Loading...
HomeMy WebLinkAbout20071115.tiff EVIDENCE OF ADEQUATE SEWAGE DISPOSAL There are no sanitary sewer facilities planned for this operation. Lafarge will use portable restrooms near the working face. Lafarge will apply for an ISDS permit for the office and batch plant area in conjunction with their building permit application for the office and plant site area. Attached is the design for the ISDS which Lafarge is proposing. Lafarge West.Inc..-Riverhead Weld County USR Permit Page 25 of 42 2007-1115 r FILE CONTAINS OVERSIZED ON-SITE WASTEWATER SYSTEM PLAT SEE ORIGINAL IN FILE STATEMENT OF ADEQUATE WATER SUPPLY Domestic water will be provided with bottled water at the working face. An application for a commercial well permit will be filed for the office and batch plants with the State Engineer's Office. Please refer to Exhibit G in the attached DMG Application for additional information about water supply to the Riverbend site. Lafarge West,Inc..-Riverbend Weld County USR Permit Page 24 of 42 Hello