HomeMy WebLinkAbout810661.tiff ti Yr, 1Th
RESOLUTION
RE: APPROVAL OF REIMBURSEMENT TO GREAT WESTERN RAILWAY FOR
COST OF CROSSING ON WELD COUNTY ROAD 66, AT WINDSOR,
COLORADO.
WHEREAS, the Board of County Commissioners of Weld County,
Colorado, pursuant to Colorado statute and the Weld County Home
Rule Charter, is vested with the authority of administering the
affairs of Weld. County, Colorado, and
WHEREAS, the Weld County Engineer has submitted the
estimate for reimbursement to Great Western Railway for the
cost of re-building the crossing on Weld County Road 66, at
Windsor, Colorado and
WHEREAS, the estimated reimbursement cost determined by
Great Western Railway for the complete replacement is $11, 318. 00,
and
WHEREAS, the Board deems it advisable and in the best
interest of Weld County to approve said reimbursement.
NOW, THEREFORE., BE IT RESOLVED by the Board of County
Commissioners of Weld County, Colorado that the reimbursement
in the amount of $11, 318. 00 to Great Western Railway for the
cost of re-building the crossing on Weld County 66 at Windsor,
Colorado, be and hereby is, approved.
The above and foregoing Resolution was, on motion duly
made and seconded, adopted by the following vote on the 6th
day of July, A.D. , 1981.
BOARD OF COUNTY COMMISSIONERS
i /- WELD /CIOOUNTYY,, COLORADO
ATTEST:'? ic2J. '&A(A4tc,d ��/�l:re_ (Aye)
0 Ch cl Cariso , Chairman
Weld dbunty Clerk and Recorder
and Clerk to t oard dy.4....._ (Nay)
C / Norman Carlson, Pro-Tem
BY (/
Deputy ounty Clerk (A e)
C. W. Kirby
iLERO V D AS TO FORM:
{///[, � 7 (A e)
//yy e,. v eeoea � n T. Marten
county Attorney
e)
Eris une K. St nmark
W
DATE PRESENTED: JULY 8, 1981
502: 066
810661
418 -P k eird)c, 7,ty.,,,5"c 7
eGoo Ito
�l1ITIEMORRnDUill
.
r.:
To Weld County Commissioners Date June 29, 1981
COLORADO From Wayne Smyth, Director of Engineering
Subject: Reimbursement to Great Western Railway for Cost of Crossing on
Weld County Road 66
The Great Western Railway Company has submitted the attached letter to us
indicating their estimate of the cost of re-building the crossing at Weld
County Road 66 at Windsor. I have discussed the estimate with Mr. Andrews
of the Railway Company, who told me that it is their policy to completely
re-build the crossing, including providing the 115 lb. rails (in lieu of
the 90 lb. size) , as well as all the cross-ties under the intersection.
Their reasoning for this is that since they are responsible for the crossing
itself, they do not want to have to come back in and replace ties and rails
at a later date, should the crossing become rough or fail . The estimate
they have submitted of $11,318.00 is for complete replacement of the rails,
ties and associated hardware under the new crossing. They will do all the
work with their own crews and should the cost be less than anticipated,
they would bill us only for the actual cost. If the cost is greater than
anticipated, they, of course, would bill us for the actual cost, also.
I have discussed this matter both with the State Highway Department and our
County Attorney and they have both advised that in the case of putting a new
road over an existing railway crossing, we do not have a realistic alternative
to allowing the railroad to do their reconstruction prior to building the
road over the tracks.
In view of this, I can only recommend that the Board authorize reimbursement
of the railroad for the reconstruction described in their letter of June 10,
1981.
•
ayne S. S th
Director of Engineering
WSS:sd
cc: Clerk to the Board
t .sL j { R aw + '' 3,„ra3r ST
rl-1 id rA•"x .
� u ,,w t14a12e
VERS .
e Loveland Depot P.O. Box 537
Loveland,Colorado 8O537
R Byran Andrews Jr
JUN 191981
Vi,c W JD COUNTY
Exe tive Vice President ! 1
i!
& ral Manager 3 I
(30 8676883
Engineering e
June 10, 1981 t
Mr. Wayne S. Smyth
Director of Engineers
Weld County Colorado
Greeley, Colorado 80631
Dear Mr. Smyth
In reply to your letter of May 18, 1981 we enclose our estimate
of the cost of prepairing the track structure for asphalt at
Road 66 south of Windsor.
We plan to do this Job the last week of July so the ballast will
not be fouled by dirt and it can /be covered with asphalt as soon
as completed.
Sincerely
Byr F. Andrews, Jr.
BFA/ed
Enclosure
r
List of Material To Be Used
156' 115 RE New Industrial Grade Rail (Approx. 3 tons) @ $ 282/N.T. 846.00
41. Pr. 115 RE To 90RA New Compromise Joints @ 200/pr. 800.00
108; 115RE Relay Double Shoulder Tie Plates @ 3.00/ea. 324.00
4 115 RE Thermite Joints @ 59.25/ea. 237.00
54 7"x9"x9' Ties New @ 27.95/ea. 1 ,509.30
16 1"x64." Track Bolts New @ 1 .52/ea. 24.32
216} Track ,Spikes New @ .388/ea. 83.81
312 7"x9" Crossing Timbers (35 7"x9"x9' Ties New) @ 27.95/ea. 978.25
108;# Anchor Spikes for Crossing Timbers @ .2547/ea. 27.51
39 Ton Crushed Ballast 14" @ 7.50/ton 292.50
80 6" Purforated Steel Pipe @ 2.86/ft. 228.80
ii
II 45 6" Purforated Elbow (a 30.72/ea. 30.72
5iL 6" Pipe Coupling @ 2.86/ea. 14.30
5,396.51
15% Handling 809.48
3%Colo. Tax 161 .89
6,367.88
List of Material to be Released
156' (2.34 N.T.) 902 #1 Relay Rail @ 200/N.T. (468.00)
6''EPr• 902 Relay Angle Bars @ 12.00/pr. ( 72.00)
32I 1"x54" Track Bolts @ .07/ea. ( 2.24)
2161+ Track Spikes @ .06/ea. ( 12.96)
54 Landscape Quality Ties @ 4.00/ea. (216.00)
108 902 Relay Tie Plates @ I .65/ea. (178.20)
(949.40)
15% Handling 142.41
(806.99)
List of Labor in Crossing Project
At Weld County Road 66 & Colo. 257
64 Hrs. Section Foreman @ 7.6442/Hr. 489.23
64 Hrs. Crane Operator @ 6.25/Hr. 400.00
64 Hrs. Machine Operator & Asst. Section
Foreman @ 6.75/Hr. 432.00
64 Hrs. Section Laborer @-5:50/Hr. 352.00
48 Hrs. Locomotive Engineer @ 6.25/Hr. 300.00
48 Hrs. Work Train Conductor @ 5.50/Hr. 264.00
$2,237.23
Misc. Charges on Labor
Supervision 10% on $2237.23 223.72
Vacation Pay 3.64% on 2237.23 81 .44
Paid Holiday 3% on 2237.23 67.12
Sick & Accident 12.5% on 2237.23 279.65
R.R. Unemployment 8% on 2237.23 178.98
R.R. Supplement Retirement 14.5e ea. man hr. 51 .04
881 .95
Total on Labor 3,119.18
Total on Materials 5,560.89
64 Hrs. Hyrail Truck & Tools @ 2.35/Hr. 150.40
64 Hrs. Locomotive Crane @ 7.50/Hr. 480.00
3 Hrs. Loader @65.00/Hr. 195.00
8 Hrs. Tamper @37.50/Hr. 300.00
48 Hrs. Work Train @31 .53/Hr. 1 ,513.44
Total on Equip. 2,638.84
Grand Total 11 ,318.91
a
DEPARTMENT OF ENGINEERING
PHONE(303)356.4000 EXT.750
_ P.O. BOX 758
' GREELEY,COLORADO 80632
W LORADO
lig
July 16, 1981
Great Western Railway Company
P.O. Box 537
Loveland, Colorado 80537
Attention: Mr. Byron Andrews
Dear Mr. Andrews:
By resolution, the Board of Commissioners approved your proposal for
upgrading the track structure for asphalt at Weld County Road 66 south
of Windsor at an estimated total cost of $11,318.91.
As soon as the job is completed, it is requested that you forward your
invoice to us, attention this office, showing the actual cost for which
you wish to be reimbursed. It would be helpful to us if you submitted
it in the same format for which you used for the estimate.
Sincerely,
yne S. myth
Director of Engineering