Loading...
HomeMy WebLinkAbout990710.tiff EEC EARTH ENGINEERING CONSULTANTS, INC. November 13, 1998 Del Camino Junction Development, Inc. 1750 6`h Avenue Greeley, Colorado 80631 Attn: Mr. John Coppom Re: Subsurface Exploration Report Del Camino Business Park Weld County, Colorado EEC Project No. 1982110 Mr. Coppom: Enclosed, herewith, are the results of the geotechnical subsurface exploration you requested for the referenced project. In summary,the subsurface soils encountered at the site consisted of stiff to very stiff lean clay with varying amounts of silt and sand underlain by medium dense to dense granular and essentially granular soils. The low plasticity cohesive soils extended to depths of 2 to 6 feet below present site grades. Based on materials observed at the boring locations, it is our opinion the anticipated lightly loaded structures could be supported on conventional footing foundations bearing in the near surface cohesive and granular soils. The near surface cohesive soils showed low potential for volume change with variation in soil moisture content. It is our opinion those soils can be used for direct support of slab-on-grade floors and site pavements. Preliminary geotechnical recommendations concerning design and construction of foundations and support of floor slabs and pavements are presented in the text of the attached report. CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 104 FORT COLLINS, COLORADO 60526 (970) 224-1522 (FAx) 224-4564 990710 Earth Engineering Consultants,Inc. EEC. Project No. 1982110 November 13, 1998 Page 2 We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the enclosed report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. iciaA Jam. Cod` ri v.pt Michael J. Coley, E.I.T. Project Engineer Reviewed���ilouauma,,,,�se 23 �L Lester L. Litton, P.E. Principal Engineer MJC/LLL/dmf cc: Gary Tuttle - Tuttle Applegate, Inc. SUBSURFACE EXPLORATION REPORT DEL CAMINO BUSINESS PARK WELD COUNTY, COLORADO EEC PROJECT NO. 1982110 November 13, 1998 INTRODUCTION The geotechnical subsurface exploration for the Del Camino Business Park in Weld County, Colorado, has been completed. Twelve (12) soil borings extending to depths of approximately 15 feet below present site grades were advanced within the development area to obtain information on existing subsurface conditions. Individual boring logs and a diagram indicating the approximate boring locations are included with this report. Additional borings were advanced along the east Interstate 25 frontage road and Weld County road 24'1 to develop subsurface information regarding pavement designs for the proposed improvement of those roadways. The logs of those borings with the associated laboratory results and pavements recommendations have been reported under separate cover. The Del Camino Business Park will be constructed at the northeast corner of the intersection of the east Interstate 25 frontage road and Weld County Road 24 (Colorado State Highway 119) in Weld County, Colorado. Specific building designs were not completed at the time of this exploration; however, we anticipate the site structures will include one and two-story office or retail structures with light foundation and floor slab loads. Site access streets as well as paved drive and parking areas will be developed along with installation of site utilities. Small cuts and fills are expected to develop final site grades. The purpose of this report is to describe the subsurface conditions encountered in the borings. analyze and evaluate the test data and provide geotechnical recommendations concerning the proposed site development and preliminary geotechnical recommendations concerning building foundation and floor slab support. Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 2 EXPLORATION AND TESTING PROCEDURES The boring locations were selected and established in the field by representatives of Earth Engineering Consultants, Inc. The boring locations were established in the field by pacing and estimating angles from identifiable site references. The boring locations should be considered accurate only to the degree implied by the methods used to make the field measurements. The borings were performed using a truck mounted, Diedrich D-50 drill rig equipped with a hydraulic head employed in drilling and sampling operations. The boreholes were advanced using 4-inch nominal diameter continuous flight augers and samples of the subsurface materials encountered were obtained using split-barrel and California barrel sampling procedures in general accordance with ASTM Specification D-1586. In the split-barrel and California barrel sampling procedures, standard sampling spoons are driven into the ground by means of a 140 pound hammer falling a distance of 30 inches. The number of blows required to advance the samplers is recorded and is used to estimate the in-situ relative density of cohesionless soils and, to a lesser degree of accuracy, the consistency of cohesive soils. In the California barrel sampling procedure, relatively undisturbed samples of the subgrade materials are obtained in removable brass liners. All samples obtained in the field were sealed and returned to the laboratory for further examination,classification and testing. Moisture content tests were completed on all recovered samples. In addition, the unconfined strength of appropriate samples was estimated using a calibrated hand penetrometer. The quantity and plasticity of fines were evaluated in selected samples using washed sieve analysis and Atterberg limits tests. A particle grain size analysis was performed on one of the essentially granular soil samples. Swell/consolidation testing was completed on selected samples to evaluate the soil's tendency to change volume with variation in moisture content. Results of the outlined tests are indicated on the attached boring logs and summary sheets. As a part of the testing program, all samples were examined in the laboratory by an engineer and classified in accordance with the attached General Notes and the Unified Soil Classification System based on the soil's texture and plasticity. The estimated group symbol for the Unified Soil Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 3 Classification System is shown in the appropriate column on the boring logs and a brief description of that classification system is included with this report. SITE AND SUBSURFACE CONDITIONS The Del Camino Business Park will be located immediately east of the east Interstate 25 frontage road and north of Weld County Road 24 (Colorado State Highway 119) in Weld County, Colorado. The project site is presently an open field. Site drainage is generally to the east with a difference in ground surface elevations across the site on the order 5 feet. Evidence of prior building construction was not observed on the site by EEC field personnel though there is presently a temporary dirt roadway across the site which serves as access to the gravel pit to the east of the site. Gravel mining operations are currently being conducted to the east and north of this site. An EEC field engineer was on site during drilling to evaluate the subsurface conditions encountered and direct the drilling activities. Field logs prepared by EEC site personnel were based on visual and tactual observation of disturbed samples and auger cuttings. Final boring logs included with this report may contain modifications to those field logs based on results of laboratory testing and evaluation. Based on the results of the field borings and laboratory testing, subsurface conditions can be generalized as follows. Approximately 6 to 9 inches of vegetation and/or topsoil was encountered at the ground surface at the boring locations. In all but two of the borings, the topsoil/vegetation was underlain by brown lean clay with varying amounts of silt and sand. The lean clay had consistencies of stiff to very stiff although occasional softer zones were observed. The cohesive soils were slightly plastic and showed low potential for swelling with increased moisture content. The site cohesive soils extended to depths of approximately 2 to 6 feet in the borings. The near surface cohesive soils were underlain by granular and essentially granular soils consisting of coarse sand and gravel with varying amounts of silt, clay and fine sand. At boring locations B-12 Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 4 and B-I5, the topsoil was underlain by sand with varying amounts of silt and clay. The granular and essentially granular soils were generally colored brown with some zones of rust color and exhibited relative densities in the range of medium dense to very dense, with one loose zone observed in boring B-10. The granular and essentially granular soils extended to the bottom of the borings at depths of approximately 15 feet below present site grades. The stratification boundaries indicated on the boring logs represent the approximate locations of changes in soil types; in-situ, the transition of materials may be gradual and indistinct. WATER LEVEL OBSERVATIONS Groundwater was observed in all borings at depths ranging from approximately 4 feet to 9 feet below present site grades. The groundwater levels were generally shallower along the western and southern portions of the site. Adjacent to the site both to the north and to the east are gravel pits that appeared to be running dewatering pumps. These dewatering operations would have affected the groundwater levels on the site. Once these gravel pit operations cease and the de-watering pumps are removed, the groundwater levels on the site will most likely rise. Fluctuations in groundwater levels can occur over time depending on variations in hydrologic conditions and other conditions not apparent at the time of this report. In addition, zones of perched and/or trapped water may be encountered in more permeable zones within the subgrade soils at times throughout the year. Perched water is commonly encountered in soils immediately overlying less permeable highly weathered bedrock. The location and amount of perched and/or trapped water can also vary over time depending on variations in hydrologic conditions and other conditions not apparent at the time of this report. Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 5 ANALYSIS AND RECOMMENDATIONS Foundations Based on the materials observed at the test boring locations, it is our opinion that conventional footing foundations could be used for support of lightly loaded commercial or retail structures on the site. We recommend those foundations extend through all existing topsoil and/or vegetation to bear in the natural, stiff to very stiff sandy lean clay or medium dense to dense essentially granular soils. A net allowable total load bearing pressure of 3,000 psf could be used for sizing footing foundations bearing in the natural stiff to very stiff cohesive soils or medium dense essentially granular soils. The net bearing pressure refers to the pressure at foundation bearing level in excess of the minimum surrounding overburden pressure. Total load should include full dead and live loads. Lower bearing pressures may be appropriate for the portions of the site where zones of soft material were encountered near the surface. Higher bearing pressures may be appropriate for foundations bearing on dense to very dense granular materials. We do not expect that a minimum dead load pressure would be required in the low swell potential materials. Exterior foundations and foundations in unheated areas should be located a minimum of 30 inches below final adjacent exterior grade to provide frost protection. Minimum footing widths may vary with the anticipated loads and expected type of construction. The total estimated settlement may also vary with the foundation design; however, is anticipated to be small for lightly loaded structures supported on conventional footings. Subgrade Preparation All existing vegetation and/or topsoil should be removed from beneath the floor slabs, pavements or other slabs-on-grade. After stripping and completing all cuts and prior to placement of any fill, Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 6 floor slabs or pavements, we recommend the in-place soils be scarified to a minimum depth of 9 inches, adjusted in moisture content and compacted to at least 95% of the material's maximum dry density as determined in accordance with ASTM Specification 13-698, the standard Proctor procedure. The moisture content of the scarified soils should be adjusted to be within the range of±2% of standard Proctor optimum moisture. Fill soils required to develop the floor slab or pavement subgrades should consist of approved, low-volume change materials which are free from organic matter and debris. Based on testing completed as a part of this project, it is our opinion the near surface sandy lean clay or essentially granular soils could be used as fill beneath the floor slabs or pavements. The fill materials should be placed in loose lifts not to exceed 9 inches thick, adjusted in moisture content as outlined for the scarified soils and compacted to at least 95% of standard Proctor maximum dry density. Care should be taken after preparation of the subgrades to avoid disturbing the subgrade materials. Materials which are loosened or disturbed by the construction activities or materials which become dry and desiccated or wet and softened should be removed and replaced prior to placement of the overlying floor slabs or pavements. The near surface soils may be subject to strength loss and instability when wetted. Positive drainage should be developed away from the proposed structures to avoid wetting the subgrades and bearing materials. Subgrades and bearing soils allowed to become wetted subsequent to construction can result in unacceptable performance. Pavement Subgrade/Pavements We estimate the R-value of the on-site cohesive subgrade soils would be approximately 10. We anticipate traffic on the site driveway parking lot would consist of low volumes of light vehicles including automobiles and light trucks. Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 7 Based on anticipated subgrade and traffic conditions, we recommend the pavement section for the site roadways consist of 3 inches of hot bituminous pavement overlying 6 inches of aggregate base. The hot bituminous pavement should be compatible with Colorado Department of Transportation (CDOT) requirements for grading C or CX. Aggregate base should be consistent with CDOT requirements for Class 5 or Class 6 base. An alternate pavement section may consist of 2.5 inches of hot bituminous pavement (grading C or CX) overlying 3 inches of "black base" (grading G). Roadways with heavier traffic volumes or use by heavier vehicles may require thicker pavement sections. Positive drainage should be developed across the pavements and away from the pavement edges to avoid wetting the pavement subgrades. Subgrades allowed to become wetted subsequent to construction can result in premature failure of the pavement section. Groundwater depth varied from approximately 4 to 9 feet at the time of the field borings. We expect the groundwater level may rise when dewatering is no longer occurring on adjacent properties. As a result, we recommend that no basements be constructed at this site. Other Considerations Due to the relatively high groundwater and silty, sandy near surface soils at this site, we anticipate that there may be potential for frost heave beneath the site roadways or exterior flatwork. Elimination of the frost heave potential would require overexcavation below the pavement and flatwork areas. We would be pleased to provide specific recommendations, if desired. GENERAL COMMENTS The analysis and preliminary recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information Earth Engineering Consultants, Inc. EEC Project No. 1982110 November 13, 1998 Page 8 discussed in this report. This report does not reflect any variations which may occur between borings or across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to re-evaluate the recommendations of this report. It is recommended that the geotechnical engineer be retained to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observations during earthwork and foundation construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of Del Camino Junction Development, Inc. for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. DRILLING AND EXPLORATION DRILLING & SAMPLING SYMBOLS: SS: Split Spoon- 13/8" 1.D.,2" O.D., unless otherwise noted PS: Piston Sample ST: Thin-Walled Tube -2" O.D., unless otherwise noted WS: Wash Sample R: Ring Barrel Sampler-2.42" I.D.,3" O.D. unless otherwise noted PA: Power Auger FT: Fish Tail Bit HA: Hand Auger RB: Rock Bit DB: Diamond Bit =4".N, B BS: Bulk Sample AS: Auger Sample PM: Pressure Meter HS: Hollow Stem Auger WB: Wash Bore Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where noted. WATER LEVEL MEASUREMENT SYMBOLS: WL : Water Level WS : While Sampling WCI: Wet Cave in WD : While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB : After Boring ACR: After Casting Removal Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the indicated levels may reflect the location of ground water. In low permeability soils, the accurate determination of ground water levels is not possible with only short term observations. DESCRIPTIVE SOIL CLASSIFICATION PHYSICAL PROPERTIES OF BEDROCK Soil Classification is based on the Unified Soil Classification DEGREE OF WEATHERING: system and the ASTM Designations D-2488. Coarse Grained Slight Slight decomposition of parent material on Soils have move than 50% of their dry weight retained on a joints. May be color change. #200 sieve;they are described as: boulders, cobbles,gravel or Moderate Some decomposition and color change sand. Fine Grained Soils have less than 50%of their dry weight throughout. retained on a#200 sieve;they are described as : clays, if they High Rock highly decomposed, may be extremely are plastic, and silts if they are slightly plastic or non-plastic. broken. Major constituents may be added as modifiers and minor HARDNESS AND DEGREE OF CEMENTATION: constituents may be added according to the relative proportions Limestone and Dolomite: based on grain size. In addition to gradation, coarse grained Hard Difficult to scratch with knife. soils are defined on the basis of their relative in-place density Moderately Can be scratched easily with knife. and fine grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff(CL); silty Hard Cannot be scratched with fingernail. sand,trace gravel, medium dense(SM). Soft Can be scratched with fingernail. CONSISTENCY OF FINE-GRAINED SOILS Shale, Siltstone and Claystone: Hard Can be scratched easily with knife, cannot be scratched with fingernail. Unconfined Compressive Strength, Qu, psf Consistency Moderately Can be scratched with fingernail. Hard 500 Very Soft Soft Can be easily dented but not molded with 500- 1,000 Soft fingers. 1,001 - 2,000 Medium Sandstone and Conglomerate: 2,001 - 4,000 Stiff Well Lapable of scratching a knife blade. 4,001 - 8,000 Very Stiff Cemented 8,001 - 16,000 Very Hard Cemented Can be scratched with knife. RELATIVE DENSITY OF COARSE-GRAINED SOILS: Poorly Can be broken apart easily with fingers. Cemented N-Blows/ft Relative Density 0-3 Very Loose 4-9 Loose 10-29 E E C Medium Dense 30-49 Dense 50-80 Very Dense 80+ Extremely Dense SIDED SOIL CLLASSIDF7[CATION SYSTEM Soil Classification Group Group Name Criteria for Assigning Group Symbols and Group names Using Laboratory Tests Symbol Coarse—Grained Gravels more than Clean Gravels Less Soils more than 50% of coarse than 5% fines Cu>4 and <Gc<3` GW Well—graded gravel` 50% retained on fraction retained No. 200 sieve on No. 4 sieve Cu<4 and/or 1>Cc>3` GP Poorly—graded gravel` Gravels with Fines Fines classify as ML or MH GM Silty gravel, G,H more than 12% fines Fines classify as CL or CH GC Clayey Gravel"" Sands 50% or Clean Sands Less Cu>6 and 1<Gc<3` SW Well—graded sand' more coarse than 5% fines ` fraction passes Cu<6 and/or 1>Cc>3 SP Poorly—graded sand' No. 4 sieve Sands with Fines Fines classify os ML or MH SM Silty sand`' more than 12% fines Fines classify as CL or CH SC Clayey sand`"' Fine—Grained Silts and Clays inorganic PI>7 and plots on or above "Aline') CL Lean clay"'`" Soils 50% or Liquid Limit less more passes the than 50 PI<4 or plots below "Alined ML Silt"'`" No. 200 sieve organic Liquid Limit — oven dried Organic clay",k"N <0.75 OL Liquid Limit — not dried Organic silt K.1." Silts and Clays inorganic PI plots on or above "A"Line CH Fat cloy wx'm Liquid Limit 50 or more PI plots below "A"Line MH Elastic SiltC".1 organic Liquid Limit — oven dried Organic clay1.1.1" <0.75 OH Liquid Limit — not dried Organic silteLes Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat "Dosed on the material passing the 3-'in (75— (03a) if soil contains 15 to 29%plus No. 200, add mm) sieve `Cu=Dfi°/0,Cc= D x D with sand" or 'with gravel', whichever is °If field sample contained cobbles or boulders, predominant. or both, odd "with cobbles or boulders, or both' 4f soil contains 2 30" plus No. 200 to group name. "If soil contains 215% sand, add"with sand"to predominantly sand, add "sandy to group °Gravels with 5 to 12% lines required dual group name. name. symbols: elf fines classify as CL-ML, use dual symbol "If soil contains 2 30% plus No. 200 ow-CM well graded gravel with silt GC-CM, or SC-SM, predominantly gravel, add "gravely" to group GW-GC well-graded grovel with clay 'If fines are organic, add"with organic fines'to name. GP-CM poorly-graded grovel with silt "P124 and plots on or above "A" line. group name °P.54 or plots below "A" line. GP-GC poorly-graded grovel with cloy 'it soil contains >15%gravel, odd"with gravel" °Sands with 5 to 12% fines require dual o name. oI plots below "A" line. ' plots on or above "A" line. t symbols'. -0f At terrberg limits plots shaded area, soil is o P 5W-SM well-graded sand with silt CL-ML, cilty clay. SW-SC well-graded sand with cloy SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay 50. . ". _. For Classification of fine-grained mils • and fine-groned fraction of course- I • " grained soils . _ i _ _ __ IHorizontal f^-line " - - _ - ' _ ---- -Houofmt of o 3I(L- LL=2S.5. a,/r a-'1.11 c o J3(LL-2a) `�i e' loco xwen w-a =15one '�� ,�c QuaLon 40. Vertical of LL=I6 to PI.], (l______.. `P 9 ILL-13) i r V W G in i r • >- I •in 20 °P • MH o R0H a G io17 cL-ML M L oR 0L 00 - 10 t- 70 - 30 _40 . 50 50 70 80 90 100 LIQUID LIMIT (LL) / / - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - B-1 0/ Bea B-10 I 0 P-9.0? 88 7.0' B_9 5.5' 0 I - - I B-1 g P-3 ,p ' B_2 018014 Proposed Dri 4.0' Go �� I 8.5' 0 ( a 1 8-12 N I 0 8-17 B-8d v 8.0' I___ ____:IilIIIIIII: 0B-320 INI 8- 5P-46.0. 60. B 8-1re 7.0' cn 1 P-1 B-6 8-4 1 8 — 05 Frontage Road — — — — — — — X Interstate 25 V N NOT TO SCALE BORING LOCATION DIAGRAM Del Camino Business Park — Del Camino, Colorado PROJECT NO: 1982110 DATE: November 1998 EARTH ENGINEERING CONSULTANTS DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-10 RIG TYPE: DIEDRICH 0.50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/3/98 WHILE DRILLING 7.0' AUGER TYPE: 4"CFA FINISH DATE 11/3198 AFTER DRILLING 7.0' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION o N DU MC 00 A-LIMITS 1-200 SWELL TYPE IFEETI IBLOWSIFT) (PSF) (%) (PCP) LL PI (%) PRESSURE X 500 PSF 6"TOPSOILNEGETATION _ — 1 SANDY LEAN CLAY(CL) _ _ brown 2 moderately stiff to soft _ _ 3 4 CS _ _ 5 5 5.7 COARSE SAND(SP) _ _ brown 6 loose to medium dense _ _ 7 B _9_ 5S 10 35 8.3 I-1 COARSE SAND AND GRAVEL(SP/GP) _ _ brown 12 dense _ _ 13 1-4 15 BOTTOM OF BORING 15 0' _ _ 16 1-7 1-8 1-9 2-0 21 22 2-3 24 2-5 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-11 RIG TYPE: DIEDRICH D-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4198 WHILE DRILLING 8.0' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING 6.0' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR 6.0' SOIL DESCRIPTION D N OU MC DD ALMITS I3W SWELL TYPE (FEET) (BLOWS/F11 (PSF) PS) (PCF) LL PI 1%) PRESSURE %@ 500 PSF 6"TOPSOILNEGETATION _ _ 1 SILTY LEAN CLAY WITH SAND(CL) _ _ brown 2 stiff _ _ 3 _4_ 5S -5 38 6.4 SAND(SP) _ _ brown 6 dense _ _ 7 -8 _9 SANDY LEAN CLAY(CL) SS 1-0 5 '2000 23.1 brown _ _ stiff to soft 11 COARSE SAND AND GRAVEL(SP/GP) 12 brown _ _ dense 13 14 SS 1-5 50/7" 14.7 BOTTOM OF BORING 15.5' 16 1-7 NOTE. INSTALLED PIEZOMETER#1 _ _ 18 1-9 2-0 2-1 2-2 2-3 2-4 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING 8-12 RIG TYPE: DIEDRICH D-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING 8.0' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING 8.0' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION 0 M OU MC DO ,VOMITS -200 SWELL IT✓PE (FEET) IBLOWS/FT) (PSF) (%) IPCrl LL PI (%) PRESSURE M@1 SOO PSF 6"TOPSOILNEGETATION _ _ SILTY SAND AND GRAVEL(SM/GP) _ _ brown 2 dense 3 _4_ SS -5 50 2.6 COARSE SAND AND GRAVEL(SP/GP) -6 brown _ dense 7 8 -9 SS 1-0 50/8" 9.6 1-1 1-2 1-3 1-4 1-5 BOTTOM OF BORING 15.0' 16 1-7 1-8 1-9 2-0 2-1 2-2 2-3 2-4 2-5 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-13 RIG TYPE: DIEDRICH 0-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING 9.0' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING 9.0' SPT HAMMER: MANUAL SURFACEELEV NIA 24 HOUR 9.0' SOIL DESCRIPTION U N OU MC DO ALMITS .200 SWELL I TYPE (FEET) (BLOWSIFT) (PSF) I%I IPCF( LL PI (%) PRESSURE %e 600 PSF 6"T0PS0ILNEGETATI0N _ _ 1 SANDY LEAN CLAY(CL) _ _ brown 2 stiff _ _ 3 4 CS _ _ 34 *9000+ 4.6 5 SAND WITH GRAVEL(SP) -6 grey/brown _ _ dense to very dense 7 -8 '9— SS 1-0 50/9" 7.8 1-1 1-2 13 1-4 1-5 BOTTOM OF BORING 15 5' 1-6 NOTE INSTALLED PI`_ZOMETER#2 17 18 I-9 2-0 2-1 22 2-3 2-4 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-14 RIG TYPE: DIEDRICH O.50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/95 WHILE DRILLING 8.5' AUGER TYPE: 4"CFA FINISH DATE 1114/95 AFTER DRILLING 8.5' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION o N 0u MC 00 A-LIMITS .200 SWELL (TYPE (FEET) (SLOWS/FT) (PSF) (%) (PCF) LL PI (%I PRESSURE %4Q 500 PSF 6"TOPSOILNEGETATION _ _ 1 SANDY LEAN CLAY(CI.) _ _ brown 2 stiff _ _ 3 4 C$ _ _ 26 '9000+ 9.5 5 COARSE SAND AND GRAVEL(5P/GP) _ _ brown/rust 6 medium dense to dense _ _ 7 8 _9_ S$ 1-0 50/9" 7.4 1-1 1-2 13 1-4 1-5 BOTTOM OF BORING 15 0' _ _ 16 1-7 1-8 1-9 2-0 21 2-2 2-3 2-4 2-5 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-15 RIG TYPE: DIEDRICH 0.50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4198 WHILE DRILLING 8.0' AUGER TYPE: 4"CFA FINISH DATE 1114/98 AFTER DRILLING 8.0' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N 00 MC DD A-LIMITS -WO SWELL ITVPE (FEET) (BLOWSIFT) IPSFI 1%) IPCFI LL PI 1%I PRESSURE %2 S00 PSF 6"TOPSOILNEGETATION _ _ 1 SILTY SAND AND GRAVEL ISM/GP) _ _ brown 2 medium dense to dense _ _ 3 _4 SS -5 50/7" 5.4 6 COARSE SAND AND GRAVEL(SP/GP) _ _ brown T very dense _ _ 8 _9_ SS 1-0 50/8" 7.6 11 12 1-3 1-4 15 BOTTOM OF BORING 15.0' 16 17 1-8 19 20 2-1 2-2 2-3 2-4 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B-16 RIG TYPE: DIEDRICH 050 SHEET I OF I WATER DEPTH FOREMAN: MJC START DATE 11/4198 WHILE DRILLING 0.5' AUGER TYPE: 4"CFA FINISH DATE 11/4198 AFTER DRILLING 4.5' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION o N OD MC DD A-MMITS .200 SWELL [T YPE IFEETI IMLOWLFTI (PSF) (1:) (PCF) U. PI I%) PRESSURE N.@ 500 PSF 6"TOPSOILNEGETATION _ _ 1 SANDY LEAN CLAY(CL) _ _ brown 2 stiff _ _ 3 _4_ COARSE SAND WITH GRAVEL(SP) _ _ brown/rust SS 5 43 7.9 dense to very dense _ _ 6 _T_ -8 _9 $5 1-0 5018" 8.1 11 1-2 1-3 1-4 1-5 BOTTOM OF BORING 15.0' 16 1-7 1-8 1-9 20 2-1 2-2 23 2-4 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER1996 LOG OF BORING B-17 RIG TYPE: DIEDRICH 0.50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING 5.5' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING 5.5' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION 0 N au MC DO A-OMITS -200 SWELL [T YPE (FEET) ISLOWS/FT) IPSFI I%/ (PEE) LL PI (%) PRESSURE % 600 PSF 6"TOPSOILNEGETATION _ _ 1 SANDY LEAN CLAY(CL) _ - brown/rust 2 stiff _ _ 3 4 CS _ _ 26 5 COARSE SAND AND GRAVEL(SP/GP) _ _ brown/rust 6 medium dense to dense _ _ 7 B -9 SS 10 44 13.5 1-1 1-2 1-3 1-4 15 BOTTOM OF BORING 15.0' 16 17 1-8 19 20 21 2-2 2-3 24 2-5 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER1998 LOG OF BORING 8-18 RIG TYPE: DIEDRICH D-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING 5.5' AUGER TYPE: 4-CFA FINISH DATE 11/4/98 AFTER DRILLING 5.5' SPT HAMMER: MANUAL SURFACEELEV N/A 24 HOUR N/A SOIL DESCRIPTION 0 N 09 Mc DD A-UMITS -200 SWELL ITVPE (FEET) (BLOWS/FT) IPSF) (%) (PCF) LL PI (%) PRESSURE %e 5W PSF 6"TOPSOIWEGETATION _ _ 1 SANDY LEAN CLAY(CL) _ _ brown 2 very stiff _ _ 3 -4 CS _ _ 38 19.5 5 6 _T_ COARSE SAND AND GRAVEL(SP/GP) _ _ rust/brown 8 very dense _ 9 SS 10 50 11.7 I-I 1-2 1-3 1-4 1-5 BOTTOM OF BORING 15.0' _ 16 1-7 18 19 20 2-1 2-2 23 24 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER1998 LOG OF BORING B-19 RIG TYPE: DIEDRICH D-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4198 WHILE DRILLING 4.0' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING 4.0' SPT HAMMER: MANUAL SURFACEELEV N/A 24 HOUR 4.0' SOIL DESCRIPTION o N MU MC OD A-UMITS I-200 SWELL TYPE (FEET) (RLOWNFTI (PST) (%) IPCFI LL R 5%) PRESSURE %t 600 PST 9"TOPSOILNEGETATION _ _ 1 SANDY LEAN CLAY IC L) 2 brawn _ _ 3 _4_ CS _ _ 18 S -6 _ _ COARSE SAND AND GRAVEL(SP/GP) _ _ rust/brown a very dense - - 9 SS 1-0 4218" 8.2 _11 12 1-3 1-4 1-5 BOTTOM OF BORING 150' _ _ 16 NOTE. INSTALLED PIEZOMETER#3 - 17 18 1-9 2-0 2-1 2-2 2-3 24 25 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1996 LOG OF BORING B-20 SHEET 1 OF 1 RIG TYPE: DIEDRICH D-50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING 6.0' AUGER TYPE: 4'CFA FINISH DATE 11/4/98 AFTER DRILLING 6.0' SPT HAMMER: MANUAL SURFACEELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N 00 MC DO ALMIT8 -ZW SWELL ITYPE_(FEET) (BLOWS/FY) (PSF) (%) (POFI LL PI 1%) PRESSURE %e SW PEE 9"TOPSOILNEGETATION _ _ 1 SANDY LEAN CLAY(CL) -2 brown _ _ stiff to very stiff 3 4 55 -5 23 23.0 COARSE SAND AND GRAVEL(SP/GP) -6 brown _ _ medium dense 7 -B _9 SS 1-0 22 1-1 1-2 13 1-4 15 BOTTOM OF BORING 15 Cr 16 1-7 1-8 1-9 2-0 21 2-2 2-3 2-4 2-5 Earth Engineering Consultants DEL CAMINO BUSINESS PARK DEL CAMINO,COLORADO PROJECT NO: 1982110 DATE: NOVEMBER 1998 LOG OF BORING B.21 RIG TYPE: DIEDRICH 0.50 SHEET 1 OF 1 WATER DEPTH FOREMAN: MJC START DATE 11/4/98 WHILE DRILLING T.0' AUGER TYPE: 4"CFA FINISH DATE 11/4/98 AFTER DRILLING T.0' SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION 0 N OU MC DD A-LIMITS .200 SWELL I TYPE (FEET) IBLOWSFT) (PEF) (%) (PCF) LL PI (%) PRESSURE %q 500 PEE 9"TOPSOILNEGETATION _ _ SANDY LEAN CLAY(CO 1 brown _ _ 2 SILTY CLAYEY SAND(SM/SC) 3 brown _ _ medium dense 4 CS _ _ 26 '8000 15.2 23 T 34.4 5 6 _T_ a 9 COARSE SAND AND GRAVEL(SP/GP) _ _ brown SS 10 37 dense _ _ 11 12 1-3 1-4 1-5 BOTTOM OF BORING 15.0' 16 NOTE. INSTALLED PIEZOMETER#4 _ _ 17 18 1-9 2-0 2-1 2-2 2-3 24 25 Earth Engineering Consultants Hello