Loading...
HomeMy WebLinkAbout840687.tiff of Colo �ti � rN i O COLORADO DEPARTMENT OF HEALTH Richard D. Lamm 7c .,g'Hc5r"' * Thomas M.Vernon, M.D. Governor 1876 Executive Director WELD COUNTY r.rr-nr.,..-., September 13, 1984 d E CE Cy2`- :�• , , •l�. 1 j ! I SEP211984 ' , Weld County Commissioners GRE:LTv. c Box C Greeley, Colorado 80632 Gentlemen: On July 19, July 24 and September 4, 1984, Wes Potter of the Weld County Health Department and I performed inspections of the Road 54 E Vap, Park brine waste disposal facility in Weld County, Colorado. The purpose of these inspections were to assess the conditions of the excavated ponds prior to placement of the individual ponds liners. At the time of the first inspection the northwest pond had been completed and the southwest pond excavation was just being finished. The northwest pond had been over excavated in the southeast corner to remove a sandy zone, prior to liner placement. According to Mr. Jim Pankonin, an inspector for the firm of Norton, Underwood and Lamm, the overexcavated area would be backfilled to grade with clayey material prior to installation of the 18" liner. On July 24 I revisited the site with Mr. Potter to inspect the southwest pond. From this inspection of the pond it appeared that no sandy zones had been encountered during the excavation of this impoundment. On August 30 I received a call from Mr. Pankonin regarding a possible date and time we could arrange for inspection of the southeastern pond. Also at this time I was informed that around August 3rd Mr. Pankonin had been called away from the project and Mr. Tom Norton had temporarily assumed the site inspection duties. During this time period the northeast pond had been excavated and the liner placed without a visual inspection from either the Weld County Health Department or the Colorado Department of Health. 840687 PLOOS9 Li .. e , _ , - / t,1 j ( I Hti"t(/ rV /i'/I /j /.2V 4210 EAST 11TH AVENUE DENVER,COLORADO 80220 PHONE (303) 320-8333 Mr. Pankonin Indicated that from his onsite visits and during his absence , Mr. Norton's visits, it was their opinion that the northeast pond was appropriately excavated and that sandy zones were not encountered . Therefore . they felt that this pond would perform as designed and had instructed the construction personnel to install the liner. Wes Potter and I conducted a site inspection of the southeast pond on September 4 and found that this impoundment was acceptable to both agencies. During this visit additional discussions were held regarding the northeast pond in question and liner integrity prior to start up of operations. Mr. Pankonin indicated that the operator might flood the finished ponds with fresh water until brine wastes were received by the facility. One other method discussed was to placement of a soil blanket over the liner to help retain the appropriate moisture content. No final decisions were reached at this time regarding the final method to be utilized in maintaining the liner's integrity. Therefore, I have requested that Mr. Pankonin submit a letter to this Division outlining the selected method . Based upon these visual inspections it is my opinion that the excavation. of the inspected ponds was complete and acceptable and that placement of the liner material was appropriate. If you have any questions please contact me at 320-8333 ext. 6333. Sincerely, JJ .ott Winters Proiect Geologist Waste Mangement Division SW:pb cc: Arvin. Martensen, Owner Dr. Ralph Wooley, Weld Co. Health Dept. Wes Potter, Environmental Health. Director Rod Allison, Weld Co. Planning Tom Norton, Norton, Underwood and Lamm Dr. Arnott Hello