November 29,2004
Anthony Brigham
2228 Parshall Drive.
Loveland,CO 80538
Re: 9-Lot Subdivision Development of Parcel#080519000057
North Weld County Water District is able and intends to serve the proposed 9 Lots,located in a portion of the
'V4
Northeast of Section 19,Township 6 North,Range 66 West,of the 6 Principal Meridian.
To provide water service and a fire flow of 1,000 gpm, a 12-inch waterline will have to be constructed along Hwy
392 from WCR 27 (northbound)to WCR 27(southbound). This waterline will be approximately 1,320-feet in
length. The District will receive benefit from the construction of the waterline, and therefore will participate in the
construction costs. North Weld County Water District estimates the cost for this construction to be$64,000.0°.
The District will require the Developer to pay a portion of such cost currently estimated to be$16,000.00.
Additionally the District will have to install valves and connecting tee in the existing waterline located within the
WCR 27 Right-of-Way,such connection is estimated to cost$4,000.00. Therefore,the total cost of$20,000.°°will
be known as the(1)Infrastructure Enhancement Fee. The Infrastructure Enhancement Fee must be approved by
firth Weld County Water Districts' Board of Directors and is subject to re-evaluation before approval of a Water
rvice Agreement.
The fees,expenses and charges for a water tap consist of(1)Infrastructure Enhancement Fee;(2)raw water or cash
in lieu; (3)Plant Investment Fee; (4)Mileage Charge; and(5)Meter Fee. The District requires that the(2)
dedication of raw water or cash in lieu; (3)Plant Investment; (4)Mileage requirements be fulfilled in conjunction.
After the raw water dedication or cash in lieu,the Plant Investment Fee and the Mileage Charge have been
dedicated and/or paid, the Developer or Lot Owner will have up to one year to have the meter set. Once the meter
has been set or after one year of the payment and/or dedication of Raw Water,Plant Investment Fee and Mileage
Charge,the District shall begin billing the Developer or Lot Owner a minimum monthly charge, as established by
the District and in effect at the time. The Developer will be required to pay such fees in a minimum phase of 25%
of the total number of lots or in phases of 5 lots,whichever is less. For example,in a 9 Lot subdivision a minimum
of 2 taps will have to be purchased in full at a time, even if only one lot is in need of a water service. Then if
within one year only one meter has been set and billing begun,the other meter that has not physically been
activated will still receive minimum monthly billings.
0K
'"ubdivisions\NIBM-AnthonyBrigham\Intent(11-29-04).doc i )��
��%�w I� H �C'
Gf
2005-3350
Refer to the following Table for the costs of the associated Fees that are currently in effect. All Fees and
Requirements are subject to change without notice, therefore;it is recommended to keep in contact with the
District periodically for updated costs and requirements.
Fees and Cost Time of Payment
Requirements (as of November 29,2004)
Off-Site Infrastructure $20,000.00 Before Construction of Water Line
Fire Flow Fee $TBD TBD
Plant Investment Fee $67,500($7,500 per Lot) Date To Be Determined
Distance Fee $32,400($300 per mile x 12 Miles Date To Be Determined
per Lot)
Raw Water Requirement $108,000($12,000 per Lot)* Before Individual Meters will be Set
Meter Set Fees Approx. $7,200(At Cost,per Lot) After Individual Meters have been Set
Total Fees
Total Cost for 9 Lots $235,100 **
($26,122 per Lot)
*Raw Water Requirement may be met by transfer of Water Rights and a Raw Water Storage Fee of$1,000 per
Unit of Raw Water Transferred. Normal transfer is one Unit of Colorado Big Thompson Project Water(or
Equivalent)per Lot.
,***Cost does not include the internal waterlines that shall be constructed by the Developer.
It is the Developers' responsibility to have the internal water mains designed by an engineer,and such designed
plans shall be approved by the District. North Weld County Water District will require waterline easements to be
shown on the final plat and approved by the District. The Water Mains serving the subdivision shall be paid for
and constructed by the Developer, according to the District's Standards and Specifications.
Fire flows shall be field verified and approved by the Windsor-Severance Fire District and/or Developer's Engineer
after construction of waterline infrastructure.
When the Developer is ready to proceed,the District and the Developer will enter into a legal Water Service
Agreement.
If you have any questions,you can contact me at the office(970)356-3020.
Alan Overton
North Weld County Water District
^tbdivisions\ MBM-AnthonyBrighamlIntent(I I-29-04).doc
3351 Eastbrook Drive
Fort Collins,Colorado 80525
ride the light
QWEST Qwe, st
3351 Eastbrook Dr.
Fort Collins,CO. 80525
Date: August 01,2005
Subject: Service to Sierra Acres PUD
Anthony Bingham
6425 Clearwater Dr.
Loveland, Co. 80538
Attn: Anthony Bingham
QWEST Communications will provide service to your planned development, Sierra
Acres PUD,located east of the town of Windsor.Provisioning the service will be in
accordance with the rates and tariffs on file with Colorado Public Utilities Commission.
The owner is responsible for provision of all trench,conduit,ditch crossings,and street
crossings for communication facilities within the project. Contact the Qwest engineer for
specifications for the main communications cable.
If there are any further questions,or if I can provide any assistance,please contact me on
970 377-6403.
Very Truly Yours.
•