Loading...
HomeMy WebLinkAbout20053530.tiff STATE OF COLORADO Weld County Planning Department COLORADO GEOLOGICAL SURVEY GREELEY OFFICE pen Department of Natural Resources JAN 2 9 2004 E-MAILED 1313 Sherman Street, Room 715 Den RECEIVED Denver,Colorado 80203 1 2G OA- Phone 303.866.2611 Fax 303.866.2461 DEPARTMENT OF NATURAL RESOURCES January 23, 2004 Bill Owens Governor Russell George Jaqueline Hatch Executive Director Weld County Department of Planning Services Legal Description: Ron cottony NW'/4 of Cl,T2N,12.67W Division Director 1555 N. 17"'Avenue of the 6th P.M. Ron Cattany Greeley, CO 80631 Acting State Geologis and Director Subject: Review of Moorea Manor North P.U.D. Sketch Plan Case No.PK-1048,Weld County,CO; CGS Unique No. WE-04-0016 Dear Ms. Hatch: Colorado Geological Survey has completed its review of the above-referenced project. We reviewed the parcel immediately south of this site, Moorea Manor, on October 9, 2001 (WE-02-0021)and on March 5, 2003 (WE-03-0029). I understand the applicant proposes to subdivide this 45.2-acre parcel into eight residential lots of approximately 4.4 to 7.7 acres each. Individual sewage disposal systems (ISDS)are planned for each of the eight new lots, and the applicant states that domestic water service will be provided by Central Weld Water County District. I have several comments regarding the proposed development. 1. Soils and bedrock. With this referral, I received an Engineering Geology Report prepared by Church and Associates, Inc., dated November 26,2002. This report describes the results of a geotechnical investigation consisting of three soil test borings and limited laboratory testing. Church's test results indicate that the subsurface soils consist of silty, clayey eolian(wind-deposited) sands and sandy clays exhibiting moderate strength characteristics. The underlying bedrock consists of Laramie Formation claystone and sandy shale, and exhibited low to moderate swell potential and high bearing capacity. A sample of eolian sand from one of the test borings exhibited minor collapse under pressure when wetted. Considering the potentially hydrocompactive soils and expansive bedrock present at this site, it is very important that site-specific maximum bearing and minimum dead-load pressures are determined and incorporated into individual foundation and footing designs. Church's report contains appropriate recommendations for additional, site-specific geotechnical investigations to determine soil strengths, swell potential and groundwater levels, and to provide specific recommendations for structural design. This will help minimize the risk of foundation damage due to differential settlement and heave. Additional foundation damage due to compaction and differential settlement can occur if water infiltrates the soils adjacent to and beneath the foundation as a result of, for example, residential irrigation. Proper grading, compaction and drainage must be incorporated into the development plans. I agree with Church(page 4)that, based on limitations discussed in the Soil Conservation Service Soil Survey, excavations into some of the onsite sands, especially those on the northern portions of lots 1 through 4, may create unstable slopes which could cave. Care will need to be taken during construction to minimize the heights of cuts and the duration that cuts are left open and unsupported. Shoring may be required. C:\Carlson LURs\Weld Moorea Manor North.doc 5:10 PM,01/26/2004 2005-3530 Jaqueline Hatch January 23, 2004 Page 2 of 2 2. Groundwater. According to the Soil Survey, the surficial soils underlying most of proposed lots 5 and 8 present severe limitations for construction of dwellings due to wetness and possible flooding. Groundwater was encountered in a test boring on proposed lot 4 at a depth of only 7.3 feet below the ground surface. Full-depth basements may not be feasible on all lots, and should not be considered for lots 3, 4, 5 and 8 unless more detailed, site-specific information is obtained about local and seasonal depths to groundwater. Groundwater levels may rise seasonally, and perched water is likely to form above clayey, less permeable soil layers and on top of the bedrock surface as a result of irrigation and infiltration from ISDS. We recommend that individual perimeter foundation drain systems be constructed to help prevent infiltration of perched water(if basements are planned), and to help control wetting of potentially collapsible or expansive soils in the immediate vicinity of the substructure. It is critical that the perimeter drains, if constructed, are sloped to discharge to an interior pumped sump or a gravity outlet that discharges water as far as possible away from all structures. 3. Drainage. With this referral,we received a Drainage Report(TEAM Engineering,March 2003). According to the drainage rerport, two detention ponds will be needed,one for lots 6 and 7, and one for lots 1-5 and lot 8. The dimensions,volumes, locations, intake channels and outfalls of these detention ponds are not shown on the Sketch Plan drawings or in the Drainage Report. 4. Oil/gas wells. Three oil/gas wells are present on the property,and several tanks and separators exist both on and adjacent to this property. Building envelopes on lots 1,2,3,4, 5 and 7 should be delineated to specifically exclude all property within the required setback radius from oil and gas wells and related facilities. Prospective residents should be advised and a plat note should be included informing buyers that the oil/gas wells and related equipment may be loud,may pose a visual nuisance, and will require ongoing servicing,maintenance and access via local roads. All wells,pumps,processing facilities and tank batteries within the residential development should be fenced and locked, with warning signs posted to protect residents from hazards associated with the machinery and possibly tainted soils. 5. ISDS. The Weld County Soil Survey describes the soil units present over most of the new planned lots as having slight limitations for septic systems, except in the area surrounding the Lupton Bottom Ditch. The soils within this area have severe limitations for septic systems due to saturated soils. Church describes the results of four preliminary percolation tests in their Preliminary Percolation Test Report, dated November 27, 2002. Tests were performed only on proposed lots 1 and 6, and results ranged from 27 to 80 minutes per inch. For all lots, individual percolation tests will be needed to design ISDSs, and the area surrounding the ditch should be avoided. We would like to review this project again at preliminary or final plat to verify that building envelopes comply with oil&gas facility setback requirements,and to verify that detention ponds and drainage channels have been correctly sized and located. Thank you for the opportunity to review and comment on this project. If you have questions or need clarification of issues identified during this review,please call me at (303) 866-2001, or e-mail jill.carlson@state.co.us. Sincerely,A-10)-%__, J 1 Carlson, C.E.G. Engineering Geologist C:\Carlson LUPO/Veld Moorea Manor North.doc 5:10 PM,01/26/2004 Hello