Loading...
HomeMy WebLinkAbout20110241.tiff • PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED TWIN VIEW PUD WELD COUNTY ROADS 3 AND 48 BERTHOUD, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 159-06 October 3, 2006 • Prepared for: Casseday Creative Designs, LLC 55 South Elm Avenue, Suite 210 Eaton, Colorado 80615 Attn: Ms. Linda Hulse Northern .11%.%L. Colorado Geotech 2956 29th Street, Unit 21 Greeley, Colorado 80631 Phone: (970) 506-9244 Fax: (970) 506-9242 • 2011-0241 • Northern Colorado Geotech October 3, 2006 2956 29th Street, Unit 21 Greeley, Colorado 80631 Phone: (970) 506-9244 Fax: (970)506-9242 Casseday Creative Designs, LLC 55 South Elm Avenue, Suite 210 Eaton, Colorado 80615 Attn: Ms. Linda Hulse Re: Preliminary Geotechnical Engineering Report Twin View PUD Northern Colorado Geotech Project No. 159-06 Northern Colorado Geotech has completed a geotechnical engineering exploration for the proposed Twin View PUD to be located near the intersection of Weld County Roads 3 and 48 near Berthoud, Colorado. This study was performed in general accordance with our proposal number P06026 dated July 17, 2006. The subsurface soils at the site consisted of lean clay with sand to depths of 10 to 11 feet. The results of our field exploration and laboratory testing indicate that the soils and bedrock at the site have low expansive potential and low load bearing capabilities. Based on the anticipated construction and the results of our engineering exploration, it is our opinion that the proposed will likely be supported by spread footing foundations. Standard septic systems will likely be possible on the majority of the site. Lot specific soil and percolation tests should be performed prior to the start of residential construction. If you have any questions concerning this report or any of our consulting services, please do not hesitate to contact us. Sincerely, NORTHERN COLORGOGEyyO�/T�pgCH loops M 4%; Preps by: AIPG Doug a grpn, .�. President ! \„_ Reviewed by: Gary G. Weeks, P.E. Vice President • Copies to: Addressee (4) . • TABLE OF CONTENTS Page No. Letter of Transmittal SCOPE 1 SITE CONDITIONS 1 PROPOSED CONSTRUCTION 2 SITE EXPLORATION 2 Laboratory Testing 2 SUBSURFACE CONDITIONS 3 Geology 3 Soil and Bedrock Conditions 3 Groundwater Conditions 4 Field Test Results 4 Laboratory Test Results 4 • DESIGN RECOMMENDATIONS 5 Foundation Design 5 Footing Foundations 5 Below Grade Construction 5 Surface Drainage 5 Floor Slab Design and Construction 6 Pavement Design and Construction 7 Septic System Construction 9 General Earthwork 9 Site Preparation g Fill Materials and Placement g GENERAL COMMENTS 11 ATTACHMENTS Boring Location Plan Logs of Borings Laboratory Test Results • PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED TWIN VIEW PUD WELD COUNTY ROADS 3 AND 48 BERTHOUD, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 159-06 OCTOBER 3, 2006 SCOPE This report contains the results of our preliminary geotechnical engineering exploration for the proposed Twin View PUD to be located near the intersection of Weld County Roads 3 and 48 near Berthoud, Colorado. This report includes descriptions of, and preliminary geotechnical engineering recommendations relative to: • subsurface soil and bedrock conditions • • groundwater conditions • foundation design and construction • basement construction • drainage • pavement design and construction • septic systems • earthwork The recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil conditions, structures and our understanding of the proposed project. SITE CONDITIONS The northern portion of the site is vegetated with alfalfa and the southern half of the field has been cleared. Surface drainage is poor to the northeast. Weld County Road 3 borders the property to the west. A large irrigation ditch is located north of the site. Agricultural fields were located to the south and east. • • • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 PROPOSED CONSTRUCTION As we understand it, the project will consist of building an approximate 9 lot estate-style PUD development northeast of Berthoud, Colorado. The lots will be serviced by on-site sewage disposal systems. It is anticipated that the access roads for the development will be paved with asphalt. SITE EXPLORATION A total of six test borings were drilled on August 9, 2006. The borings were drilled to approximate depths of 5 to 15 feet at the locations shown on the Site Plan, Figure 1. Additionally, one preliminary percolation boring was drilled adjacent to each soil boring. All borings were advanced with a truck-mounted drilling rig, utilizing 4- and 6-inch diameter solid stem augers. The borings were located in the field by pacing from property lines and/or existing site features. Relative surface elevations at the boring locations were obtained by measurements with an engineer's level from a temporary bench mark (TBM) shown on the Site Plan. The accuracy of boring locations and elevations should only be assumed to the level implied by the methods used • to determine each. Lithologic logs of each boring were recorded by an engineering geologist during the drilling operations. At selected intervals, samples of the subsurface materials were taken by driving split- spoon and/or ring samplers. Standard penetration measurements were recorded while driving a split-spoon and/or ring sampler into the subsurface materials. The standard penetration test is a useful index in estimating the density of the materials encountered. Groundwater conditions were evaluated in each boring at the time of subsurface exploration, and eight days after the drilling. Laboratory Testing The samples retrieved during the subsurface exploration were returned to our laboratory for observation by the project manager. The soils were classified in general accordance with the Unified Soil Classification System. At that time, the field descriptions were confirmed or modified and an applicable laboratory testing program was formulated. Boring logs were prepared and are attached with this report. • 2 • • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 Laboratory tests were conducted on selected samples and are presented on the boring logs and attached laboratory test sheets. The test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. Selected samples were tested for the following engineering properties: • Water Content • Atterberg Limits • Dry Density • Percent Fines • Consolidation • Expansion • Compressive Strength SUBSURFACE CONDITIONS Geology The proposed area is located within the Great Plains physiographic province. The Colorado Piedmont is located near the western border of the Great Plains province and was formed during • Late Tertiary and Early Quaternary time (approximately 2,000,000 years ago). The Colorado Piedmont is a broad, erosional trench which separates the Southern Rocky Mountains from the High Plains. Structurally, the site lies along the western flank of the Denver Basin. During the mountain building of the Laramide Orogeny (approximately 70,000,000 years ago), intense tectonic activity occurred, causing the uplifting of the Front Range and associated downwarping of the Denver Basin to the east. Due to the erosional action of wind and streams, relatively flat uplands and broad valleys characterize the present-day topography of the Colorado Piedmont in this region. Due to the relatively flat nature of the site, geologic hazards at the site are anticipated to be low. Seismic activity in the area is anticipated to be low; and from a structural geology standpoint, the property should be relatively stable. With proper site grading around proposed structures, erosional problems at the site should be minimal. Soil and Bedrock Conditions Soils at the site generally consisted of lean clay with sand to depths of approximately 10 to 11 feet. The materials underlying the surface soils and extending to the maximum depth of exploration consisted of sandstone bedrock. Summary boring logs are attached with this report. • 3 • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 Groundwater Conditions Groundwater was encountered at approximate depths of 111/2 to 13 feet in the test borings at the time of field exploration. When checked eight days after the drilling, groundwater was measured at approximate depths of 10 to 12 feet. These observations represent groundwater conditions at the time of the field exploration, and may not be indicative of other times, or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions. Due to the impermeable nature of the bedrock materials, areas of perched and/or trapped groundwater may occur at times in the subsurface soils overlying bedrock. The location and amount of perched water is dependent upon several factors, including hydrologic conditions, type of site development, irrigation demands on or adjacent to the site, fluctuations in water features, seasonal and weather conditions. Field Test Results Field test results indicate that the clay soils vary from very soft to medium in consistency. The bedrock varies from soft to hard in hardness. • Preliminary percolation testing is summarized as follows: Preliminary Percolation Test Results Test Hole Depth Soil Percolation Rate (inches) Classification (minutes/inch) 1 36 CL 48 2 36 CL 80 3 36 CL 60 4 36 CL 60 The soils within the development have fair to poor percolation rates. Laboratory Test Results Laboratory test results indicate that the soils have low expansive potential and low load bearing capabilities. • 4 • • Casseday Creative Designs Twin View POD Northern Colorado Geotech Project No. 159-06 DESIGN RECOMMENDATIONS Foundation Design Based on the results of our preliminary subsurface exploration, it is our opinion that spread footing foundations are likely feasible for proposed structures. The footings should be placed on undisturbed soils and/or engineered fill material. Potentially expansive soils, areas of soft soils and relatively shallow groundwater will require particular attention in the design and construction. Evaluation of site specific soils testing conducted on individual lots during supplemental geotechnical exploration is recommended. Footing Foundations Based on the results of our preliminary subsurface exploration, it is our opinion that spread footing foundations bearing upon undisturbed soil and/or engineered fill will likely be feasible for support of proposed structures. The footings may be preliminarily designed for maximum bearing pressures of 750 to 1,500 psf. • Exterior footings should be placed a minimum of 30 inches below finished grade for frost protection and to provide confinement for the bearing soils. Finished grade is the lowest adjacent grade for perimeter footings. Below Grade Construction Groundwater was encountered on the site at approximate depths of 10 to 12 feet below existing grade. Basement construction is considered feasible throughout most of the site provided that the basement is placed a minimum of 3 feet above the groundwater. To reduce the potential for groundwater to enter the basement of the structure, installation of a dewatering system is recommended. Surface Drainage Positive drainage should be provided during construction and maintained throughout the life of the proposed project. Infiltration of water into utility or foundation excavations must be prevented during construction. Planters and other surface features which could retain water in areas adjacent to the building or pavements should be sealed or eliminated. In areas where sidewalks or paving do not immediately adjoin the structure, we recommend that protective slopes be provided with a minimum grade of approximately 10 percent for at least 10 feet from perimeter walls. Backfill • 5 �• Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 against footings, exterior walls, and in utility and sprinkler line trenches should be well compacted and free of all construction debris to reduce the possibility of moisture infiltration. Downspouts, roof drains or scuppers should discharge into splash blocks or extensions when the ground surface beneath such features is not protected by exterior slabs or paving. Sprinkler systems should not be installed within 5 feet of foundation walls. Landscaped irrigation adjacent to the foundation system should be minimized or eliminated. Floor Slab Design and Construction Some differential movement of slab-on-grade floor systems is possible should the subgrade soils become elevated in moisture content. To reduce potential slab movements, the subgrade soils should be prepared as outlined in the earthwork section of this report. Additional floor slab design and construction recommendations are as follows: • Positive separations and/or isolation joints should be provided between slabs and all foundations, columns or utility lines to allow independent movement. • • Control joints should be provided in slabs to control the location and extent of cracking. • A minimum 2-inch void space should be constructed above, or below non-bearing partition walls placed on the floor slab. Special framing details should be provided at door jambs and frames within partition walls to avoid potential distortion. Partition walls should be isolated from suspended ceilings. • Interior trench backfill placed beneath slabs should be compacted in accordance with recommended specifications outlined below. • In areas subjected to normal loading, a minimum 4-inch layer of sand, clean-graded gravel or aggregate base course should be placed beneath interior slabs. • A minimum 4-inch layer of free-draining gravel should be placed beneath basement floor slabs in conjunction with the underslab drainage system. • Floor slabs should not be constructed on frozen subgrade. • 6 Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 Exterior slabs-on-grade, exterior architectural features, and utilities founded on, or in backfill may experience some movement due to the volume change of the backfill. Potential movement could be reduced by: • minimizing moisture increases in the backfill • controlling moisture-density during placement of backfill • using designs which allow vertical movement between the exterior features and adjoining structural elements • placing effective control joints on relatively close centers Pavement Design and Construction The required total thickness for the pavement structure is dependent primarily upon the foundation soil or subgrade and upon traffic conditions. Based on the soil conditions encountered at the site, the anticipated type and volume of traffic and using a group index of 15 as the criterion for pavement design, the following minimum pavement thicknesses are recommended: Recommended Pavement Thicknesses (Inches) ..,� Traffic Area Alternative Asphalt Aggregate Plant-Mixed Portland Concrete Base Bituminous Cement Surface Course Base Concrete Total Residential A 3 8 11 Streets B 6 6 Each alternative should be investigated with respect to current material availability and economic conditions. Rigid concrete pavement, a minimum of 6 inches in thickness, is recommended at the location of dumpsters where trash trucks park and load. Aggregate base course (if used on the site) should consist of a blend of sand and gravel which meets strict specifications for quality and gradation. Use of materials meeting Colorado Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for base course. Aggregate base course should be placed in lifts not exceeding six inches and should be compacted to a minimum of 95% Standard Proctor Density (ASTM D698). Asphalt concrete and/or plant-mixed bituminous base course should be composed of a mixture of aggregate, filler and additives, if required, and approved bituminous material. The bituminous base and/or asphalt concrete should conform to approved mix designs stating the Superpave properties, • Casseday Creative Designs � Twin View PUD Northern Colorado Geotech Project No. 159-06 optimum asphalt content, job mix formula and recommended mixing and placing temperatures. Aggregate used in plant-mixed bituminous base course and/or asphalt concrete should meet particular gradations. Material meeting Colorado Department of Transportation Grading S or SX specification is recommended for asphalt concrete. Aggregate meeting Colorado Department of Transportation Grading G specifications is recommended for plant-mixed bituminous base course. Mix designs should be submitted prior to construction to verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and should be compacted to a minimum of 92% maximum theoretical specific gravity. Where rigid pavements are used, the concrete should be obtained from an approved mix design with the following minimum properties: • Modulus of Rupture @ 28 days 550 psi minimum • Strength Requirements ASTM C94 • Cement Type Type I-II Portland • Concrete Aggregate ASTM C33 and CDOT Section 703 �• Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes from the time the water is added to the mix. Other specifications outlined by the Colorado Department of Transportation should be followed. Longitudinal and transverse joints should be provided as needed in concrete pavements for expansion/contraction and isolation. The location and extent of joints should be based upon the final pavement geometry. Sawed joints should be cut within 24-hours of concrete placement, and should be a minimum of 25% of slab thickness plus 1/4 inch. All joints should be sealed to prevent entry of foreign material and dowelled where necessary for load transfer. The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. When unstable conditions develop, workability may be improved by scarifying and drying. Overexcavation of wet zones and replacement with granular materials may be necessary. Use of lime, fly ash, kiln dust, cement or geotextiles could also be considered as a stabilization technique. Laboratory evaluation is recommended to determine the effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation equipment may be required to reduce subgrade pumping. • 8 • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 Septic System Construction Field test results indicate that standard septic systems should be feasible throughout the majority of the site. Site specific percolation tests should be performed when residences and septic systems have been sited on each individual lot. General Earthwork All earthwork on the project should be observed and evaluated by Northern Colorado Geotech. The evaluation of earthwork should include observation and testing of engineered fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during the construction of the project. Site Preparation Strip and remove existing vegetation, debris, and other deleterious materials from proposed building and pavement areas. All exposed surfaces should be free of mounds and depressions which could prevent uniform compaction. • Stripped materials consisting of vegetation and organic materials should be wasted from the site, or used to revegetate landscaped areas or exposed slopes after completion of grading operations. If unexpected fills or underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. The individual contractor(s) is responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. Fill Materials and Placement All exposed areas which will receive fill should be scarified to a minimum depth of eight inches, conditioned to near optimum moisture content, and compacted. • 9 • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 The placement of soils on the site should be observed by Northern Colorado Geotech. The fill should be assessed for suitability of use in the proposed fill and tested for placement including compaction percentage and moisture content. Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. Recommended compaction criteria for engineered fill materials are as follows: Clean on-site soils or approved imported materials may be used as fill material. Imported soils (if required) should conform to the following: Percent fines by weight Gradation JASTM C136} 6" 100 3" 70-100 No. 4 Sieve 50-100 • No. 200 Sieve 60 (max) • Liquid Limit 30 (max) • Plasticity Index 15 (max) Minimum Percent Material (ASTM D698} Scarified subgrade soils 95 On-site and imported fill soils: Beneath foundations 95 Beneath slabs 95 Beneath pavements 95 Aggregate base (beneath slabs) 95 Miscellaneous backfill (non-structural areas) 90 On-site or imported clay soils should be compacted within a moisture content range of 2 percent below, to 2 percent above optimum. Granular soils should be compacted within a • 10 • Casseday Creative Designs Twin View PUD Northern Colorado Geotech Project No. 159-06 moisture range of 3 percent below to 3 percent above optimum unless modified by the project geotechnical engineer. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon data obtained from borings performed to obtain representative subsurface conditions at the site. Variations in the soil between borings will occur. Northern Colorado Geotech should be present during construction to observe the excavation and construction procedures and confirm or modify our recommendations. The scope of services for this project does not include either specifically or by implication any environmental assessment of the site. This report has been prepared in accordance with generally accepted geotechnical engineering practices in this area at this time. No warranties, either express or implied, are intended or made. • • 11 I ' I I \ Lot'D' II \ ..\. Lot'A' \ i ( ti.T, \ l co \ w ! v '\• ❑ Lot'Cr O 0 I LOT 3 NO.tZ o ... N° (1111:) No.6 Z LOT. LOT 7 S' p No-3 _ �.-' • No.4 o OJ 1.1. LO ......._..._.�..._...LOT 8....._..._S_LOT 6 ..,. W . (I ) H LOT'B' I I A"runt%o AWN I.rl♦1 O iNOf OWN III _. — ` BORING LOCATION PLAN NI TWIN VIEW PUD WELD COUNTY ROAD 3 WELD COUNTY,COLORADO FOR CASSEDAY CREATIVE DESIGN,LLC Project No. North t 5s-os Coloradoern Scale' NOT TO SCALE Geotech Dale: 9-19-06 2956 29th Slreel,Unit 21 DIAGRAM IS FOR GENERAL LOCATION ONLY, Greeley,Colorado 60637 PlCl2tl Mgr DML ANO IS NOT INI'ENDED FOR CONSTRUCTION PURPOSES Phone: (970)506-9244 Fan: (970)506-9242 Figure No. r LOG OF BORING No. I Sheet 1 of • CLIENT ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County,Colorado Twin View PUD SAMPLES TESTS O co Z } w OI- IN Z> w ~ a F z u. o v r w w W LL O m z 0 I-- ≥ > w a a r -6R m w ccw I O 0 - O LU Q 0 e0 Ca> a.w c9 o mz Z z ?? 0aO. ZO mo o_ 0.5 6"TOPSOIL .�. 5 1 SS 18 8 r 4. . LEAN CLAY WITH SAND Light brown, moist,soft to medium -f _ 4 2 SS 12 11 33/17/76 5- • 5 3 RS 12 19 102 2000 0.9% Swel 10—, 11.0 — WEATHERED SANDSTONE Gold, moist to wet,soft - I - 26 4 SS 12 19 15.0 15 BOTTOM OF BORING WATER LEVEL OBSERVATIONS Northern STARTED 8/9/06 FINISHED 8/9/01 • WL Q 13.0 W.D. /4& o!orado _L_ __ Geotech DRILL co. Drilling Eng DRILL RIG CME-5. a WL Y 12.0 A.B. 2956 29th Street,Unit 21 LOGGED BY DEC APPROVED DMI o Greeley,Colorado 80631 g Phone: 970-506-9244 d,N. When Checked 8 Days A.B. Fax: 970-506-9242 NCG PROJECT No. 159-06 LOG OF BORING No. 2 Sheet 1 of 1 • CLIENT ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County, Colorado Twin View PUD SAMPLES TESTS r_DO D' e >- 0 W w _ Z_ —1 (N Z> W IT) z ~ IT 0 Cw 0 >O W D W ii:..05 -F _ _ � m w arw ti o Z Cpw ¢ w OJ> > o_ 0 - O ¢LL z0 —1<X 0 0 CO z ?? 2_'Ai? ES 0aa 0.5 6"TOPSOIL -yyi LEAN CLAY WITH SAND r Light brown, moist, very soft — — � 2 1 RS 12 26 91 3000 0.0% Swell 5III — )i 1 2 SS 12 35 40/21/71 10.0 V / 10- WEATHERED SANDSTONE Gold, moist to wet, soft — _ 13.0 _ SANDSTONE - Gold,wet, hard — - - _ ` 50/10 3 SS 10 11 15.0 — —ti BOTTOM OF BORING 15 WATER LEVEL OBSERVATIONS Northern STARTED 8/9/06 FINISHED 8/9/06 Colorado ` •WL Q 1.5 W.D. Geotech DRILL CO. Drilling Eng DRILL RIG CME-55 a WL 1 10.0 A.B. 2956 29th Street,Unit 21 LOGGED BY DBC APPROVED DML D Greeley,Colorado 80631 o Phone: 970-506-9244 When Checked 8 Days A.B. Fax: 970-506-9242 NCG PROJECT NO. 159-06 , LOG OF BORING No. 3 Sheet 1 of 1 S CLIENT ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County, Colorado Twin View PUD SAMPLES TESTS o 0 00 W ae O w Z -.2 }- N Z> U V1 Z` t--:Z U LU c W 0 W Z LL N -F- cl_ z O� U2 CLw CI Za new < r- a> W OD: en ce w O> > a 0 QU Z0 pQW 0 O mZ Z -- 2 CO- DO add 6"TOPSOIL -A.,y 0.5 LEAN CLAY WITH SAND Light brown, moist, soft to medium 6 1 RS 12 12 111 5000 0.6% Swell 5 AP 3 2 SS 12 29 Y. 10 11.0 WEATHERED SANDSTONE Tan to gold, moist to wet, soft Q 13.0 SANDSTONE _ Gold,wet, hard - 50/8 3 SS 8 13 15.0 -. 15 BOTTOM OF BORING , - l aii WATER LEVEL OBSERVATIONS Northern STARTED 8/9/06 FINISHED 8/9/06 Colorado —,41,WL SZ 11.8 W.D. Geotech DRILL co. Drilling Eng DRILL RIG CME-55 E WL T. '10.0 A.B. 2956 29th Street,Unit 21 LOGGED BY DBC APPROVED DML o Greeley,Colorado 80631 rn When Checked 8 Days A.B. Phone: 970-506-9244 NCG PROJECT NO. 159-06 ,n Fax: 970-506-9242 1 ' LOG OF BORING No. 4 Sheet 1 of 1 __AAik ll, ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County,Colorado Twin View PUD SAMPLES TESTS 0 O a a > w tu --J H N Z> W ill Z O zzw 1r WO 0: Z u=N 0- I �� m w rew N 0 po- Q 0 0 mz Z ?? 2 oa �o 6"TOPSOIL y y y 0.5 LEAN CLAY WITH SAND Light brown, moist,very soft to medium 5 1 SS 12 12 5- -• - -`l\ 1 2 SS 12 12 • 10.0 10-. WEATHERED SANDSTONE Tan to gold, moist to wet,soft 1 _ 13.0 - SANDSTONE — Tan to gold,wet, hard 50/11 3 SS 11 31 ^ 15.0 - 15 BOTTOM OF BORING WATER LEVEL OBSERVATIONS Northern STARTED 8/9/06 FINISHED 8/9/06 ak Colorado 4/SwL Q 12.5 W.D. Geotech DRILL co. Drilling Eng DRILL RIG CME 55 , a WL t 11.5 A.B. 2956 29th Street,Unit 21 LOGGED BY DBC APPROVED DML co Greeley,Colorado 80631 6,` When Checked 8 Days A.B. Phone: 970-506-9244 NCG PROJECT No. 159-06 Fax: 970-506-9242 LOG OF BORING No. 5 Sheet 1 of 1 CLIENT ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County, Colorado Twin View PUD SAMPLES TESTS O CI) cc e o w O N z� w (75 o, z� FZLL O LL. -W e_ W O K Z E N -F- _ 7 W 4 J = F 3� m w �w �' O pa ORw Q N U w �> > a �� O ¢U z0 Da¢ Lt o mz z ?± g cc!, g �aa 0.5 6"TOPSOIL ;yyy 7 1 SS 18 16 34/18/87 LEAN CLAY WITH SAND �j/� Light brown, moist, soft to medium %% • Y 2 2 SS 12 17 34/18/81 5.0 !//A 5 BOTTOM OF BORING __.• WATER LEVEL OBSERVATIONS Northern STARTED 8/9/06 FINISHED 8/9/06 "O\Ckolorado _, WL None W.D. Geotech DRILL co. Drilling Eng DRILL RIG CME-55 v WL None A.B. 2956 29th Street,Unit 21 LOGGED BY DBC APPROVED DML Greeley,Colorado 80631 N When Checked 6 Days A.B. Ph Fax: 970-506-9242 NCG PROJECT NO. 159-06 LOG OF BORING No. 6 Sheet 1 of 1 �• CLIENT ARCHITECT/ENGINEER Casseday Creative Design, LLC SITE Weld County Road 3 PROJECT Weld County, Colorado Twin View PUD SAMPLES TESTS o cc ey co O W F W Fp? O zW a WO cc LLw ZH D W a J a F �J aa KW 0H 0 pa 0FW �Q w CO N 0 K W OJ> }a} O o o ZO paW o 0 COZ Z F ZZ 3 pa DO 0aa 6"TOPSOIL y + 5 1 - SS 18 ' 14 ' 41/23/86 0.5 LEAN CLAY WITH SAND // Light brown, moist,soft to medium %/�/ — 2 2 SS 12 28 5.0 5 BOTTOM OF BORING WATER LEVEL OBSERVATIONS Northerna STARTED 8/9/06 FINISHED 8/9/06 Colorado AtOWL None W.D. Geotech DRILL CO. Drilling Eng DRILL RIG CME-55 a WL None A.B. 2956 29th Street, Unit 21 LOGGED BY DBC APPROVED DML O Greeley,Colorado 80631 When Checked 8 Days A.B. Phone: 970-506-9244 NCG PROJECT NO. 159-06 Fax: 970-506-9242 -3 -AD -2 -1 - 0 z 1 - ce — co 2 - • 3--II, 4 - 5 __ 0.1 1 10 STRESS,ksf Specimen Identification Classification Yd MC% • 1 8.0 Lean Clay with Sand 102 19 • Northern CONSOLIDATION TEST _ 2956 29th Street,unit 21 Client: Casseday Creative Design, LLC Number: 159-06 Colorado Greeley,Colorado 80631 Phone: 970-506-9244 0 Geotech Fax: 970-506-9242 Project: Twin View PUD �, Location: Weld County Road 3 -3 -ID 2 . -1 - 0 oes___________________Th_________t_______.:. ... . z 1 - . ce - u) 2 - AD 3 - 4 5 , 0.1 1 10 STRESS,ksf Specimen Identification Classification Yd MC% • 3 3.0 Lean Clay with Sand 111 12 0 CONSOLIDATION TEST Northern 2956 29th Street, Unit 21 Colorado Greeley,Colorado 80631 Client: Casseday Creative Design, LLC Number: 159-06 + Phone: 970-506-9244 Project: Twin View PUD m ro Geotech Fax: 970-506-9242 1 O Location: Weld County Road 3 Hello