Loading...
HomeMy WebLinkAbout992221 mac. (Main cSanitation 11 )i±ta._c (cSaint cSan) 7epcppcns J3.e./Doc 908 (303) 776-9570 436 Co//,n_,<n„ t.≥uife 200 (303)774-234999x Tonc9niont,Ce 80502-0008 June 11, 1999 Mr. Glen Blackburn Tuttle-Applegate, Inc. 11990 Grant Street Suite 304 Denver, CO 80233 Re: Riverdance Subdivision Located generally in NE '/, Section 35 &NW %, Section 36, T3N, R68W Dear Mr. Blackburn, Saint Vrain Sanitation District will provide sanitary sewer service to the proposed development, Riverdance Subdivision, subject to the following conditions: • Completion of the District's trunk line to the development, • Completion of facilities to increase treatment capacity, if needed, • Completion of necessary connection agreements, and • Receipt of applicable fees. Service will be subject to the rules and regulations of the Saint Vrain Sanitation District. Sincerely, Saint Vrain Sanitation District eark A Peterson anager • EXNi y 992221 1 07-•11-1153 l_7:EVHh1 HELM TTLE_THU'1F iM .HTEH TL i "i== _- P. LITTT THOMPSON WATER Dr TRICT Torn Rw 0Rs'. $IephCne(970)5328096 Tan osidow ass E Highway 56 aakS DrawerG two Cro nmiel July 1, 1 9 9 9 eethou6.0)000(960 90513 Glenn Gaul W.Gaon Paw Maroon Cues J.Saleroom( James w..Stroh Svo" MANAGER: RiOwo H N.M,,*a Mike Siegrist 875 West 64th Ave . Denver, CO 80221 Dear Mr. Siegrist; This letter is in response to your request for a water service commitment for up to 512 lots residential lots, in the proposed subdivision described as follows: PORTIONS OF SEC. 35, T3N, R68W -- WELD COUNTY, CO Riverdance (second phase) Little Thompson Water District will commit to provide service to these residential lots via one standard residential 5/8" X 3/4" water tap per lot, with the following conditions : 1 . In August of 1993 the Little Thompson Board implemented a "system impact" fee of $1050 per lot for all lots to be added to the system. This is due upon completion of the main line extension agreement . 2 . All improvements to District facilities required to provide service will be the financial responsibility of the developer in accordance with the District Rules and Regulations . All improvements must conform to District Specifications. 3 . Little Thompson Water District requires the transfer of one share of Colorado Big Thompson water for each lot in the commitment . The cost of this water is sub;ect to rebate from the tap fees paid from the development . 4 . The installation of a fire hydrant requires payment of a tha $2 , 000 fire hydrant fee prior to final app al of subdivisions lines . 7 fl1 1'999 L+ _9y'9 FRJ•1 L:IT_E_T tun J,LIJHILH'. F.�_L; 5 . In order to provide the required flows to the subdivision you will be required to install a minimum of a 12 ' Dia. water line connecting the existing 24" Dia . water line located at I-25 and WCR 38 to the water lines in the area of your subdivision. The exact location of the Southern end of the line will depend on the timing of your project and the extent of water lines installed in the area at the time you want to begin service. The District may wish to oversize this line for future needs . 6 . You will also be required to provide the needed water lines in the proposed subdivision. 7 . The design, installation and total cost of the project will be the responsibility of the developer. :t is possible that some of these required water lines may be required, built or are being designed by other developers in the same area. If they are in place when you need them then you may be able to utilize them to serve your development ( subject to LTwD rebate policy) . It would be wise to work with the other developers in the area to ensure that the water lines installed would be sized to meet the needs of both developments to reduce the amount of duplication and minimize future water line replacement. This commitment will expire one year from the date of this letter if the taps have not been purchased and installed by that date. The current fee for the domestic 5/8" X 3/4" tap is $7, 500 . 00 . These fees area subject to change without notice. If you have questions, please contact me in our office . Regards, ichael T. Cook P.E. District Engineer TOTAL P.0= 1I!, LITT" 1;:i HOMPSON WATER ) -3TRICT '��� DIRECTORS: Telephone(970)532-2096 Tom Reynolds 835 E.Highway 56 President Drawer G Leo Bartel June 14 , 1999 Berthoud,Colorado 80513 Keith Croonquist lj'' Glenn W Gibson Dean Anderson { Carey J.Selomcnson James W Stroh {MANAGER: #.i�? rl `,{S'}G Richard H.H. Mullet 1 , l Mike Siegrist 875 West 64th Ave. Denver, CO 80221 Al III '' Dear Mr. Siegrist; 11 This letter is in response to your request for a water service j' commitment for up to 125 lots residential lots, in the proposed subdivision described as follows : fl li PORTIONS OF SEC. 35, T3N, R68W -- WELD COUNTY, CO Riverdance ( formerly Waterside) I , Little Thompson Water District currently has a 12" Dia. water line located along Hwy 66 and an 8" Dia. Connection to the existing 18" Dia. LTWD - CWCWD transmission line at WCR 9 % and WCR 28 with 9 additional capacity available Therefore, we will commit to provide service to these residential lots via one standard residential 5/8" X 3/4" water tap per lot, with the following conditions : 1 . In August of 1993 the Little Thompson Board implemented P p a I'',: "system impact" fee of $1050 per lot for all lots to be added to the system. This is due upon completion of the main line i1 I extension agreement . I; 2 . All improvements to District facilities required to provide service will be the financial responsibility of the • developer in accordance with the District Rules and li ' Regulations . All improvements must conform to District 0, Specifications . 1,;�, 3 . Little Thompson Water District requires the transfer of one share of Colorado Big Thompson water for each lot in the commitment . The cost of this water is subject to rebate from the tap fees paid from the development . (F tii I. pi 'i r I,' (" 1J ils II i 4 . The installation of a fire hydrant requires payment of a $2, 000 fire hydrant fee prior to final approval of the II i subdivisions lines . ii' 5 . In order to provide the required minimum flows to the subdivision you will be required to install a minimum of a 12" Dia. water line connecting to the existing 8" connection along I�, WCR 28 at WCR 9 %. This connection will require construction „i of a metering/pressure reduction vault at WCR 28 & WCR 9 %. I 6 . You will also be required to provide the needed water !Il'I lines in the proposed subdivision. fif,, 7 . You will need to loop a minimum 12" Dia. Line from the Yrl existing 12" line along Hwy 66 south to your proposed subdivision to ensure that the fire flows will be available during peak hour demands on the water system. 8 . The design, installation and total cost of the project I will be the responsibility of the developer. It is possible that some of these required water lines and metering vault (WCR 28® WCR 9 ≤ )may be built or are being designed �, by other developers in the same area. If they are in place when you need them then you may be able to utilize them to serve your ` development ( subject to LTWD rebate policy) . It would be wise to {"'` work with the other developers in the area to ensure that the water I lines installed would be sized to meet the needs of both '• developments to reduce the amount of duplication , and minimize future water line replacement . I This commitment will expire one year from the date of this ,,.I letter if the taps have not been purchased and installed by that j' date. The current fee for the domestic 5/8" X 3/4" tap is $6, 000 . 00 The tap fee will increase to $7, 500 . 00 on July 1, 1999 . These fees I< area subject to change without notice . ut ji' If you have questions, please contact me in our office . ! Regards, If / , till% Michael T. Cook P. E. District Engineer I I' I iil 615 West 84!h Avenue Oervar, m)4� 541 Pone(303)427-8472 O0�)tax 1� 427-8-8542 MAST COMPANIES June 18, 1999 Little Thompson Water District Michael T. Cook,P.B.,District Engineer 835 East Highway 56,Drawer G Berthoud,Colorado 80513 Dear Mr. Cook: Thank you tor your Letter of Conunitment fin ow fu st pliaso conatruction nt RivorDanoe. As we discussed on the phone we are currently submitting a request for Change of Zone to the County.They have indicted that a commitment for the total project will be required. We would, therefore, request an additional commitment for the remaining property. I realize that commitment for the remaining property will required additional off-site improvements, which are subject.to cooperative efforts by the land owners in the area, and may change depending on figure negotiations We are planning to submit our request to Weld County on July 1, 1999 and appreciate your help. Thank you for your time and consideration Since c el , Sic ist P ident 'd sD: 9SdEOE 'ON :;b'= S311i;d1CO LSId9315 : :o. 188 cE-7: -Idfl: l #IITED POWER UNITED POWER, INC. P.O,BOX:929,BRIGHTON,CO 80801 TELEPHONE:(303)659-0551 I 1-800.486-8809 FAX(303)059.2172 nttpu/wv w.uniledpowor.00m Tune 23, 1999 Mr. Glen D.Blackburn, E.T. Tuttle Applegate, Inc. 11990 Grant Street, Suite 304 Denver,CO 80233 • Dear Mr. Blackburn: . SUBJECT: Riverdance Development • The purpose of this letter it to advise you that United Power is ready, willing and able to provide electric service to the proposed Riverdance Subdivision. United does have the capacity to serve the development. The developer will be assessed a portion of the off-site cost of an electrical line along the west side of the development. That electric line is currently being constructed in conformance with the CDOT project now under construction. In regard to the CDOT project, we are,in urgent need of the location and construction plans for the access to the subdivision from the I-25 Frontage Road. The access plans are critical to the location of our tap box from which to serve the subdivision. I look forward to working with you on the plans for Riverdance. Sincerely, UNITED POWER, INC. iata Bill Meier • 1-25 District Representative BM:mb A CONSUMER OWNED UTILITY USWEST 124 W. Magnolia Fort Collins, CO. 80524 June 15, 1999 Subject: Telephone facilities to planned / proposed development. Tuttle Applegate, Inc. Attn: Glen D. Blackburn, E. I. USWEST will provide service to your planned / proposed development, Riverdance Subdivision formerly known as Waterside Subdivision. Provisioning the service will be in accordance with tariffs on file at the Colorado Public Utilities Commission. I will need a final plat with measurements, easements, addresses, your phasing plan, and a trench plan before I can have this engineered. If there are any further questions, or if I can provide any assistance, please contact me on 970-224-7550. Sincerely, i r Carole A. Veysey Land Development Engineer KN Energy, Inc. 323 5th Street ENERGY PO.Box 437 Frederick,CO 80530-0437 (800)563-0012 June 24, 1999 Tuttle Applegate, Inc. Re: Riverdance Subdivision 11990 Grant St. Suite 304 Denver, CO 80233 To Whom It May Concern, This letter is in reference to the recent inquiry regarding the availability of natural gas to Riverdance development located north and adjacent to the St. Vrain Creek, and two miles north of State Highway 119, and east and adjacent to Interstate 25. KN Energy pipelines could provide an adequate supply of natural gas for your present projected load demand and will service the development. It is the desire of KN Energy to serve new and existing developments in our service territories and we look forward to helping you in any way we can. As your project progresses please allow us to provide you with any additional information necessary. You may rely on us to provide you with exceptional quality for your utility and service needs. Please do not hesitate to contact me with any questions you may have. Thank you for the opportunity to serve you. Sincerely, Ted Willden (303) 833-3313 ext. 21 RECEIVED 1999 Hello