said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control
Devices.
Now, therefore, be it resolved that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 25.5 Between County Roads 42
and 40, be temporarily closed, as detailed above.
The Board of County Commissioners of Weld County, Colorado, approved the above
and foregoing Resolution, on motion duly made and seconded, by the following vote on
the 8th day of April, A.D., 2026:
[Insert Resolution Attestation Block Post Meeting]
2026-0791
EG0024
lytta Weld County Public Works
(970) 400-3750
1 1 1 1 H Street
COUNTY, CO PO Box 758
Greeley, CO 80632
April 1 , 2026
To: Board County Commissioners
Re: BOCC Agenda Item
Weld County Public Works is requesting permission to close CR 25.5 from CR 42 to
CR 40 from 4/15/2026 through 5/22/2026 for bridge repairs.
See attached closure diagrams.
Sincerely,
Amy Mutchie,
Permitting Coordinator
Public Works Department
2026-0791
ui E-�0074
www.invarion.com
r
i
1
,. J.�`�.-a WCR42 ....y�-a- ter_..,_ �.�.. ® -yi
® iiiii� W20-1F
M10
11 W20-1F 4
4 3 J M4-9
1
PROJECT#AN-6412026
± g i ROAD CLOSURE DESCRIPTION
• WCR 25.5betweenWCR 40n Ca d WCR 42
Closed 411512026 thru 512212026
1 Bridge Repairs
NOTICE TO PUBLIC
# Road signs and barricaded
i DETOUR ROUTE
i�
U I WCR 40 between WCR 25.5 and SH 60 ,25 mile paved,.25 gravel
SH 60 between WCR 40 and WCR 421 mile paved
WCR 42 between SH 60 and WCR 25.5 .5 mile gravel
NOTES,
•
•
ADT of WCR is: 8712024
Bridge:Repair
. Bridge is 1400'South of WCR 42 on WCR 25.5
.os.IL
Prepared by:Ryan Reynolds
♦ d
W20-1F M4-9 41112026
1
1
iW20-1F
Hello