HomeMy WebLinkAbout951680.tiff Exhibit "C"
LITTLE THOMPSON WATER DISTRICT
DIRECTORS:
Glenn w.GibsonTelephone 532-2096
Rneidanl February 10, 1995 635 E. Highway 56
Leo 6eaei
Drawer G
Kelm Croonavial Berthoud, Colorado 60513
Tom Reynolds
Dean Anderson
Canby J.Salomonson
Jams W.Stroh
MANAGER:
Richard H.H.WhRbt R`CF/1/'O
Frank Kemme
Nelson Engineers PEE
822 7th street / 199S
#520
Greeley, CO 80631
Re: Pioneer Estates/ Meadow Brook Farm
Dear Frank;
This letter is in response to your request that the Little •
Thompson Water District provide an updated water commitment for the
proposed subdivision, described as follows:
NE 1/4, NW 1/4 , SEC 8, T5N, R67W -- Weld County
Pioneer Estates/ Meadow Brook Farm
The request is for 6 standard 5/8" X 3/4" residential water
taps (one per lot) . We will commit- to provide service to these lots
via one standard residential water tap per lot with the following
conditions:
1. The District has implemented a "system impact" fee for
all lots to be added to our system. The fee is $1,000. 00
per lot and is due and payable upon acceptance of the
main line extension.
2 . All improvements to District facilities required to
provide service will be the financial responsibility of
the developer in accordance with District Rules and
Regulations. All improvements must conform to District
Specifications.
3 . We currently have a 6" Dia. line along the South side of
WCR 60 with additional capacity available. You will need to do
a main line extension to provide service to the subdivision.
Fire protection would may require that you also connect to our
existing 6" line on the Aas property.
4 . The District requires the transfer of one share of Colorado
95166O
Big Thompson water for Each lot added to the system.
5. The installation Af fire hydrants requires the payment of
a $2 , 000 hydrant fee for each hydrant added to the system.
This commitment will expire one year from the date of this
letter if the taps have not been purchased and installed by that
'late. The current fee for the above described water tap(s) is
$4, 000. 00 (each) and is subject to change without notice. I have
-included a copy of our main line extension policy manual for your
review.
_If you have any questions, or should you need additional
information, please contact our office.
Regards,
Michael T. Cook P.E.
District Engineer
951680
l
' r Exhibit "E" Youdre •
POUDRE VALLEY RURAL Valley � A
ELECTRIC ASSOCIATION , INC .
4809 SOUTH COLLEGE AVE • P.O.BOX 272550 FORT COLLINS • 226-1234
FORT COLLINS, COLORADO 80527-2550 FAX NO. • (303) 226-2123
February 10, 1995 W.O. 27551
RECf1VEp FEB I A 199
Nelson Engineers
Frank -femme
4322 7th Street
Greeley, CO. 80631
TRE: MEADOW BROOK FARM SUBDIVISION
Dear -•!r. Temme:
Poudre Valley Rural Electric Association, Inc. is ready, willing
and able to serve all electrical loads within our certificated
service territory subject to the Mules and -Regulations of Poudre
Valley Rural Electric Association.
If you have any further questions , please call our office.
Sincerely,
Terry Fielding
_Engineering Representative
P1
A:\TF\WO27551-A.BLE
GREELEY•686-7431 LONGMONT . 776-1084 DENVER • 623-8606 1-800-4-32-1012
AN EQUAL OPPORTUNITY-EMPLOYER
951680
Exhibit ",D"
•
•
Public Service Company of Colorado
1901 E.Horsetooth Rd.
Fort Collins,CO 80525-2941
January 31, 1995
Nelson-Engineers RECEIVED
822 7th St. DEB 2 7995
Greeley, CO 80631
ATTN: frankK--emme
Dear Mr. Kemme:
Regarding: Meadowbrook Farm
This letter is to inform you that Public Service Company will be able to providegas service to Lots
1 through 6 oftvfeadowbrook Farm in accordance with the_Company's gas line extension policy on
$lewith the Public Utilities Commission of the State ofColorado.
Please feel freeto-call if you have any questions regarding this matter.
Sincerely,
James DeWilde
Planner
225-7844
JD:sk
•
951680
Exhibit "F"
LUJ VEST'
COMMUNICATIONS
RECf/VEDFE$ / 8 '
s95
Littleton,Colorado
February 15,1995
Mr. Frank Kemme
Nelson Engineers
822 7th Street Suite 520
Greeley, Colorado 80631
Dear Mr. Kemme,
Per your request, U S WEST Communications will provide telephoneservieeto
Meadowbrook Farm Subdivision near Greeley as required by the-tariffs filed with the
Colorado Public Utilities Commission.
For your information, in order to design the job and prepare theland Development
Contract,we will need a copy of the final plat withtddresses shown,-open trench dates
and required service datesand any phasing schedules. This information should be
provided to us early in the planning stages to insure-timely response.
3/
If you-have any questions,please call meat (3071)9323213.
Sincerely,
iekCek
Bob Tate
US WEST Communications
951680
Hello