Loading...
HomeMy WebLinkAbout20020991.tiff • hi& January 18, 2002 JIM SELL DESIGN LanAoap:.L,Gilruure. Mr. Don Carroll Phi iv„im:i,m!(-1'enmdel Plnnnlaa Weld County Public Works Department 1111 H Street Box 758 Greeley, Colorado 80632-0758 RE: Nelson Pipeline Facility Site Plan Drainage and Erosion Control Report Dear Mr. Carroll: Please refer to our enclosed "Drainage and Erosion Control Report for Nelson Pipeline Facility." This report was prepared in accordance with the Urban Storm Drainage Criteria Manual, with reference to the Comprehensive Drainage Study for the City of Evans, Volume 2, for regional hydrologic information. Please feel free to contact our office at (970) 484-1921 at your convenience if you have any questions regarding this report. We thank you for your time and consideration in reviewing this drainage report submittal. Sincerely, JIM SELL DESIGN, INC. /OadC31444ilbtrj _ Kent Bruxvoort, P.E. Senior Engineer Enclosure 2002-0991 E'NROJECT FILES LAND IE 170MOCS SI]OD DRAMA F RFPORT DOC EXHIBIT JIM SELL DESIGN,INC. 153 WEST MOUNTAIN AVENUE FORT COLLINS,COLORADO 80524 970 484.1921 FAX:97C I -- FINAL DRAINAGE AND EROSION CONTROL REPORT FOR: NELSON PIPELINE FACILITY WELD COUNTY, COLORADO Prepared for: DAVID NELSON NELSON PIPELINE CONSTRUCTORS, INC. 6215 COLORADO BOULEVARD COMMERCE CITY, COLORADO 80022 (303) 289-5975 — Fax: (303) 289-5975 Project#2170 January 18, 2002 Prepared by: • JIM SELL DESIGN 153 West Mountain Avenue Fort Collins,Colorado 80524 i-. FAX 970.484.2443 970.484.1921 ENGINEER'S CERTIFICATION BLOCK I hereby certify that this report for the final drainage design for the Nelson Pipeline Facility was prepared by me (or under my direct supervision) in accordance with the provisions of the Urban Drainage and Flood Control District Drainage Criteria Manual for the owners thereof. �Cro �1SRO4:<;<C„ oe • 7-4 Reg' ered Prof ssional Engineer State of Colorado No. 26325 *-p SS/ONP,iI -ENC7��c Drainage and Erosion Control Report For Nelson Pipeline Facililty EPROIECr FILIS LAND pg01ACO @I]OD DRAINAGE RUIVRT DOC January 18,2002-Page 2 Two historic basins (H1 and H2) have been delineated within the proposed site. Historic basins HI and H2 drain to the north-northeast via sheet flow through the proposed Nelson Pipeline Facility. Runoff coefficients for both historic basins are 0.01, 0.05, and 0.20 for the 5, 10, and 100-year events, respectively. In accordance with the Weld County Code, detained storm runoff from the site has been designed to release at the historic 5-year rate. A private irrigation lateral, approximately 2 feet wide and 2 feet deep, lies on the south edge of the site. The ditch conveys irrigation water from west to east to flood irrigate the existing site. The ditch was assumed to be flowing at bank full capacity during the 5, 10, and 100-year events, and therefore would not intercept storm water from offsite basins O1 and O2. Consequently, offsite basin O1 flows directly into historic basin HI. Similarly, offsite basin O2 flows directly into historic basin H2, as illustrated in Figure 2. Table 1 presents historic discharges for basins Hl, H2, O1, and O2 for the 5, 10, and 100-year events. TABLE 1 —HISTORIC AND OFFSITE BASIN DISCHARGES Historic Predicted Discharge Q (cfs) Basin ID Historic Release Minor Event(10 yr.) Major Event (100 yr.) Event(5 yr.) H1 0.10 0.60 4.74 H2 0.10 0.50 3.48 O1 6.63 7.84 18.60 O2 6.33 7.49 18.65 STORM DRAINAGE CRITERIA This drainage report was prepared to conform to the Urban Storm Drainage Criteria Manual (USDCM), prepared by the Urban Drainage and Flood Control District (March 1969). The Comprehensive Drainage Study for the City of Evans, Volume II (March 1997) was also referenced in the preparation of this report. Drainage calculations are presented in Appendix A. Swale calculations are presented in Appendix B, detention pond calculations are presented in Appendix C, and referenced information is presented in Appendix D. Storm runoff for the proposed Nelson Pipeline Facility was analyzed using the Rational Method. The Rational Method, widely accepted for design of sub-basins less than 160 acres, is appropriate for the site, as the total site area is approximately 64 acres, with approximately 11.8 acres proposed to be developed. In accordance with Weld County Code, basin peak discharges have been calculated for the major event (100-year return period) and the minor event (10-year return period). Additionally, basin discharges were determined for the 5-year event for comparison with historic discharges. Detention facilities have been designed to release at the historic 5-year rate. r Drainage and Erosion Control Report For Nelson Pipeline Facililty E NROILCI IIIESLANO121t0U111CC51'I I0V DRAINAGE REPORT DOC January 18,2002-Page 5 FIGURE 2-HISTORIC BASIN DELINEATION r I I I I I r I I ft I I �- - - -.......... / / 1H2113 / H1 / 32 ill 010 02 ® Ill... ( T L \ T I. it / ,. . III / CO11 —-- ` i — c_,' — ' SCALE = `,: 200 I I a .... A Drainage and Erasian CarlbD?Report For Nelson Pipeline Fat ililly e.a'RonnI PIF5,..wnm70UlrtSsminp DRAIN\GI_ICPORI DOC Janumy 18,2002-Page 6 DRAINAGE FACILITY DESIGN The proposed development will increase peak flow rates and runoff volumes. As a result, a detention pond has been designed to detain storm runoff on site. No storm sewers or inlets are designed as part of the storm drainage system for the site, but a culvert will be placed beneath the proposed access to the facility to convey flow along roadside swales. A storm pipe is also required at the detention pond outlet. Table A.1, in Appendix A, illustrates composite runoff coefficients for proposed conditions. Runoff coefficients ranged from 0.20 to 1.00 for the developed condition. Basin 6 has the highest runoff coefficient (1.00); it surrounds the detention pond, and therefore has the maximum runoff coefficient. The runoff coefficients presented in Table A.1 are composite runoff _ coefficients based on proportions of area within the basin with differing degrees of imperviousness. These areas include pavement, gravel, roof, lawn and undeveloped land use. Historic coefficients are 0.01 and 0.2 for all basins for the 5-year event and 100-year event, respectively. The coefficients were selected from the recommended runoff coefficient for "lawns, sandy soil" as published in the USDCM. _ As depicted, there are six proposed drainage basins. Storm water will be conveyed overland across the site, into roadside swales, and into the detention pond. The storm water will then be released from the pond at the historic 5-year rate, and will discharge into the agricultural field — north of the disturbed portion of the site. Grading downstream of the pond outlet has been designed to encourage the point-source discharge to return to a sheet-flow condition. The discharge will continue to flow north, and ultimately into Little Dry Creek. Figure 3 illustrates the developed basin delineation. The time of concentration calculations are presented in Table A.2 of Appendix A for the proposed condition. Historic time of concentration calculations are presented in Table A.3. Table A.4 presents rainfall intensity-duration data as referenced from Table 3.2.1 of the Comprehensive Drainage Study for the City of Evans, Volume II. Rainfall intensity-duration data was linearly interpolated from the data presented in Table 3.2.1 assuming that the time of concentration is equal to the storm duration (a standard assumption, as discussed in the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual). Intensity-duration calculations for design point flows and routed flows are also presented in Table A.4. Rational Method calculations for the 5, 10, and 100-year events are presented in Tables A.5, A.6, and A.7, respectively. These tables include routed discharges and discharges for each drainage sub-basin. The "comments" column on each of the Rational Method tables indicates which basins the storm runoff was routed from. Discharges from the developed basins are summarized in Table 2, following Figure 3. Table A.8 in Appendix A presents Rational Method calculations for both historic basins. _ Drainage and Erosion Control Report For Nelson Pipeline Facililry EIPROILCr EILrs ANDUIIODWocs\+1700 DRAINAGE REPORT IXX January 18,2002-Page 7 FIGURE 3 -DEVELOPED BASIN DELINEATION — I i I I I — f za set B \ 1 1 3 II �a I Q r , / ? t 1 ; O N. se I / `\\ VI U ' � . — r oI ii III 7 0.5c12)41 I 1 \•.:' I I -  _ En I= 17 SCALE = 1: 200 ' I ° a. S _ Drainage and Erosion Control Report Fm'Netmn Pipeline En,dill C.VTROll CI bll.l:LLANue flon\IxM Sm)au DU NNULi ln'olrr.uo0 Jelin/My IS.2002-Page S TABLE 2-DEVELOPED BASIN DISCHARGES Developed Predicted Discharge Q (cfs) Basin ID Historic Release Minor Event (10 yr.) Major Event (100 yr.) _ Event(5 yr.) 1 5.43 6.41 11.88 2 3.49 4.12 8.47 3 0.92 1.09 2.28 4 0.65 0.77 1.86 5 0.50 0.59 1.19 6 6.89 _ 8.13 12.84 SWALE DESIGN Five swales were designed to convey the peak 100-year discharge. Near the high points of the drainage basins, the swales were designed to carry discharges less than the calculated peak for that basin. Swale slopes will vary along between the high point of each respective basin and the low point; however, the swale slope will generally follow the grade of the adjacent roadway. Design for all five swales meets the minimum side slope standard of 3:1 as stated in the Weld County Code. Swale 1 will direct runoff from basins O2 and 2 around the south and southwest sides of the proposed building. Swale 1 has been divided into segments Swale la, Swale lb, and Swale lc. South of the proposed building, the swale will primarily collect runoff from offsite basin O2. The 100-year discharge for Swale 1 a is 18.65 cfs. Swale la has been designed with 4:1 side _ slopes because of width constraints on the west side of the proposed building. The required design depth and depth with freeboard for Swale l a are 1.47 feet and 1.63 feet, respectively. Freeboard depth for each swale was determined by adding 33 percent of the design discharge to the channel calculation. North of the proposed building, Swale la joins Swale lb. Swale lb will curve to the east at the confluence with discharge from basin 1,just southeast of a crossing with a field access road. Swale lb has been designed for a routed 100-year discharge for basins O2 and 2 of 23.04 cfs and will have 5:1 side slopes. Swale 1 c is defined as the swale downstream of the confluence with _ basin 1. Swale lc flows over a field access road, with 15:1 side slopes to allow agricultural vehicles to cross. The swale is designed for a routed 100-year discharge of 31.27 cfs for basins 1, 2, and O2. The design depth of Swale lc over the road is 1.27 feet including freeboard.aDrainage and Erosion Control Report For Nelson Pipeline Facililty E.Cxwect el£WANN'DC170D\DOCsmIDD DRAINAGE REPonr.DOC January 18,2002-Page 9 Swale 2 will drain the southern portion of Basin 3 on the east side of the access road off of Highway 52. The contributing area for Swale 2 is essentially confined to the east half of the access road and the swale itself; however, the entire 100-year discharge for Basin 3 was used in the analysis of the swale. The 100-year design discharge for Swale 2 is 2.28 cfs. Swale 2 will flow into Swale 3 at the confluence with runoff from Basins O1,4, and 5. The 100-year design discharge from Swale 3 is 19.55 cfs. Discharge from basins O1,4, and 5 enter Swale 3 through Culvert 2 (Culvert 1 is the proposed outlet from the detention pond). Culvert 2 will be a 24-inch _ RCP culvert designed to convey the 100-year combined discharge from basins O1, 4, and 5 underneath the access road. Swale 3 will route storm runoff to the southeast corner of the detention pond. _ Swale 4 will route the 100-year discharge from Basin 4 to Culvert 2. The 100-year design discharge for Swale 4 is 1.86 cfs. The design depth for Swale 4 including freeboard is 0.8 feet. _ Swale 5 has been designed to route a 100-year discharge of 1.19 cfs from Basin 5 to Culvert 2. The design depth for Swale 5 including freeboard is 0.56 feet. DETENTION POND A detention pond design was required for the site to release 100-year discharge during the developed condition at the historic 5-year rate. The pond will collect runoff from all 6 on-site basins and both offsite basins. An additional water quality capture volume (WQCV) was added to the design of the pond to aid with sediment control. Urban Storm Drainage Criteria Manual guidelines were used to generate the WQCV utilizing a 40-hour drain time. A drain time of 40 _ hours provides adequate time for suspend sediments to settle out before being transported downstream. Appendix C presents the detention basin design details. _ The detention pond will release discharge at the combined historic 5-year rate for historic basins H1 and H2 and offsite basins O1 and O2. The detention pond release discharge is equal to the summation of historic 5-year discharges for basins H1, H2, O1, and O2. The resultant release rate is 13.2 cfs. The detention pond release discharge calculation is presented in Table C.2 in Appendix C. The outlet structure for the detention pond will consist of a cast-in-place concrete vault. The vault will include a 5/8" thick steel plate with orifice holes for the release of the WQCV discharge. Calculations for the sizing of the orifice holes are presented in Table C.4 in Appendix C. Storm discharge will be released through a 9-inch wide opening in the concrete wall above the steel plate. The opening will allow for weir flow at a maximum release rate of 13.2 cfs at the 100-year water surface elevation of 4955.71 feet. Detail drawings of the outlet structure are presented on Sheet 5, of the plan set. The outlet structure will drain into a 24-inch RCP culvert, identified as Culvert 1. The culvert will daylight into the field to the north through a standard 24-inch precast flared-end section. _ Drainage and Erosion Control Report For Nelson Pipeline Facililry r.wRorzcrFILES LANDQ170MDOcsaI7on DRAINAGE REPORrtoc January 18,2002-Page 10 The detention pond has been designed with a total depth of 5 feet and 7:1 side slopes to minimize visual impact. Freeboard for the detention pond has been designed to provide an additional 10 percent of the required storage volume (including WQCV volume) for a total of 3.22 acre-feet. The additional volume results in a freeboard depth of 0.3 feet, therefore requiring a variance (see below). EROSION CONTROL PLAN Riprap basins were designed downstream of both culverts to protect the downstream swales from erosion. Type L riprap is required for both culverts. Riprap basins 19 feet and 6.7 feet in length are required for Culverts 1 and 2, respectively. According to the Urban Storm Drainage Criteria Manual, Type L riprap should be buried with native topsoil and revegetated to protect from vandalism. Riprap calculations are presented in Appendix B. In addition to the erosion protection provided by the water quality pond, a temporary erosion control plan is to be implemented for the site during construction. During construction, straw bale barriers will be placed at regular intervals (every 2 feet of drop) in the swales to dissipate energy, and ultimately intercept and detain sediment from being transported from the site. In addition, silt fences are to be constructed in accordance to the UDFCD Manual (V. 3) around the proposed access road to limit the off-site conveyance of sediment. Silt fences are also proposed on the north side of Swale 1 and the detention pond. Grading will be limited to the access road, and building envelopes to maintain much of the surface vegetation. Areas disturbed by grading will be protected from further erosion during the construction process. Surface roughening, mulching, and temporary or permanent revegetation may be implemented on the site. Which method to be used in different areas will be determined by construction scheduling, as different methods protect the site for a given duration of time. Also, as outlined in the UDFCD Manual (V. 3), all temporary erosion control measures will be removed after the temporary measures are deemed unnecessary. VARIANCE REQUESTED A variance to the design standard for detention pond freeboard is requested. Many municipalities along the Northern Colorado Front Range suggest a freeboard depth of 1 foot for a detention pond. The detention pond was designed to minimize visual impact by maintaining 7:1 side slopes, and limiting pond depth. The resulting design allowed 0.3 feet for freeboard, providing an additional 10 percent of the required storage volume. We believe that the freeboard provided in the design will not be detrimental to public health, safety or welfare, will not reduce the longevity of the pond, and will not have a negative impact on capital or maintenance cost requirements for the County and/or the property owner. Drainage and Erosion Control Report For Nelson Pipeline Fertility E.\PROJECT FILES\LAND 170D\DOCSLI]OD DRAINAGE REroRr.DOC January 1 R,2002-Page 11 CONCLUSIONS The Nelson Pipeline Facility drainage report has been designed to comply with The Urban Storm Drainage Criteria Manual and the Weld County Code, with reference to the Comprehensive Drainage Study for the City of Evans, Volume 2, for hydrologic information. A variance to allow an additional 10 percent of storage volume in place of 1-foot for freeboard in the detention pond is requested as part of this submittal. The drainage plan presented in this report is intended to effectively and safely convey storm runoff through the site. REFERENCES Comprehensive Drainage Study for The City of Evans, Volume 2, Rocky Mountain Consultants, Inc., March 1997. Larimer County Storm Water Management Manual,Resource Consultants, Inc., May, 1979. Urban Storm Drainage Criteria Manual, Denver Regional Council of Governments,March 1969, Volumes 1, 2, & 3 The Weld County Code, Colorado Code Publishing Company, Fort Collins, CO, July 2001 Drainage and Erosion Control Report For Nelson Pipeline Facililry PROJECT egLesvv nrmmroomocsmron DRAINAGE REPORT OOC January 18,2002-Page 12 GENERAL DESCRIPTION AND LOCATION The proposed Nelson Pipeline Facility is located on the north side of Colorado State Highway 52 between County Road 21s and 23 in Weld County. The project site is approximately 64 acres with an area affected by site plan development of approximately 11.8 acres (See Figure 1). The property lies in the west half of the northeast quarter of Section 2, Township 1 North, Range 67 West in Weld County, Colorado. The proposed development consists of a storage yard and office/shop facilities to be used as the headquarters for Nelson Pipeline Constructors, Inc. Neighboring land use is rural residential and agricultural. EXISTING CONDITIONS Currently, the site is primarily used for agricultural purposes. Areas not used for agricultural purposes predominantly contain grasses. There is a gas well existing within the area affected by site plan development. The access for the gas well will be relocated to the eastern border of the site. An existing irrigation lateral is also present on the site. Some of this water will be re-routed west around the perimeter of the site to provide continued irrigation of the land directly north of the site. Soils on the site are primarily sandy loam. According to the Soil Conservation Service Soils Report for Weld County, soils contained on the site are Olney Fine Sandy Loam and Nunn Clay Loam. There are no existing wetlands on the site. DRAINAGE BASINS AND SUB BASINS As of the printing of this report, the proposed Nelson Pipeline Facility does not lie within a defined regional drainage basin. A regional basin containing the Nelson Pipeline Facility has been delineated for this report to determine historical flows through the site (see Historical Drainage Plan, Figure 2). Colorado State Highway 52 traverses the basin just upstream (south) of the site. A swale on the south side of County Road 52 collects runoff from the road and ultimately drains eastward to Brighton Ditch. Therefore, the offsite basins' upstream boundary has been delineated along the north bank of the ditch on the north side of Highway 52. This regional basin slopes to the north at an average of approximately 1.8 percent with slopes ranging from roughly 1 percent to 2 percent. The basin ultimately drains into the South Platte River. Historical use of the basin was primarily agricultural, however some residential land use exists in the basin. Offsite flows from the south are generated from an area of 17.8 acres. The entire site drains in a north-northeast direction. Using runoff coefficients from the Urban Storm Drainage Criteria Manual and Intensity-Frequency Tables from the City of Evans, the offsite flows were computed as 7.8 cfs and 7.5 cfs for the 10-year event from offsite basins O1 and O2, respectively. The 100-year offsite flows were computed as 18.6 cfs and 18.7 cfs for offsite basins O1 and O2, _ respectively. Basins O1 and O2 include two existing residences. No significant off-site flows enter the proposed site from the north, west or east. Flow exits the site as sheet flow along the northeast boundary of the site, ultimately flowing northward to Little Dry Creek. Drainage and Erosion Control Report For Nelson Pipeline Faciiily e.waoJEC FlLLN.AND➢70o\COCS\2170D DRANAGF.RI-PORT DOC January 18,2002-Page 3 FIGURE 1 -VICINITY MAP 0 co I N I 20 L 85 0 1850 0 FIRESTONE 18 ■ oru °' 16 N 6 � FR D; 'iC 14 0 / FORT LUPTON ACON.12 12 I SITI= 2 10 10 Q It in � 2 63' 6 440/ _ I ru / 425 Scale, 1" = 8000' �1l/ _ Drainage and Erosion Control Report Far Nelson Pipeline Facililty cu ROJFCI mEt ANucroomocsc 1700 uR INAGL Iu Iroar.uc c January 18,2002-Page 4 Hello