HomeMy WebLinkAbout20051599 t71r 19l audt, 1E: '319 W+lr- c 99: h;r_w,IH 4aIEl, FAr¢ ^___cal
SOARD OF DIRECTORS NORTH WELD COUNTY WATER DISTRICT
33247 HIGHWAY as • I I ICPaNE.CO COMB
CHARLES ACHZIGER
RALPH PRIOR DON POSSELT,DISTRICT MANAGER
JOHN JOHNSON
CS DUCK RINEHART "a' PO.BOX 5e • PHONE (970)350.3020 FAX(g70)395.0997
NELS NELSON
wwwnwcwd MO • e-teal: water(glnwcwd•org
January 19,260
RE'Meter Number 921 002 Address:42824 wCR 43,Ault,CO Owner: LA., LLC Parcel: 055134200002
To Whom It May Concern:
North Weld County Water District provides domestic water service to the properly looaxa at 42824 WCR 43,
Greeley,CO. The Current owner of the property is L.A., LLC.The current service provides a standard meter,which
should adequately provide the proposed second home on the same parcel of land. North Weld County Water District
does not object to the placement of the second home served by one tap. The current Water Allocation Class Is 1
(228,000 gallons)and the Current Plant investment Gass Is 1 (228,000 gallons)
Water tap/service is pieced on the physical property, defined by a legal description. In case of a Recorded
Exemption,the water tap shah only serve the parcel that the water tap is located on. Service ehall NOT Cross the legal
description of one parcel to serve the other parcel, unless an easement has been recorded for the water service end has
been approved by the District,
The District requests that for any County Process, including but not limited to a Recorded Exemption (RE),
Subdivision Exemption(SE), Use by Special Review(USR), Planned Unit Development(PUP),Minor Subdivision or Off-
Site Construction Plans within Weld or Larlmer County that the respective County place North Weld County Water District
on the referral Met, Furthermore,the District requests Chet the applicant submit the plat to North Weld County Water
District for review prior to submitting the plot to the County for filing. The District may need additional waterline
easement(s)or wa anon improvements to provide service to the percale being created or modified. If the plat is recorded
without District approval,additional easements may have to be recorded end/or additional waterline Improvement,will
need to be constructed In order to maintain or establish new water service(s),
The District guarantees treatment and delivery of water purchased. Ali water that is delivered with surcharge
is subject to water availability, Water purchased through the District shall be 70% delivery of an Acre-Foot of water
(228,000(allons), If the allotment for Colorado-Blg Thompson(CDT)project water,which is determined by the Northern
Colorado Water Conservancy District, is bC%or greeter. North Weld County Water District will restrict the delivery es
necessary when the CST allotment is less then 60%. A portion of the Raw Water Fee is utilized by the District to
construct storage reservoirs.
The Plant Investment Fee pays for the III frastruttre required to deliver 1 AFU (228.000 gallons). if usage
exceeds the number of Plant Investments that were purchased, an edditionsi Plant Investment Surcharge will be applied
to your account. Plant investments may be purchased to increase the amount of water to be delivered and avoid the
Plant Investment Surcharge. Refer to table below for current Plant Investment Surcharge schedule.
Water Surcharc4
Surcharge will be assessed when an eccou nes yew to date usage exceeds their annual allotment Currently surcharge is
$0.10 per 1,000 gallons. This fee is to recover the District's coat to obte'n additional water rights for delivery. All water
that is delivered with surcharge is subject to water availability.
Plant investment Surcharges
When en account's year to date usage exceeds their Plant Investment Allotment(7t of Equivalent Taps x 228,000 gallons),
a surcharge will he assessed, The transfer of additional water will not remove this charge, Additional Plant Investments
must be purchased to increase the allotment end reduce the Plant Investment Surcharges.
0 to 456,000 gallons above the Plant Investment Allotment (228,000 gallons) $3.15 per 1,000 gallon
More than 466,000 gallons above the Plant investment Allotment $1.30per 1,000 gallons
Sincerely,
Alan Overton
District Engineer