Loading...
HomeMy WebLinkAbout20051412.tiff December 17, 2004 (Ella Harvey Markham EARTH ENGINEERING 650 Highway 56 COMPANY, INC. Berthoud, Colorado 80513 Re: Percolation Test Results Markham P.U.D. —2 Percolation Test Sites Weld County, Colorado EEC Project No. 04-01-330 Mr. Markham: On December 14, 15 and 16, 2004, Earth Engineering Company, Inc. (EEC) personnel completed the percolation testing at the two sites you requested for the above referenced project. To complete the site percolation testing, EEC personnel advanced one (1) soil profile boring to a depth of approximately 8 feet below present site grade and completed six (6) 6-inch nominal diameter percolation test holes to depths of approximately 3 feet at each site. After the percolation test holes had presoaked for approximately 24 hours, EEC personnel returned to the site to perform the percolation test in the shallow boreholes. The results of the percolation testing and logs of the 8 feet deep borings are included with this report. The materials encountered in the profile boring at the percolation test site #1 located on Lot 2 generally consisted of brown sandy lean clay. The materials encountered in the profile boring at the percolation test site #2 located on Lot 4 generally consisted of brown to light brown sandy lean clay along with an increasing amount of sand at a depth of approximately 4 feet below present site grades. At the time of drilling and approximately 48 hours after drilling, no groundwater was observed in the test borings. The percolation tests performed indicated an average percolation rate of approximately 83.3 minutes per inch at the percolation site #1 (Lot 2) and an average percolation rate of approximately 22.2 minutes per inch at the percolation site #2 (Lot 4). Weld County Health Department regulations require a percolation rate between 5 and 60 minutes per inch to use a conventional absorption system. Weld County standards also require that neither groundwater nor bedrock be encountered within 6 feet below ground surface in P.O. Box 271428 P.O. Box 49322 FORT COLLINS, COLORADO 80527-1428 COLORADO SPRINGS, COLORADO 80949-9322 (970) 224-1522 (FAx) 224-4564 (719) 442-6813 (FAx) 447-9635 2005-1412 Earth Engineering Company,Inc. '0"--, EEC Project No.04-01-330 December 17,2004 Page 2 order to use a conventional absorption field. Based on our measured percolation rates and on our observations of the profile borings, the areas tested appeared to meet the County requirements for a conventional septic system at percolation test area #2 (Lot 4). However, based upon our measured percolation rates at percolation test area #1 (Lot 2), an engineered system would be required for the lot. A combined evapotranspiration/absorption ISDS could be considered for this lot. Weld County guidelines for proximity to natural and manmade site features should be addressed when siting the absorption fields. We appreciate the opportunity to be of service to you in this project. If you have any questions regarding this report, or if we can be of further service to you in any way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company,Inc. ....: 00 REGAsr•.. • i I 35724 ! • c . Michael J. Coley, P.E. Principal Engineer .p 1 STATE HIGHWAY 56 N A H- Not To Scale LOT 0 LOT 1 v Q PERCOLATION TEST AREA #1 RESULTS # 1-- 40 MIN/INCH # 2-- 120 MIN/INCH # 3-- 80 MIN/INCH PERC&ATgl TEST AREA n # 4-- 60 MIN/INCH * * # 5-- 120 MIN/INCH LOT 6 B-1 # 6-- 80 MIN/INCH -$ AVERAGE-- 83.3 MIN/INCH t t PERCOLATION TEST AREA #2 RESULTS I \ LOT 2 # 1-- 24 MIN/INCH \ # 2-- 24 MIN/INCH axart SLOPE # 3-- 24 MIN/INCH # 4-- 14.1 MIN/INCH # 5-- 30 MIN/INCH LOT 5 # 6-- 17.1 MIN/INCH AVERAGE-- 22.2 MIN/INCH SLIGHT WE PERCOLATOR TEST AREA/! *3 *_ *I LOT 3 8-24 *. *s *E LOT 4 LEGEND B-1 BORING LOCATION SITE PHOTOS FtlloS TAAEH FRoso APPROximAlt SAMOA LOCATML IN DI EC1OI CC ARAM/ BORING LOCATION DIAGRAM MARKHAM P.U.D. WELD COUNTY, COLORADO PROJECT NUMBER: 04-01 -330 DATE: DECEMBER 2004 EARTH ENGINEERING COMPANY 4 fii�11,0f$04.4 b X cgIty' 0J ➢T PHOTO # 1 d ` s r s PHOTO # 2 MARKHAM P.U.D. rte.. WELD COUNTY,COLORADO EEC PROJECT No.04-01-330 I, EEC DECEMBER 2004 MARKHAM P.U.D. WELD COUNTY,COLORADO PROJECT NO: 04-01-330 DATE: DECEMBER 2004 LOG OF BORING&1(PERC TEST AREA#1) RIG TYPE: CME48 SHEET 1 OF 1 WATER DEPTH FOREMAN: SM START DATE 12/14/2004 WHILE DRILLING None AUGER TYPE: 4"CFA FINISH DATE 12/14/2004 AFTER DRILLING None SPT HAMMER: AUTO SURFACE ELEV N/A 48 HOURS None SOIL DESCRIPTION D N oU MC OD A.LWITS -200 SWELL TVP! (FEET) (BLOWSIFT) inn f%1 IPOFI LL PI (%) PRESSURE %G EW PSF 3"TOPSOIL AND VEGETATION _ _ 1 SANDY LEAN CLAY(CL) _ _ brown 2 silty _ _ 3 4 _$ 6 with a trace amount of gravel 7 -8 8'BOTTOM OF BORING _ _ 9 1-0 "/dva., 11 1-2 1-3 1-4 1-8 18 1-7 18 1-9 2-0 2-1 2-2 23 2-4 25 Earth Engineering Company MARKHAM P.U.D. WELD COUNTY,COLORADO PROJECT NO: 04-01.330 DATE: DECEMBER2004 e"" LOG OF BORING B-2(PERC TEST AREA#2) RIG TYPE: CME4S SHEET 1 OF 1 WATER DEPTH FOREMAN: SM START DATE 12114/2004 WHILE DRILLING None AUGER TYPE: 4"CFA FINISH DATE 12/14/2004 AFTER DRILLING None SPT HAMMER: AUTO SURFACE ELEV N/A 48 HOURS None SOIL DESCRIPTION D N OU MC DD A40MITS .200 SWELL 11F—PE (FEET) SBLOWSIFT) (PEW) 1%) (PCn LL R 1%1 PRESSURE %n 100 PS2 3"TOPSOIL AND VEGETATION - - 1 SANDY LEAN CLAY(CL) _ _ brown 2 silty — _ 3 sandy to very sandy 4 S light brown 6 _7 8 B BOTTOM OF BORING _ _ 9 1-0 r 1-1 1-2 1-3 1-4 1-5 18 1-7 16 1-9 2-0 2-1 2-2 2-3 24 1✓.� _ 25 Earth Engineering Company Hello