June 11, 1999
Mr. Glen Blackburn
Tuttle-Applegate, Inc.
11990 Grant Street
Suite 304
Denver, CO 80233
Re: Riverdance Subdivision
Located generally in NE '/, Section 35 &NW %, Section 36, T3N, R68W
Dear Mr. Blackburn,
Saint Vrain Sanitation District will provide sanitary sewer service to the proposed
development, Riverdance Subdivision, subject to the following conditions:
• Completion of the District's trunk line to the development,
• Completion of facilities to increase treatment capacity, if needed,
• Completion of necessary connection agreements, and
• Receipt of applicable fees.
Service will be subject to the rules and regulations of the Saint Vrain Sanitation District.
Sincerely,
Saint Vrain Sanitation District
eark A Peterson
anager
• EXNi y
992221 1
07-•11-1153 l_7:EVHh1 HELM TTLE_THU'1F iM .HTEH TL i "i== _- P.
LITTT THOMPSON WATER Dr TRICT
Torn Rw 0Rs'. $IephCne(970)5328096
Tan osidow ass E Highway 56
aakS DrawerG
two Cro nmiel July 1, 1 9 9 9 eethou6.0)000(960 90513
Glenn Gaul W.Gaon
Paw Maroon
Cues J.Saleroom(
James w..Stroh Svo"
MANAGER:
RiOwo H N.M,,*a
Mike Siegrist
875 West 64th Ave .
Denver, CO 80221
Dear Mr. Siegrist;
This letter is in response to your request for a water service
commitment for up to 512 lots residential lots, in the proposed
subdivision described as follows:
PORTIONS OF SEC. 35, T3N, R68W -- WELD COUNTY, CO
Riverdance (second phase)
Little Thompson Water District will commit to provide service
to these residential lots via one standard residential 5/8" X 3/4"
water tap per lot, with the following conditions :
1 . In August of 1993 the Little Thompson Board implemented a
"system impact" fee of $1050 per lot for all lots to be added
to the system. This is due upon completion of the main line
extension agreement .
2 . All improvements to District facilities required to
provide service will be the financial responsibility of the
developer in accordance with the District Rules and
Regulations . All improvements must conform to District
Specifications.
3 . Little Thompson Water District requires the transfer of
one share of Colorado Big Thompson water for each lot in the
commitment . The cost of this water is sub;ect to rebate from
the tap fees paid from the development .
4 . The installation of a fire hydrant requires payment of a
tha
$2 , 000 fire hydrant fee prior to final app
al of subdivisions lines .
7 fl1 1'999 L+ _9y'9 FRJ•1 L:IT_E_T tun J,LIJHILH'. F.�_L;
5 . In order to provide the required flows to the
subdivision you will be required to install a minimum of a 12 '
Dia. water line connecting the existing 24" Dia . water line
located at I-25 and WCR 38 to the water lines in the area of
your subdivision. The exact location of the Southern end of
the line will depend on the timing of your project and the
extent of water lines installed in the area at the time you
want to begin service. The District may wish to oversize this
line for future needs .
6 . You will also be required to provide the needed water
lines in the proposed subdivision.
7 . The design, installation and total cost of the project
will be the responsibility of the developer.
:t is possible that some of these required water lines may be
required, built or are being designed by other developers in the
same area. If they are in place when you need them then you may be
able to utilize them to serve your development ( subject to LTwD
rebate policy) . It would be wise to work with the other developers
in the area to ensure that the water lines installed would be sized
to meet the needs of both developments to reduce the amount of
duplication and minimize future water line replacement.
This commitment will expire one year from the date of this
letter if the taps have not been purchased and installed by that
date. The current fee for the domestic 5/8" X 3/4" tap is
$7, 500 . 00 . These fees area subject to change without notice.
If you have questions, please contact me in our office .
Regards,
ichael T. Cook P.E.
District Engineer
TOTAL P.0=
1I!, LITT" 1;:i HOMPSON WATER ) -3TRICT
'��� DIRECTORS: Telephone(970)532-2096
Tom Reynolds 835 E.Highway 56
President Drawer G
Leo Bartel June 14 , 1999
Berthoud,Colorado 80513
Keith Croonquist
lj'' Glenn W Gibson
Dean Anderson
{ Carey J.Selomcnson
James W Stroh
{MANAGER: #.i�? rl `,{S'}G
Richard H.H. Mullet
1 ,
l
Mike Siegrist
875 West 64th Ave.
Denver, CO 80221
Al
III
'' Dear Mr. Siegrist;
11
This letter is in response to your request for a water service
j' commitment for up to 125 lots residential lots, in the proposed
subdivision described as follows :
fl
li PORTIONS OF SEC. 35, T3N, R68W -- WELD COUNTY, CO
Riverdance ( formerly Waterside)
I , Little Thompson Water District currently has a 12" Dia. water
line located along Hwy 66 and an 8" Dia. Connection to the existing
18" Dia. LTWD - CWCWD transmission line at WCR 9 % and WCR 28 with
9 additional capacity available Therefore, we will commit to provide
service to these residential lots via one standard residential
5/8" X 3/4" water tap per lot, with the following conditions :
1 . In August of 1993 the Little Thompson Board implemented
P p a
I'',: "system impact" fee of $1050 per lot for all lots to be added
to the system. This is due upon completion of the main line
i1
I extension agreement .
I; 2 . All improvements to District facilities required to
provide service will be the financial responsibility of the
• developer in accordance with the District Rules and
li
' Regulations . All improvements must conform to District
0, Specifications .
1,;�, 3 . Little Thompson Water District requires the transfer of
one share of Colorado Big Thompson water for each lot in the
commitment . The cost of this water is subject to rebate from
the tap fees paid from the development .
(F
tii
I.
pi
'i r
I,' (" 1J
ils
II
i
4 . The installation of a fire hydrant requires payment of a
$2, 000 fire hydrant fee prior to final approval of the
II i subdivisions lines .
ii'
5 . In order to provide the required minimum flows to the
subdivision you will be required to install a minimum of a 12"
Dia. water line connecting to the existing 8" connection along
I�, WCR 28 at WCR 9 %. This connection will require construction
„i of a metering/pressure reduction vault at WCR 28 & WCR 9 %.
I
6 . You will also be required to provide the needed water
!Il'I lines in the proposed subdivision.
fif,, 7 . You will need to loop a minimum 12" Dia. Line from the
Yrl existing 12" line along Hwy 66 south to your proposed
subdivision to ensure that the fire flows will be available
during peak hour demands on the water system.
8 . The design, installation and total cost of the project
I will be the responsibility of the developer.
It is possible that some of these required water lines and
metering vault (WCR 28® WCR 9 ≤ )may be built or are being designed
�, by other developers in the same area. If they are in place when you
need them then you may be able to utilize them to serve your
` development ( subject to LTWD rebate policy) . It would be wise to
{"'` work with the other developers in the area to ensure that the water
I lines installed would be sized to meet the needs of both
'• developments to reduce the amount of duplication , and minimize
future water line replacement .
I
This commitment will expire one year from the date of this
,,.I letter if the taps have not been purchased and installed by that
j' date. The current fee for the domestic 5/8" X 3/4" tap is $6, 000 . 00
The tap fee will increase to $7, 500 . 00 on July 1, 1999 . These fees
I< area subject to change without notice .
ut
ji' If you have questions, please contact me in our office .
! Regards,
If / ,
till% Michael T. Cook P. E.
District Engineer
I
I' I
iil
615 West 84!h Avenue
Oervar, m)4� 541
Pone(303)427-8472 O0�)tax 1� 427-8-8542
MAST COMPANIES
June 18, 1999
Little Thompson Water District
Michael T. Cook,P.B.,District Engineer
835 East Highway 56,Drawer G
Berthoud,Colorado 80513
Dear Mr. Cook:
Thank you tor your Letter of Conunitment fin ow fu st pliaso conatruction nt RivorDanoe.
As we discussed on the phone we are currently submitting a request for Change of Zone
to the County.They have indicted that a commitment for the total project will be required.
We would, therefore, request an additional commitment for the remaining property. I
realize that commitment for the remaining property will required additional off-site
improvements, which are subject.to cooperative efforts by the land owners in the area, and
may change depending on figure negotiations We are planning to submit our request to
Weld County on July 1, 1999 and appreciate your help.
Thank you for your time and consideration
Since
c el , Sic ist
P ident
'd sD: 9SdEOE 'ON :;b'= S311i;d1CO LSId9315 : :o. 188 cE-7: -Idfl:
l #IITED
POWER
UNITED POWER, INC.
P.O,BOX:929,BRIGHTON,CO 80801
TELEPHONE:(303)659-0551 I 1-800.486-8809
FAX(303)059.2172
nttpu/wv w.uniledpowor.00m
Tune 23, 1999
Mr. Glen D.Blackburn, E.T.
Tuttle Applegate, Inc.
11990 Grant Street, Suite 304
Denver,CO 80233
•
Dear Mr. Blackburn: .
SUBJECT: Riverdance Development
•
The purpose of this letter it to advise you that United Power is ready, willing and able to provide
electric service to the proposed Riverdance Subdivision.
United does have the capacity to serve the development.
The developer will be assessed a portion of the off-site cost of an electrical line along the west
side of the development. That electric line is currently being constructed in conformance with
the CDOT project now under construction.
In regard to the CDOT project, we are,in urgent need of the location and construction plans for
the access to the subdivision from the I-25 Frontage Road. The access plans are critical to the
location of our tap box from which to serve the subdivision.
I look forward to working with you on the plans for Riverdance.
Sincerely,
UNITED POWER, INC.
iata
Bill Meier •
1-25 District Representative
BM:mb
A CONSUMER OWNED UTILITY
USWEST
124 W. Magnolia
Fort Collins, CO. 80524
June 15, 1999
Subject: Telephone facilities to planned / proposed development.
Tuttle Applegate, Inc.
Attn: Glen D. Blackburn, E. I.
USWEST will provide service to your planned / proposed development,
Riverdance Subdivision formerly known as Waterside Subdivision.
Provisioning the service will be in accordance with tariffs on file at
the Colorado Public Utilities Commission. I will need a final plat with
measurements, easements, addresses, your phasing plan, and a trench plan
before I can have this engineered. If there are any further questions,
or if I can provide any assistance, please contact me on 970-224-7550.
Sincerely,
i r
Carole A. Veysey
Land Development Engineer
KN Energy, Inc.
323 5th Street
ENERGY PO.Box 437
Frederick,CO 80530-0437
(800)563-0012
June 24, 1999
Tuttle Applegate, Inc.
Re: Riverdance Subdivision
11990 Grant St. Suite 304
Denver, CO 80233
To Whom It May Concern,
This letter is in reference to the recent inquiry regarding the availability of natural gas to
Riverdance development located north and adjacent to the St. Vrain Creek, and two miles north
of State Highway 119, and east and adjacent to Interstate 25. KN Energy pipelines could
provide an adequate supply of natural gas for your present projected load demand and will service
the development.
It is the desire of KN Energy to serve new and existing developments in our service territories and
we look forward to helping you in any way we can. As your project progresses please allow us to
provide you with any additional information necessary. You may rely on us to provide you with
exceptional quality for your utility and service needs. Please do not hesitate to contact me with
any questions you may have. Thank you for the opportunity to serve you.
Sincerely,
Ted Willden
(303) 833-3313 ext. 21
RECEIVED
1999
Hello