Loading...
HomeMy WebLinkAbout20021751.tiff BOARD OF DIRECTORS NORTH WELD COUNTY WATER DISTRICT GARY SIMPSON 33247 HIGHWAY 85 • LUCERNE, CO 80646 ROBERT ARNBRECHT Hoar W.M. McKAY DON POSSELT, DISTRICT MANAGER CHARLES ACHZIGER RALPH PRIOR P.O. BOX 56 • PHONE (970) 356-3020 • FAX(970)395-0997 e-mail: water@nwcwd.org April 24, 2001 Mike Schemm This letter is in response to your inquiry regarding water service to the following described property, In a portion of the S 'V2 of Section 9, T7N, R67W of the 6th Prime Meridian 1. Water service is presently being provided to the above described property. 2. North Weld County Water District is able and intends to provide water service to the above mentioned property, provided all requirements of the District are satisfied. Before a water tap may be purchased, the applicant must provide a copy of a Warranty Deed,a Physical Address and this letter. The applicant should also bring a copy of a surveyed plat of the property(required for a recorded exemption). If contracts have not been completed with North Weld County Water District within one year from the date of this letter,this letter shall become null and void. The Tap Fees quoted below,shall be valid for ten(10)business days from the date the applicant receives this letter. After ten days,the costs will be subject to the current cost established by the District. The applicant can avoid the Raw Water portion of the Tap Fee, by permanently transferring one unit of Colorado Big Thompson (CBT) Water to the District. TAP FEES INSTALLATION COST ESTIMATE Raw Water f,)r an Acre-Foot Unit (AFU) $10,000 Line Extension & Meter Set Base Portion of Plant Investment Fee $5,000 I Distance Portion of Plant Investment Fee $200 At Cost TBD TOTAL Up-Front COSTS $15,200 + Line Ext. & Meter Set After the water tap has been purchased(Raw Water AFU&Plant Investment Fee)the applicant has one year in which to have the meter set. The District requires 45 days prior notice to setting a meter. If the meter has not been set within one year from the purchase of such meter, the District shall refund the applicant 75% of the purchase price that was paid by the applicant. If any line extensions, road bores or additional installation costs are estimated to be more than $5,000, then Proof that"Loan Funds or a Line of Credit"are Available and ready to reimburse the District at the time of completion, for 100% of the estimated cost. The applicant will pay such costs before the tap is activated (water is turned on). Water tap/service shall he placed on the physical property, defined by a legal description. In case of a Recorded Exemption,the water tap shall only serve the parcel that the water tap is located on. Service shall NOT cross the legal description of one parcel to serve the other parcel. The District recommends that anticipated water usage be purchased through the District. The District guarantees treatment and delivery of water purchased. All rental water and water that is delivered with surcharge is subject to water availability and will be issued on a first come-first serve basis and is not guaranteed to be available. From the information contained in the Water Consumption Survey the District requires that 1 Acre-Foot Unit (AFU) is purchased. With 1 AFU purchased any usage beyond 228,000 gallons will be in surcharge. The Plant Investment Fee shown above pays for the infrastructure required to deliver 1 AFU (228,000 gallons). If usage exceeds the number of Plant Investments that were purchased, an additional surcharge will be applied to your account. Plant Investments may be purchased to increase the amount of water to be delivered and avoid the surcharge. Alan Overton North Weld County Water District U:\Legal Documents\Letter of Intent\2001\SchemmMike(4-24-0I).doc 2002-1751 Hello