HomeMy WebLinkAbout810693.tiff RESOLUTION RE: APPROVAL OF CHANGE ORDER FOR THE DESIGN OF WELD COUNTY ROAD 66 BY ARIX WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, on February 19 , 1980, Weld County and ARIX entered into an agreement concerning the design of a one-mile extension of Weld County Road 66 between State Highway 257 and Weld County Road 17, and WHEREAS, on June 18, 1980 , ARIX was directed to stop work on the project because the estimated construction costs were higher than anticipated, and in early July, 1980 , ARIX was directed to redesign the project along the north quarter. The work has been finished and the final plans are complete and indicate a substantial savings over the southern route, and WHEREAS, ARIX has requested payment beyond the contract in the amount of $3,479 . 99 , and WHEREAS, the Weld County Engineer has requested that a change order in the amount of $3,479 .99 be approved for payment to ARIX. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commis- sioners of Weld County, Colorado that the change order to ARIX in the amount of $3,479 . 99 be, and hereby is, approved. The above and foregoing Resolution was , on motion duly made and seconded, adopted by the following vote on the 16th day of March, A.D. , 1981. 6yi,"-vc. 7 CA, 44' i" BOARD OF COUNTY COMMISSIONERS ATTEST: �81� WELD COUNTY, COLORADO Weld County Clerk and Recorder � � (Aye) and Clerk to the Board C uck Carls , Chairman BY:s t -e ti� �-m,,..� ��,�. (W®) Deputy Co�nty Clerk ) Norman Carlson, Pro-Tem £PPRO D AS TO FORM: (ABSENT) C. W. Kirby d n/ County Attorney 1r� -77:2/(61.21; (Aye) T. Martin dievinfici/ZW.el- StV Ye) K. Strk I 810697 v�( 3 . LPL DATE PRESENTED: MARCH 18, 1981 , c mEmORAnDUm WilkTo Weld County Boar&nf-Connissionerste March 13. 1981 COLORADO From Wayne S. Smyth_ Director of Engineering subject: Recommendation For Change to ARIX on Weld County Road 66 Design Cu February 19, 1980, ARIX entered into a contract with Weld County to design one (1) mile of extension of Weld County Road 66 between State Highway 257 and Weld County Road 17. In accordance with our contract, ARIX examined three (3) alternative routes within a quarter outlined by the County. They presented the three (3) routes to the County at a meeting held on April 29, 1980, and were directed to proceed on an alignment south of the Whitney Ditch. ARIX completed the preliminary engineering and estimates on that southern alignment. On June 13, 1980, ARIX was directed to stop work on the pro- ject because the estimated construction costs were higher than anticipated. At that time an alternate route north of the Whitney Ditch and consid- erably north of the section line was considered in order to avoid an area with poor soils and in turn reduce construction costs. In early July, 1980, ARIX was directed to redesign the project along the north quarter. That work has been finished and the final plans are complete and indicate a substantial savings over the southern route. ARIX is requesting payment beyond our contract in the amount of $3,479.99 to cover the preliminary design cost on the southern route that was discarded and the extra surveying and investigation costs required by shifting the alignment to the northern route. This increase will amount to 11.5% increase over our original design contract. Considering the extra work required of the designer, this change order is considered to be a fair and equitable adjustment. It is recommended that the Board approve this change order. Wayne S. th Director of Engineering WSS:sd CC: Clerk to the Board C Neal Carpenter. A Professional Corporation simony N.Kent Barker Eugene GOreonw Brauer Engineers Architects Planners Gordo C.Dryer ARIX Robert J.C Shaw Dare J.Steiehen 2021 Clubhouse Drive Robert D.Thomas Post Office Box 2021 Gary R.N4Wolph Greeley,Colorado 80631 303 330 2749 February 19, 1981 Mr. Wayne Smyth Director of Engineering Weld County P.O. Box 758 Greeley, CO 80532 Dear Mr. Smyth: SUBJECT: WELD COUNTY ROAD 66, ARIX PROJECT NO. 80115.00 ARIX would like to request additional compensation on the design of the Weld County Road 66 project south of Windsor. This additional compensation is based on the work performed on the yellow line, that was south of the Whitney Ditch, from the meeting of April 29, 1980 (see memo) where the yellow line was approved by the County, to the June 18, 1980 letter from you stopping work on that alignment. Between these periods $2,348.77 worth of services was performed and then discarded. Also, additional survey work was required to accommodate the'northern shift of the roadway which required an additional $1 ,131 .22 to accomplish. This cost was arrived at by subtracting the total expended on the project accounting to the week ending May 2 , 1980, from the accumulative amount expended to the week ending June 13, 1980. All survey work after July 25, 1980 was included as survey cost. A tabulation of these costs are: Direct Hours Labor Overhead Expenses Total Accumulative cost to April 18, 1980 294.5 $2,128.45 $3,128.70 $ 439.00 $5,696.80 Period cost week ending April 25, 1980 6.0 73.36 107.84 -- 181 .20 • Period cost week ending May 2, 1980 23.3 203.59 299.27 -- 502.86 Total accumulative cost to May 2, 1980 $6,380.86 Total accumulative cost to June 13, 1980 417.8 3,235.49 4 ,755.94 738.55 $8,729.63 Mr. Wayne Smyth Page 2 February 19, 1981 Differences in Accumulative Cost $2,348.77 Survey Cost after July 25, 1980 $1 ,131 .22 Total Additional Fee Requested $3,479.99 If you have any questions or require additional information, please let us know. Respectfully, W 1 ARIIX�, �A � b •Professional 1a Corporation r / } V.S hc71 ("LAY Gerald F. Worrall , P.E. GFW/pt Attachments: Memo-April 30, 1980 Letter-June 18, 1980 Memo-July 25, 1980 M� f ,. A Proless ial Corporation Interoffice .,orrespondence ;. , Engineers Architects Planners MEMO TO: File DATE: April 30, 1980 FROM: Jerry Worrall SUBJECT: Weld County Road 66 Project No. 80 1 TRP 0115 Tuesday - April 29, 1980 Attending : County Commissioners - Norm Carlson Bill Kirby Director of Engineering - Wayne Symth Assistant Director of - Drew Shetinga Engineering I made a presentation of the Green, Red, and Yellow alignments . I told them the swampy area near the old Windsor sewer plant is eight feet of muck and would require removal . The swamp eliminated the Green alignment completely because of the high cost. The Red alignment is slightly more expensive and requires the construction of the Whitney ditch embankment which would be an undesirable feature. The Yellow line was recommended and they seemed to back that recommendation. Drew recommended that we use a typical section that is composed of a 24 foot pavement, 12 feet on both sides for future pavement , and an 8 foot shoulder. Where the pavement will be widened acceleration-deceleration lanes , he sug- gested a 4 foot shoulder. Try to obtain 4 to 1 for slopes • l k• t\ DEPARTMENT OF ENGINEERING 6N 13 1980 7,50 PHONE 1303) 3564000 EXT.rat g P.O. BOX 758 tinge Si m, GREELEY, COLORADO 80631 COLORADO June 18, 1980 Mr. Gerald F. Worrall ARIX 2021 Clubhouse Drive P.O. Box 2021 Greeley, Colorado 80632 Dear Mr. WorraZl: At a Work Session held June 18, 1980, the preliminary cost estimates you supplied for Weld County 66 were presented to the Board of Weld County Commissioners. As you know those costs are substantially higher than the Commissioners anticipated. A designation was not made to eliminate the project, but to place it on hold until further examination of available funds has been made. Therefore, you are directed not to proceed to the final design at this time. This is not to be considered as a notification of termination of the contract, but will be a delay. You will be notified in writing when to continue the work. If you have any questions, please contact me. SincereZ b yne S. Smyth Director of Engineering WSS:sad CC: Commissioner Bill Kirby pa,_..onal Corporation -a- Engineers Architects Planners 1e E . C U3 v Cr : MittAA-14 W:Ctif Lt''kst-"Aftc4 (2),,1/4,, r 0 a 1i) a,4d Bj— & Coto , 6W J kA it Q.. S44I t1/ D I�.J � lV X ;Aik/ �� 41 Kw ( O t1 t1- A 2\,-()R Pli it'fcr, Jcrj_ir ( t_Ut,)e,r,,,d ,(--) u I SST 0 (.. a -ice_ ( rr ( ( ) 1 4 (i),_ vN, n, _ 416i )(nIQ__ m , (\, \_.0 _ IA - I xt.t iykt 6031 t-g.slA (0,,JJ—tA,9 Acit* tAk. )11 9 --1J ct nO C5 ( C-Wra .0 C t`Qt 2ejjvtA 4-) ..,_-,i4re • • • • Page of Proj. No. Hello