Loading...
HomeMy WebLinkAbout20051253 Weld County Health Department 12/10/2004 Percolation Test and Soils Data High Plains Engineering `� --, 4-1N. 735 Denver Avenue • Fort Lupton CO 80821 Phone 303-857-9280 • Fax 303-857-9238 =1 04 4336 Prop Ry A; 13091 WCR 40, WELD COUNTY, CO LegaDeferrption Property Owner Info Name CONQUEST OIL Street 1610-29TH AVENUE PLACE, #200 City, State,Zip GREELEY, CO 80634 Phone 970-381-5005 Smeared Surfaces Encountered at IGREATER THAN 8 Ifeet Removed: YES Sand or Gravel Added NO Estimated depth to maximum seasonal water table if not Date and Time 12/7/2004 date encountered in profile: Presoak Water Added: 11:00 time Amount of Presoak Is area believed to be subject to Water Added: 15 gallons seasonal fluctuations which could Date and lime result in a seasonal water table within Percolation Test 12/8/2004 date 8'of !face? Started: 11:30 time 1 A; II' , ' Did Water Remain in Hole After the Overnight 0.5 % Swelling Period? to the NORTHEAST direction Hole 1 NO Hole 2 NO Hole 3 NO Encountered @ [GREATER THAN 8 !feet J Hole 4 NO Hole 5 NO Estimated depth if not encountered in Hole 6 NO profile: PerCoIaERJat Hole 1 36 20.83 Type of Bedrock:j Hole 2 36 13.89 Hole 3 36 13.89 Hole 4 36 27.78 Is bedrock fractured or weathered? Hole 5 36 11.90 Hole 6 36 10.42 Is bedrock believed to be permeable Average 1 16.5 (perc rate<60 min/in)? 2005-1253 • Weld County Health Department 12/10/2004 Percolation Test and Soils Data /Pro0ile H t trrnation( o t.) I� Note: Soils must be classified using unified system ASTM D2487 IRMO**Hole Lott 0 - 1 • SANDY CLAY(SC) 2 • SANDY SILT(SM) A - a 3 L - a 4 m - 5 WELL GRADED SANDY SILT(SW-SM) - 6 7 ---8 • - 9 10 IC40311(000 I certify that the above information is correct and complete to the best of my knowledge and that all tests were performed in the accordance with the provisions of Weld County Health Department individual sewage disposal regulations by myself or under my supervision. via High Plains Engineering Signature (c7,`" 735 Denver Avenue u7 8 Ft. Lupton, CO 80621 3.142 a.-�' 303-857-9280 Date SITE, i MAP 1309 I WCR 40 WELD COUNTY, CO I GO' fi,\ C H O o h\�\ • • • X \ i • • • y 215' ile O EXISTING HOUSE--I m n w C C \ Q TO HIGHWAY GO WCR 40 '.GEND • Percolation holes X Percolation Profile Hole A Soil Profile hole Applicant: SW4 29-4-66 Harmer: Case Number: H N I "7 1 30/ 11 -\ 46 i, /\ f_____ ____) 71 WCR 2, I 8 /‘ ri 2. i ----_,,, - I i 29 30 �� /1 ( / WCR 40 i 7 ) / / - �\,. Legend Property Boundary' Lakes A _ _ Highways L.- Soil Types Major roads ---t—-.— Rail Road - -- Local roads Floodplains r. N Streams&Ditches * Boundaries are estimated West Greeley CL,..ervation District ) . (970) 356-8097 . Case Number: __ _ — Applicant: __ Planner: j Below is a list of the soils and their limitations according to the USDA, Weld County Soil Survey. I I I - Small Septic Tank,Prime Farm Map Soil Name Soil Texture Shallow Dwellings Dwellings with'Commercial Absorption Land (if Additional Symbol Excavations without basements Comments Buildings Fields irrigated) basements 29 Julesburg Sandy Loam •S;iubt - Slight lYes 30.Julesburg ;Sandy Loam Slight Slight Yes _ t . i I I • The West Greeley Conservation District recommends that the applicant does an on site soils test prior to any construction. For a more complete soils description consult the Weld County Soil Survey or contact our office at (970) 356-8097. If you or the applicant have any questions please feel free to call our office. ) Produced by the West Greeley Conservation District �_. High Plains Engineering • �` I 735 Denver Avenue • Fort Lupton CO 8062 Phone 303-857-9280 • Fax 303-857-9238 SUBSURFACE INVESTIGATION AND FOUNDATION RECOMMENDATIONS Prepared For Conquest Oil 1610 — 291 Avenue Place, #200 Greeley, CO 80634 Job Site Located At: 13091 WCR 40 Weld County, CO December 10, 2004 JOB #044336 OskpDu eRe so > colic • x.4§§ Todd M. Schroeder P.E =,48i4&/ sJpNAI EHG` . AGREEMENT Or PURPOSE AND DISCLAIMER: The parties specifically agree and contract that the purpose of the provided subsurface investigation is to test, analyze, and provide geotechnical recommendations for the proposed building and/or residence. This report presents a description of subsurface conditions encountered at the site, recommended foundation system, and design and construction criteria influenced by the subsurface conditions. The opinions and recommendations presented in this report are based on the data generated during this field exploration, laboratory testing, and our experience. A foundation design sealed by a Professional Engineer is required to obtain a building permit but is not included in this report. The parties specifically agree that High Plains Engineering has not been retained nor will they render an opinion concerning environmental issues, hazardous waste or any other known and or unknown conditions that may be present on the job site, since this is not our area of expertise. LOCATION AND SITE CONDITIONS: This report represents the results of the data obtained during the subsoil investigation for the proposed pump house at 13091 WCR 40, Weld County, CO. The proposed building site is presently a vacant lot with an existing home. The site is reasonably level with approximate slopes of 0.5% to the Northeast. The lot appears to be well drained with no erosion evident. The depths of foundation construction are anticipated to range from one (1) to three (3) feet below grades that existed at the time of this investigation. It is anticipated that final grades may be adjusted to accommodate drainage and construction depths. It is recommended that we review the final grading plan to determine if any revisions to the recommendations presented in this report are necessary. SUBSOIL CONDITIONS: Two, four inch diameter holes were drilled to a depth of twenty five feet at the building site on December 7, 2004, as shown on the attached site map. Samples of the soil were taken at two-foot intervals. These samples were analyzed in the field and laboratory to determine the characteristics of the soil (per Unified Soil Classification System) for identification and foundation design. In general, the soil profiles in test holes #1 & #2 indicated Sandy Clay (SC) to a depth of 2 feet, underlain by Well Graded Sandy Silt (SW-SM) to a depth of 7 feet. Well Graded Sand (SW) exists from 7 feet to 16 feet, and finally, Poorly Graded Sand (SP) exists from 16 feet to a depth of 25 feet. The Standard Penetration Test similar to ASTM D1586 showed 10 blows for 12-inch HPE 3 Job#04-4336 1 of 8 penetration at a dep„ 1 of 4 feet, and 14 blows for a 12m, ,ch penetration at a depth of 9 feet. Please note that actual subsurface soil conditions may vary between samples and locations tested. One-dimensional swell/consolidation tests were not performed on selected samples to evaluate the expansive, compressive and collapsing nature of the soils and/or bedrock strata due to the amount of gravel in the soil. The soils in this report were classified using the American Society of Testing Materials (ASTM) procedures. The geotechnical practice in State of Colorado utilizes a relative scale to evaluate swelling (expansion) potentials. When a sample is wetted under a surcharge pressure of 500 pounds per square foot (psf), the measured swell is classified as low, moderate, high, or very high. The following table represents the relative classification criteria. Please note that the measured swell is not the only criteria for slab-on-grade recommendations and additional factors are considered by the engineer when evaluating the risk for slab-on-grade construction. TABLE 1 SLAB PERFORMANCE REPRESENTATIVE RISK CATEGORY PERCENT SWELL (500 PSF SURCHARGE) LOW 0 TO <3 MODERATE 3 TO<5 HIGH 5 TO <8 VERY HIGH >8 Source:Colorado Association of Geotechnical Engineers, Guideline for Slab Performance Risk Evaluation and Residential Basement Floor System Recommendations (Denver Metropolitan Area), 1996 GROUNDWATER: Groundwater levels were not recorded at the time of our field investigation; however, it may be possible for groundwater to exist at construction depths at a later date. The groundwater can be expected to fluctuate throughout the year depending on variations in precipitation, surface drainage and irrigation on the site. The possible presence of shallow bedrock/dense clays beneath the surface is favorable for the formation of "perched" groundwater. We recommend that the bottom of the basement or crawispace excavations be maintained at least 4 feet above the free groundwater level. The ground water levels recorded represent the free, static water levels after equalization of hydrostatic pressures in the test hole borings. It is possible that the groundwater levels recorded in the test hole borings may not be present at those levels in the foundation excavations. Flow rates, seepage paths, hydrostatic pressures, HPE 3 Job#04-4336 2 of 8 seasonal groundwai r fluctuations, water quality u, dd other factors were not determined in this investigation. A program, which may include special well construction, test procedures, long-term monitoring program and analysis would be necessary to determine these factors. FOUNDATION RECOMMENDATIONS: The Well Graded Sandy Silt (SW-SM) material has a bearing strength of 1500 pounds per square foot (psf) and an equivalent liquid pressure of 35 psf. We recommend the use of a continuous spread footing, due to the low expansion-consolidation potential of the analyzed soils. The foundation must be constructed at the location in which soils investigation was performed. All loose and disturbed soil shall be removed before placing of the concrete for the foundation. The bottom of the foundation shall be a minimum of 30" below final grade (or that required by local jurisdiction; whichever is greater) for frost protection. Soil settlement resulting from the assumed structural loads is estimated to be one inch or less. Soil expansion at this site may be up to one inch in some areas. No foundation wall is to exceed twenty-five feet in length without utilizing buttresses or counterforts unless otherwise designed by the foundation engineer. Engineered steel reinforcements shall be required in the footings and foundation walls. This will give walls or footing beams the strength to span or bridge over any loose or soft pockets of soil that may develop during construction. Owners shall be made aware of all contents of this report, and the fact that water accumulation around foundation elements is the primary cause of distressed foundations. To help prevent secondary damage that could be caused by slab movement, the following construction techniques are additional recommendations for the foundation construction. SLAB ON GRADE CONSTRUCTION: 1. When and where slabs-on-grade are chosen and the owners are willing to accept the risks associated with slab movement, the following recommendations are to be followed: HPE 3 Job#04-4335 3 of 8 a.) Slabs shouk. oe constructed as "free floating . Positive separations and/or isolation joints should be provided between slabs and all foundation walls, bearing members (columns), plumbing and utility lines. Isolation may be achieved with 1/2 inch expansion material or by sleeving. Vertical movement of the slabs should not be restricted. b.) Eliminate plumbing under slabs where feasible. Where such plumbing is unavoidable, it should be thoroughly pressure tested during construction. c.) Place the slab directly on the undisturbed natural soils, or properly compacted fill soil. Floor slabs and footings should not be constructed on frozen sub grade. Slabs should be reinforced with rebar, wire mesh or fiber mesh to help control crack separation. 2. Provide frequent scoring of the slabs to provide joints for controlled cracking of the slab. Control joints should be placed to provide approximate slab areas of 150 square feet, with a maximum dimension of thirteen feet between joints. The depth of sawed control joints should be 1/4 of the slab thickness. Install a good quality sealant in these joints to prevent surface discharges of liquid from penetrating slab sub grades. 3. The soils that will support the concrete slabs should be kept moist during construction by occasional sprinkling of water. The soils should be moistened to +/- 2%optimum moisture within 48 hours of pouring the slabs. This procedure will help maintain the moisture content of the underlying soil. **Heavy watering or pooling of any kind next to the foundation or within the backfilled area is not recommended.** 4. A minimum void or clear space of 3 inches should be provided at or near the bottom of all non-bearing partitions. In finished room areas, all drywall and paneling should be stopped approximately 3 inches above the top of the slab. This will allow some space for upward movement of the slab before pressures are applied to the wall and upper levels of the structure. The builder should provide a ''A inch space at the bottom of all doorjambs to allow for limited movement of the floor slab. The owner is hereby notified that it is their responsibility to maintain these void spaces. 5. If a forced air heating system is used and the furnace is located on the slab, we recommend provision of a collapsible connection between the furnace and the ductwork. In the event a hot water heating system is used, the piping should not be placed beneath the concrete slab. HPE 3 Job#04-4336 4 of 8 BACICFILL AND SURFACE DRAINAGE: The foundation and retaining walls must be well cured and well braced prior to bacidliling. Any soil disturbed adjacent to bearing foundation components are to be re- compacted to a minimum of 85% Standard Proctor Density (ASTM D698). Backfill that bears concrete slabs shall be compacted to 95% Standard Proctor Density (ASTM D698). Mechanical compaction methods shall be utilized, (water-flooding techniques are strictly prohibited). See Compaction Section for more information regarding compaction requirements and techniques. Proper drainage away from the foundation walls shall be provided. The owners are advised to immediately fill any settled areas to eliminate water accumulation near the foundation. A minimum slope of 12 inches in the first 10 feet from the perimeter of the building is recommended. Roof downspouts and sill cocks should discharge into long concrete splash blocks (5 feet long min.) or into gutter extensions to deposit runoff water beyond the limits of the backfill soil near the foundation walls. Plastic membranes should not be used to cover the ground surface immediately surrounding the structure; geotextile fabric should be utilized for weed control. Any drainage water from uphill shall be diverted around the structure. Sprinkling systems should not be installed or direct water to be within 10 feet of the foundation. The owner/builder is also advised that irrigation lines can leak and/or break, resulting in release of excessive amounts of water near the foundation. This can cause damage to slabs and foundation walls. WATER ACCUMULATION AROUND FOUNDATION ELEMENTS IS THE MAIN CAUSE OF DISTRESSED FOUNDATIONS. COMPACTION: Placing Fill: No brush, sod, frozen material, perishable material, unsuitable material, or stones of four inches or greater in maximum dimension shall be placed in the fill. The distribution of the material on the fill shall be such as to avoid the formation of layers of materials differing substantially in characteristics from the surrounding materials. The materials are to be delivered to the backfill surface at a uniform rate, and in such quantity as to permit a satisfactory construction procedure. Unnecessary concentration of backfill machinery travel tending to cause ruts and other hollows more than six inches in depth, are to be re-graded and compacted. After dumping of fill material on the backfill surface, the material is to be spread by approved methods in approximately 6 inches compacted thickness. HPE 3 Job#04-4336 5 of 8 Moisture Control: The .naterial in each layer shall be c„.npacted by rolling and shall contain the optimum moisture required for maximum compaction, as nearly practicable and as determined by the soils engineer. The moisture content shall be uniform throughout all layers. If in the opinion of the soils engineer it is not possible to obtain moisture content by adding water on the fill surface, the contractor may be required to add the necessary moisture to backfill material in the borrow area. Compaction: When the moisture condition and content of each spread layer is satisfactory, it shall be compacted by a method approved by the soils engineer to 95% ASTM D698 (Standard Proctor Density) for slab areas, and 98% ASTM D698 for footing and/or pad areas. A Standard Proctor test is to be performed for each typical fill material and frequent tests of the density of the fill must be taken. In general, to compact cohesion-less free-draining materials, the above guidelines also apply. When compacting cohesion-less free-draining materials such as gravel and sand, the materials shall be deposited in layers and compacted by treads of a crawler type tractor, surface of internal vibrators, pneumatic or smooth rollers, power or hand tampers, or by any other means approved by the soils engineer. The thickness of the horizontal layers after compaction is not to exceed 6 inches compacted thickness if compaction is performed by tractor treads, surface vibrators or similar equipment, or not more than penetrating length of the vibrator head if compaction is performed by internal vibrators. When the moisture content and condition of each spread layer is satisfactory, it shall be compacted by a method approved by the soils engineer to 95% ASTM D1557 (Modified Proctor Density) for slab areas, and 98% ASTM D1557 for footing and/or pad areas. RADON: Most counties in Colorado have average radon levels (measured in home) above the U.S. EPA recommended "action level" of 4 picocuries per liter of air (pCi/1). Results of a 1987-1988 EPA-supported radon study for Colorado indicated that granite rocks, in particular, generally have elevated levels of uranium. These rocks have the potential of producing higher than average levels of radon gas in the home. Increasing ventilation of basements and crawl spaces and sealing of joints can mitigate build-ups of radon gas. This mitigation is best implemented during the design and construction phases of residences. The Colorado Geologic Survey {www.dnr.state.co.us/geosurvey} and the U.S. EPA {www.epa.gov/iaq/radon} are both good sources for additional radon information. HPE 3 Job#04-4336 6 of 8 CONSTRUCTION DETAILS - GENERAL COivIMENTS: In any soil investigation, it is necessary to assume that the subsurface soil conditions do ^ not vary greatly from the conditions encountered in the field and laboratory testing. The accompanying design is presented using best professional judgment based on the limits of the extent of testing commissioned by the client. Our experience has been that at times, soil conditions do change and variations do occur. These may become first apparent at the time of excavation for the foundation system. **If soils conditions are encountered which appear different from the test borings as presented in this report, it is required that this office be called to make an observation of the open excavation prior to placing the footings. The cost of this observation is not part of this report.** This project should be constructed by a qualified contractor with experience in similar projects. The owner/builder is advised to observe and document the construction process to ensure the construction is performed in accordance with the design drawings and technical specifications. This report does not address general hillside stability, landslide potential, and/or other natural hazards. Several areas in the Colorado Front Range have known geologic hazards associated with them. We recommend that readers of this report educate themselves further as to the existence of geologic hazards on or around their specific property of interest. The Colorado Geologic Survey {www.dnr.state.co.us/geosurvey or 303-866-2611} is a good source for publications (maps, reports, etc.) dealing with specific geologic issues and/or issues related to specific geographic areas. The foundation and retaining walls must be well cured and well braced prior to bacidilling. HPE 3 Job#04-4336 7 of 8 DISCLAIMER: We do not guarantee the performance of the project in any respect, but only that our engineering work and judgments rendered meet the standard care of our profession. The presence of underground workings (e.g. coal mines) and subsidence potential from any workings was not part of this investigation. The owner should contact the State and County agencies to determine if mining has been conducted in the area and if any precautions are recommended. THE PARTIES SPECIFICALLY AGREE THAT HIGH PLAINS ENGINEERING, INC. HAS NOT BEEN RETAINED NOR WILL THEY RENDER AN OPINION CONCERNING ANY ENVIRONMENTAL ISSUES, HAZARDOUS WASTE OR ANY OTHER KNOWN OR UNKNOWN CONDITIONS THAT MAY BE PRESENT ON SITE. DUE TO CHANGING TECHNOLOGY, BUILDING CODES AND CITY/COUNTY REQUIREMENTS, THIS SOIL REPORT MUST BE USED WITHIN ONE YEAR OF THE DATE ON THE FRONT OF THE REPORT OR MUST BE REVISED. HPE 3 Job#04-4336 8 of 8 • SANDY CLAY(SC) 2 3 Blowcounts 10/12 4 WELL GRADED SANDY SILT (5W-SM) 5 C 7 /5/ 8 Blowcounts 14/12 / % 9 10 WELL GRADED SAND (SW) 12 // 13 // 14 15 17 18 19 20 POORLY GRADED SAND (SF') 21 22 23 24 25 SOIL PROFILE r High ngineerin 735 Denver Avenue * Iro t Lupton CO 8062- I Phone 303-857-9280 f-ax 303-857-9238 FOUNDATION GRADING DETAIL 5' MIN. L. DECORATIVE GRAVEL OR STONE AREA •-. �:�����. =1-II�I� . GRADE co METAL OR WOOD EDGE FOUNDATION WALL W/ I/z' SPACE AT BOTTOM TO ALLOW FOR T 11E RELEASE OF WATER GEOTEXTILE FABRIC NOTE I . PROVIDE �AMINIMUM SLOPE OF 12 IN THE FIRST I 0-0 FROM FOUNDATION ( I 0%) 2. DOWNSPOUTS AND EXTENSIONS SHOULD EXTEND BEYOND THE GRAVEL OR STONE AREA . , S. SITE MAP 1309 I WCR 40 WELD COUNTY, CO I GO' ,( U I— O E co O\-1• • • \ � l • • • 215' O EXISTING HOUSE -I m n U) in U O \ Q TO HIGHWAY GO WCR 40 '- GEND vir Percolation holes X Percolation Profile hole A Soil Profile hole Hello