HomeMy WebLinkAbout970906.tiff 0 LEFT HAND WATER DISTRICT
May 31, 1996
Mr. Floyd Oliver
4250 W 16th St., Suite 46
Greeley, CO 80634
Re: Tap Request #1658
Dear Mr. Oliver:
This letter is to confirm our conversation of today in which you indicated your preference
for service to your subdivision by master meter, so as to recoup some savings for the dual
water system you plan to install. The committment we have made is to negotiate a
subdivision service agreement which includes a 1 1/2" master meter that will originally
serve 11 lots, and a temporary connection to our 16" line for fire service to your proposed
three hydrants.
Of course, any agreement to serve in any form is subject to approval of the service
agreement of some kind with the Left Hand Board of Directors. We look forward to
working out the details in the subdivision service agreement. Please let me know if you
need anything else.
Sincerely,
Day' . Sample, PE
District Engineer
EXHIBIT
I /0
P.O. Box 210 •Niwot CO. 80544•(303) 530-4200 • Fax (303) 530-5252
970906
t`�NITE0
POWER
UNITED POWER, INCORPORATED
P.O. BOX:929,BRIGHTON,CO 80601
TELEPHONE: (303) 659.0551 • 1-800-468.8809
FAX(303) 659-2172
May 30, 1996
Mr. Floyd Oliver
Real Estate Development Services
4250 W. 16th St #46
Greeley, CO 80634
Dear Mr. Oliver:
SUBJECT: Electrical Service to Meadow Vale Farm
United Power has reviewed the plans of the proposed Meadow Vale Farm residential subdivision
development. We stand ready, willing and able to provide and install electrical service to the
development.
The development will require an off-site line extension to reach the project entrance. The off-
site line will include relocating existing overhead lines as necessary to accommodate roads and
building sites.
The on-site line extension will be front lot construction. We will open the trench and install the
electrical line at approximately 48 inches in depth. Both phone and T.V. may follow in the
same trench.
The developer will be required to pay the full cost of installation of electric service in advance
of construction. The cost will include both material and labor expenses. The cost will also
include any extra expenses necessary for phone or T.V. such as street crossing sleeves, trenching
and coordination. Each lot is entitled to a refund of $785.00. The refund is a permanent
service construction allowance. The refund will be issued after each home is completed and
occupied by a resident.
A CONSUMER OWNED UTILITY
370906
Mr. Floyd Oliver
Page 2
May 30, 1996
We look forward to working with you on the development of Meadow Vale Farm. If you have
any questions, please let me know.
Sincerely,
UNITED INC.
///NI Gt
Bill Meier,
I-25 District Representative
BM:mb
970906
Hello