To Whom It May Concern:
On March 16, 2026, the Colorado Air Pollution Control Division will be�in a 30-day
public comment period for Fundare Resources Company, LLC - Razor Federal 30K. A
copy of this public notice is enclosed.
Thank you for assisting the division by postin� a copy of this notice in your office. A
public copy of this notice is required by Colorado Air Quality Control Commission
regulations. The notice must be available for public inspection for a period of thirty
(30) days from the beginning of the public comment period. Please reference the
public notice for instructions on submitting comments.
�,r �o,
;�w � �?.� 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.Qov/cdphe
���/ �,�.aSb �'o
'� I � ' Jared Polis, Governor � Jill Hunsaker Ryan, MPH, Executive Director
. ,
,.\''�; � ��„
'.�s�6`
�ub\i� (�ev�� c�-'.`�LI.�E\rnr���A�NLI.�S�(�C�,(.�3c.�
2026-0484
��� a3�a� 1�t,�C�-N � G�.1 �Jol ������� Sc��
�3� i��a�
Air Pollution Control Division
" `" � Notice of a Proposed Construction Permit Warranting Public Comment
Website Title: Fundare Resources Company, LLC - Razor Federal 30K - Weld County
Notice Period Be�ins: March 16, 2026
Notice is hereby �iven that an application for a proposed project or activity has been submitted to
the Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Fundare Resources Company, LLC
Facility: Razor Federal 30K
Well Production Facility
NESW Sec 30 T10N R58W
Weld County
The proposed project or activity is as follows:
Fundare Resources Company, LLC submitted an application to modify an existing major well
production facility located in the Northern Weld County serious nonattainment area. The project
involves the installation of two (2) vapor recovery towers (VRTs) and the removal of the previously
approved Steffes SHP-6 open flare, which changes the status and control scenarios for three
separate points at the facility. With this project, the operator is requesting to cancel the flaring of
natural gas vented from two (2) two-phase inlet separators and two (2) three-phase heater treaters
during gas gathering system downtime (point 001), modify twelve (12) 400 barrel fixed roof crude
oil storage vessels connected via liquid manifold (point 003), and add new flaring of natural �as
vented from two (2) vapor recovery towers (VRTs) during vapor recovery unit (VRU) downtime
(point 010). The VRTs receive separator liquid, which captures flash emissions, then sends the
crude oil to the crude oil storage vessels while the VRTs are operational. While VRTs are not
operational, separator liquid bypasses the VRTs and flash emissions are routed to five (5) LEED L30-
001-000 enclosed combustion devices (ECDs). During VRU downtime, emissions from the VRTs are
routed to the same ECDs. Point 003 is currently covered under permit 15WE1401 and point 010 will
be newly covered by permit 25WE0268. Point 001 was covered under permit 15WE0389 but was
canceled during the permitting process due to emissions no longer existing for the point as the
�� ����
�e� �p�y��aG 4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 � www.colorado.Qov/cdphe
"� c"`�' Jared Polis, Governor � Jill Hunsaker Ryan, MPH, Executive Director
.*\�;`�.;.
\,,8�.
control scenarios changed throughout the permitting process. The facility is considered a synthetic
minor source of VOC under NANSR and Title V programs. This permit is being sent to public
comment because new synthetic minor limits are being requested.
The division has determined that this permitting action is subject to public comment requirements
under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.0 due to
the following reason(s):
• This source is requesting a federally-enforceable limit on the potential to emit to avoid
other requirements. (Regulation Number 3, Part B, Section III.C.1.d.)
The division has made a preliminary determination of approval of the application.
A copy of the application, the division's analysis, and a draft of construction permit number
15WE1401.CP7 are available on the division website: Air Permit Public Notices
The division hereby solicits submission of public comments from any interested person concerning
the ability of the proposed project or activity to comply with the applicable standards and
regulations of the commission. The division will receive and consider written public comments for
thirty (30) calendar days after the date of this notice. Comments may be submitted using the
following options:
� Submit comments via web form: Form for Public Comment on Draft Permit
• Submit comments via email: cdphe_apcd_airpermitcommentsC�state.co.us
• Submit comments via mail:
Air Poltution Control Division - Oil Ft Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, CO 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and
will be accessible to the public. Your comment(s) and the division's response(s) are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comment(s).
�������
,��1q,��9 4300 Cherry Creek Drive S., Denver, CO 80246-1530 � P 303-692-2000 � www.colorado.Qov/cdphe
�Q/-.�;-�:� c
"� �-�`�' �' Jared Polis, Governor � Jill Hunsaker Ryan, MPH, Executive Director
,��.,�_, .
�����,,
,��\_�,.
Hello