April 24, 2001
Mike Schemm
This letter is in response to your inquiry regarding water service to the following described property,
In a portion of the
S 'V2 of Section 9, T7N, R67W of the 6th Prime Meridian
1. Water service is presently being provided to the above described property.
2. North Weld County Water District is able and intends to provide water service to the above mentioned property,
provided all requirements of the District are satisfied. Before a water tap may be purchased, the applicant must
provide a copy of a Warranty Deed,a Physical Address and this letter. The applicant should also bring a copy of a
surveyed plat of the property(required for a recorded exemption).
If contracts have not been completed with North Weld County Water District within one year from the date of this
letter,this letter shall become null and void. The Tap Fees quoted below,shall be valid for ten(10)business days from
the date the applicant receives this letter. After ten days,the costs will be subject to the current cost established by the
District. The applicant can avoid the Raw Water portion of the Tap Fee, by permanently transferring one unit of
Colorado Big Thompson (CBT) Water to the District.
TAP FEES INSTALLATION COST ESTIMATE
Raw Water f,)r an Acre-Foot Unit (AFU) $10,000 Line Extension & Meter Set
Base Portion of Plant Investment Fee $5,000
I Distance Portion of Plant Investment Fee $200 At Cost TBD
TOTAL Up-Front COSTS $15,200 + Line Ext. & Meter Set
After the water tap has been purchased(Raw Water AFU&Plant Investment Fee)the applicant has one year in which
to have the meter set. The District requires 45 days prior notice to setting a meter. If the meter has not been set within
one year from the purchase of such meter, the District shall refund the applicant 75% of the purchase price that was
paid by the applicant. If any line extensions, road bores or additional installation costs are estimated to be more than
$5,000, then Proof that"Loan Funds or a Line of Credit"are Available and ready to reimburse the District at the time
of completion, for 100% of the estimated cost. The applicant will pay such costs before the tap is activated (water is
turned on).
Water tap/service shall he placed on the physical property, defined by a legal description. In case of a Recorded
Exemption,the water tap shall only serve the parcel that the water tap is located on. Service shall NOT cross the legal
description of one parcel to serve the other parcel.
The District recommends that anticipated water usage be purchased through the District. The District guarantees
treatment and delivery of water purchased. All rental water and water that is delivered with surcharge is subject to
water availability and will be issued on a first come-first serve basis and is not guaranteed to be available. From
the information contained in the Water Consumption Survey the District requires that 1 Acre-Foot Unit (AFU) is
purchased. With 1 AFU purchased any usage beyond 228,000 gallons will be in surcharge.
The Plant Investment Fee shown above pays for the infrastructure required to deliver 1 AFU (228,000 gallons). If
usage exceeds the number of Plant Investments that were purchased, an additional surcharge will be applied to
your account. Plant Investments may be purchased to increase the amount of water to be delivered and avoid the
surcharge.
Alan Overton
North Weld County Water District
U:\Legal Documents\Letter of Intent\2001\SchemmMike(4-24-0I).doc
2002-1751