Loading...
HomeMy WebLinkAbout20260308 • Resolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 59 Between County Roads 74 and 76 for Approximately Two (2) Weeks, for Two (2) Culvert Replacements Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing:of the traffic affected.,.", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 59, between County Roads 74 and 76, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective February 23, 2026, for approximately two (2) weeks for two (2) culvert replacements. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices • shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 59, between County Roads 74 and 76, be temporarily closed, with said closure being effective February 23, 2026, for approximately two (2) weeks for two (2) culvert replacements, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:So(Rs),D:spa---c1.N, a p 2026-0308 02/I q/26 EG0024 Temporary Closure — County Road 59 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 11th day of February, A.D., 2026: Scott K. James, Chair: Aye �' ~•�: Jason S. Maxey, Pro-Tern: Aye ` ,} �► Perry L. Buck: Aye ® ;Lynette Peppier: Aye telt,� rill Kevin D. Ross: Aye ♦� ;e'14;o� Approved as to Form: • Ui''� Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2026-0308 EG0024 Weld County Public Works (970) 400-3750 1 1 1 1 H Street COUNTY, CO PO Box 758 Greeley, CO 80632 February 9, 2026 To: Board County Commissioners Re: BOCC Agenda Item Weld County Public Works is requesting to close CR 59 between CR 74 and CR 76 beginning 02/23/2026 through 03/6/2026 for 2-culvert replacements. Additionally, Weld County Public Works is requesting to close CR61 between State Highway 52 and CR 14 beginning 2/17/2026 through 2/20/2026 for a culvert replacement. See attached closure diagram. Sincerely, Ryan Reynolds Maintenance Support Supervisor Public Works Department 2026-0308 www.invarion.com a togr® o PROJECT#AN-59/2026 ROAD CLOSURE DESCRIPTION WCR 59 between WCR 76 and WCR 74 Closed 212312026 thru 3/612026 for Culvert Replacement NOTICE TO PUBLIC - u Road signs and barricaded Message boards to be used DETOUR ROUTE WCR 74 between WCR 59 and WCR 55 2 mile paved WCR 55 between WCR 74 and WCR 76 1 mile gravel WCR 76 between WCR 55 and WCR 59 2 mile gravel NOTES. ADT of WCR is:52112023 Culvert replaced is irrigation:New:15"&24"CSPA Culvert#1 is.6 north of WCR 74 on WCR 59 it7t ripgt Culvert#2 is,97 north of WCR 74 on WCR 59 SCR 14 Prepared by:Ryan Aragon -'g 215/2026 Hello