Loading...
HomeMy WebLinkAbout20041017.tiff Ail BOARD OF DIRECTORS = NORTH WELD COUNTY WATER DISTRICT GARY SIMPSON Ilia 33247 HIGHWAY 85 • LUCERNE, CO 80646 ROBERTARNBRECHT ` ' ' .� „� CHARLES ACHZIGER , DON POSSELT, DISTRICT MANAGER RALPH PRIOR JOHN JOHNSON P.O. BOX 56 • PHONE (970) 356-3020 • FAX (970) 395-0997 e-mail: water@nwcwd.org August 14, 2002 ,/, )1 Snowdance Development 641Pdtpele: ree ey, Avenue, Sui[e 305 Greeley, CO 80634 • PIP i G Attn: Christian Rawson 0- C 103 Re: Appaloosa Acres Estates, PUD V 'O NC North Weld County Water District is able and intends to serve the proposed 22 Lots in Appaloosa Acres PUD,located in the SW 'A of Section 33, Township 7 North,Range 65 West, of the 6d'Prime Meridian. To provide water service and 1,000 gpm fire flows with a residual pressure greater than 20 psi, Developer will have to extend an 8-inch line from the existing water line in the WCR 41 R-O-W to the developments most northern lots and then through the subdivision and connect to the existing waterline within the WCR 74 R-O-W. The District will also require a dedicated Right-Of-Way/Easement twenty feet in width between Lots 16& 17 and between Lots 5 &6 for installation and maintenance of such waterline. Due to the location of the Development and the Districts' existing infrastructure, no fire flow fee will be required with the above-mentioned alignment. If road enhancements are needed for either WCR 41 or WCR 74, the District will have additional fees to provide isolation valves for the existing waterline if road improvements are necessary. The costs associated with water service shall be the current Plant Investment &Distance Fee per Lot prior to water being supplied to the subdivision or phase of subdivision. If the subdivision is completed in phases, the Districts' Board of Directors must approve the staging of Plant Investments&Distance Fees. The Water Mains serving the subdivision shall be paid for and constructed by the Developer, according to the Districts' Standards and Specifications. Raw Water shall be purchased through North Weld County Water District before an individual tap will be set. The Raw Water Cost may be paid by the developer, or by the individual lot owner. (I) The Meter Set Fee will be billed after work has been performed and will be at cost. (2) Refer to the following Table for the costs of the associated Fees at the present time. All Fees and Requirements are subject to change without notice, therefore; it is recommended to keep in contact with the District periodically for updated costs and requirements. Fees and Cost Time of Payment Requirements (as of October 1, 2002) Off-Site Infrastructure $TBD After County Approval,Before Construction Begins (Not-To-Exceed$50,000) Fire Flow Fee $N/A N/A Plant Investment Fee $143,000 Date To Be Determined Distance Fee $99,000 Date To Be Determined Raw Water Requirement $286,000 (') Before Individual Meters will be Set - ' Meter Set Fees $22,000 (2) After Individual Meters have been Set Total Fees Developer Portion Total Cost for 22 Lots with 1,000 gpm Fire Flow $550,000+Off-Site $242,000 +Off-Site It is the Developers' responsibility to have the internal water mains designed by an engineer, and such designed plans shall be approved by the District. When the Developer is ready to proceed,the District and the Developer will enter into a legal Water Service Agreement. If you have any questions, you can contact me at the office (970) 356-3020. Alan Overton P:\Subdivisions\Appaloosa Acres\Inlenl l000gpm(0S-14-02).doc 2004-1017 Hello