Loading...
HomeMy WebLinkAbout800474.tiff RESOLUTION RE: AUTHORIZATION FOR CHAIRMAN TO SIGN APPLICATION FOR SITE APPROVAL OF NEW SEWAGE TREATMENT PLANT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, an application for site approval of new storage treatment plant for the Town of Windsor has been presented to the Board of County Commissioners of Weld County, Colorado, and WHEREAS, the Board of County Commissioners of Weld County, after hearing the favorable recommendations of the Planning Com- mission, deems it advisable and in the best interests of Weld County to authorize the Chairman of the Board of County Commis- sioners to sign said application. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado that the Chairman of the Board be, and hereby is, authorized to sign the application for site approval of new sewage treatment plant. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 19th day of March, A.D. , 1980. *,-y ft tir ` ` x BOARD OF COUNTY COMMISSIONERS ATTEST: ` 1 -''4 "''`^" , ` .xpxa"ti"/ WELD COUNTY, COLORADO Weld County Clerk and Recorder I 2t /2-LL (Aye) and Clerk to the Boar C. W. Kirby, Chairman Bp ( u cc. (.2.,-E, (Aye) • f' G,-,n,.ati L ; 1�1C uJ u��� _... \ Deputy County ¢ierk Leonard L. Roe, Pro-Tem � � /� APPRb.V AS TO FORM: ( (3..4. . (Aye) Norman Carlson County Attorney (Aye) L cj,Za Dunbar teAye) e K. Steinmark DATE PRESENTED: MARCH 26 , 1980 800474 /P1-0079 • i.CLOPADO CE?ARTMEITT OF E i,TH r?TE3 QUALITY CONTROL DI..SION 4210 East 11th Avenue Leaver, Colorado 30220 • APPLICATION FOR SITE APPROVAL OF NEW SEWAGE TREATMENT PLANT (Required if Serving More Than Twenty Persons) (Submit in Duplicate) • Applicant: Town of Windsor Address: P. 0. Box 627 Windsor, Colorado 80550 A. Information Regarding Project Submitted for Review:- 1. Briefly describe on a separate sheet of paper the justification for locat- ing the sewage treatment works on this particular site. This should include, but is not necessarily limited to, a description of the present and possible development of the site location and service area. SEE VICINITY MAP ATTACHED; EXISTING SITE 2. Size and type of treatment facility proposed: GPD:1.5 x 106 PE served: 157 000 % Industrial: 0 (Gal/day) (Population ecuivalent) % Domestic: 100 Proposed class of facility: B, Class of operator required: B1 3. Location of facility: Map - See 'Attached • Attach a map of the area which includes the following: (a) • 25-mile radius: all sewage treatment works; • (b) 5-mile radius: domestic water supply intakes; (c) 1-mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Wastes will be discharged to: Watercourse Poudre River (Name of watercourse) Classification of watercourse B1 Subsurface disposal N/A Land N/A Evaporation N/A Other N/A 5. If the discharge is to a watercourse, what is the waste load allocation for that watercourse? N/A; Effluent limiting That is the re,na4,1i..g wastelcad allocation uncommitted in the basin? (See 303(e) and 208 Plans) N/A WQCC approved 1/77 WQ-3 (rev. 3-77-40) . rte\ 6. Does your proposed facility require lift static.. , anywhere in the plant or service area?. N/A 7. What is the zoning for the proposed service area? N/A • Present zoning of site area? Existing pond site Zoning within a 1-mile radius of site? Agricultural/Industrial Please explain zoning: N/A 8. What is the distance downstream from the discharge to the nearest dcrest_c water supply intake? None Owner and address: N/A What is the distance downstream from the discharge to the nearest non- - domestic water supply intake? Five miles Name and address: Greeley #3 Greeley Irrigation Company; Greeley, CO 80631 • 9. Sewer lines: Approximate nrm."Pr of feet: N/A Sizes: 10. Who has the responsibility for operating the facility? Town of Windsor What is the legal status of the responsible party? Town; Colorado 11. Who owns the land upon which the facility will be constructed? Town of Windsor Please attach copies of the document creating authority in the applicant to construct the proposed facility. N/A; Existing site 12. Estimated project cost: $250,000 • Who is financially responsible for the facility? Town of Windsor What is the method of finance? Revenue Bonds • WQCC approved 1/77 WQ-3 (rev. 3-77-40) —2— 13. Are there any major land developers involved in the development of the proposed service area? N/A Give the name, address, and percentage of service area developed by any person if that percentage of development is greater than 10 percent. N/A Of the total PE that you indicated in No. 2, how many of those PE's are presently existing? 7500 ; are presently committed? 9000 . How many PE's are proposed? 15000 14. Names and addresses of all water and sanitation districts within 5 miles of proposed wastewater treatment facility site and proposed service area: N/A • Attach separate sheet of paper if necessary. 15. What is the relationship of this facility to any Areawide (208) Plans or Basin (303(e) ) Plans? (Contact Planning Section, Water Quality Control Division.) Existing pond system modification to add aeration; 208 personnel review completed. 16. Is the facility in an area subject to flooding? Yes If so, what precautions are being taken? Existing site; diversion channel and Poudre River channel carry flood flows Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources? No If so, what is that designation? N/A 17. List other sites other than the proposed site that were considered. N/A; Existing site to be utilized 18. Are there any available laboratories for your use? Yes If so, give name and location of lab. Onsite laboratory facilities of Town WQCC approved 1/77 WQ-3 (rev. 3-77-40) -3- - 7 19. Attach proof that _ copy of this application wa. sent by certified mail to each of the following federal agencies, recuesting their comment. (a) United States Forest Service, Director of Watershed, Soils and Minerals Management, 11177 West 8th Avenue, Lakewood, CO 80225. (b) National Park Service, Office of Cooperative Activities, Rocky Mountain Regional Office, 655 Parfet Street, P. O. Box 25287, Denver, CO 80225. (c) Bureau of Land Management, State Director (911 Planning) , Room 700, Colorado State Bank Building, 1600 Broadway, Denver, CO 80203 Please note: These federal agencies do not need to to contacted if the site that is berg proposed bears no relationship to any of the lands, st=eams, lakes, or rivers operated by these agencies. The burden is on the applicant to show that the proposed site does not affect anything within the jurisdiction of these agencies. 20. Please attach proof of mailing to Director of State Parks, 1313 Sherman, Denver, CO 80203. The same criterion applies here as in No. 19. 21. Consulting engineer: M & I, Inc. • Address: 4710 South College Avenue, Fort Collins, CO 80525 Telephone: (303) 226-2323 22. ' Please include all additional factors that might help the water Quality Control Cemm4asion make an informed decision on your application for site approval. The Town is adding aeration facilities to existing ponds constructed in 1972. The proposed facilities have been reviewed by the Larimer-Weld C.O.G. , Weld, Co. (attached letter) , Colorado District Engineer and local officials. Date 3/4/80 Signature of Applicant TOWN OF WINDSOR WQCC approved .1/77 WQ-3(rev. 3-77-40) -4- B. SIGNATURE OF GOVERNMI..,TAL OFFICIALS The undersigned have reviewed the proposal for the location of the above-described wastewater treatment facility and recommend approval or disapproval in spaces provided below: Recommend Recommend No Date Approval Disapproval Comment Signature of Representative Local Government (Cities , Towns , and Sewer Districts) r� Board of County Dommissioners Lo e Autho y �� X ounty Pla Wing Agency Regional Planning Agency Council of Government C . Natural Hazards : Comments of State Geologist regarding possible natural hazards: Recommend approval : Recommend disapproval : Date: Signature ,J;CC approved 1/77 3 (rev. 3-77-40) -5- t / a. r F _ / 1 '� c { \ S ' { n F.W. fq�� `' Ek Q n a�� .� W i j u._ \� / �'J t •N W n ��I l �_ Vii' 1 4�FI .y,.. ..- �•� •" • I < O ^~ \ e7:-';',"',;10-. .1� tt `�_'T'h�. . i. .1 '�'i 4. 2 ge :t, __ ^ _-�. RI Cr.? 0 � Yr —j is••-iy re'Co g<; P� {(�t���� ' _ 2_ O� „ iris:) C C / GWIM.P/ffP I1. T ✓r f , vjaf _•FY V j t € � r S-, I , _..1„. .!,...c. ,, .... sz , , _ ii it,),.___.:2, _ � ' /-c .i k,-, , �i I ,P- : f / �- f'.p��� z U t „,__________-w.... ' I ,i ______!;,„%_,qq / J :.• {; a -_-� 7'J v� Jr./ .. p )�� I r 2 �M .r— _ _ :i L.• I • �,u --"' -1-f�_ M (5C { nc. %'/u-19 j C., JA 03 1980 DEPARTMENT OF PLANNING SERVICE �C PHONE (303)356-4000 EXT.4G g$,, I3\ 915 10TH STREEE 1q1BrD . 115- GREELEY,COLORADO 8063 COLORADO December 31, 1979 • John R. Clark, P.E. M & I Consulting Engineers 4710 South College Avenue Fort Collins , Colorado 80525 RE: Windsor Wastewater System Improvements Dear Mr. Clark: Based upon a review of the material submitted by you and the Weld County Zoning Resolution, it appears that there will not be a ✓ requirement to obtain a Special Use Permit for installation of aeration units to Cell 2. The Zoning Resolution indicates that a Special Use Permit is required for a sewage treatment facility. In addition, a Special Use Permit is required for any expansion or enlargement of a Special Use Permit. For sewage treatment facilities , expansion does not necessarily mean in increase of inflow/outflow of sewage and effluent. It has been determined that an expansion means an increase in inflow/outflow as a result of structural modifications to enlarge existing facilities other than that which occurs as normal maintenance. The Windsor facilities are being altered by placing a divider in an existing cell and placing an aeration unit in each cell. This manner of alteration is not a structural modification which enlarges the facility but rather, as a maintenance measure, allows the facility to be more efficient within its current design constraints. If you have further questions regarding this matter, please feel free to contact me. V my homas E. Honn Zoning Administrator Hello