Loading...
HomeMy WebLinkAbout20000186 From: Martha Schrepel <mschrepel@excelonline.com> To: c harding <charding@co.weld.co.us> Date: 1/24/00 8:52am Subject: Docket#: 2000-04 I am Martha Schrepel, address: 6463 Highway 392, Windsor, Co. 80550. I am not against the Greenhouse/Garden Center, but I want to make sure my water pressure don't decrease, when they water the plants in the Greenhouse, because we both share the same water line. I lived North of their place. Also, we share the same driveway and I do not want their customers to drive by my place. Pat and Amanda Weakland are thinking about putting a gate down by the Highway 392 on the driveway, I want to have several keys, if they plan to lock the gate and have the gate far enough away from the highway so I won't block the traffic, when I am driving my _ , -, pickup and pulling my horse trailer. When I have to get out and open and close the gate. You will also receive a letter on these subjects from Wolfe and Masid, attorneys on my behalf. I hope you can understand this letter. -- • Thank you T Martha Schrepel in 70400-ol?6 g EXHIBIT F 1.152 4125°) r sae° a�CALL n1E MIIPt Of ealleale a SY'- 11ni ��of .air AMIS wat�s�rw-� u „ iw►ws 7/ /47) 4 EXHIBIT I.sSLZ,S1. 2000-0186 46t4r. MEMORANDUM 'ilk TO: Board of County Commissioners „ January 26, 2000 COLORADO From: Julie A. Chester, Lead Planner SUBJECT: New condition of approv I C The Department of Planning Services and Public Works are recommending the following condition of approval be added and numbered 2. I. 2. I. The applicant shall enter into an Improvements Agreement for on-site improvements to pave the approach road and parking area, according to Public Works standards. The improvements shall be completed within three years of approval of the Site Specific Development Plan and Special Review Permit. Ofkillillg:H MEMORANDUM TO: Julie Chester, Lead Planner DATE: January 25, 2000 WII FROM: Donald Carroll, Engineering Administrator ige.- C. SUBJECT: USR-1251; Pat Weakland COLORADO Windsor has annexed the adjacent property to the east. State Highway 392 has been identified in Windsor's Comprehensive Plan as a major arterial approach to the Town of Windsor and they are requesting the approach road and parking lot be paved. We feel it is just a matter of time before Windsor has incorporated this entire area. After the Planning Commission hearing, at the Town of Windsor's request, Public Works staff determined that the parking lot and approach road should be paved and should be at least 24 feet in width to accommodate two-way traffic. The parking lot should be paved as per the dimensions designated on the plat and have adequate striping. The overflow parking area could be a gravel surface and have aggregate base course compacted to accommodate all weather use. As an interim measure, Weld County will accept a gravel surface on the access and parking lot, provided the applicant enter into an Improvements Agreement with Weld County to pave the access and parking lot within three years of the site plan approval. The overflow parking area does not need to be paved. cc: USR-1251 plan4usr OeY- QV outy a� 5 JPN2 !vt SktCt 4 Ern IBIT IlaA /-257 Pa[1Si; nr, re",ce 1\1a o cr Q- t \ . \\ 4 %) I- m t 3 , \\, , d TI, 9J T .v" —a ts- C 7 1, .94� a vl d1 v] 8 --mss Q - 6 •"L. h, _' $ ' d ur- CT"' C 4 9) 3 a - X�, I t l 41 _ - - i Q, r _ 7 - - a ` 1 -.) 4,-) \\N„...; 4 ct) ' / / / / . / / - 7: / / 17----)'1-t*--- . %) I , t• 4 ? d - VI . �cL V 0 'Clo..• \ I 41 \ Cr � •� - r d v 1 r: ' Jam_... ,. (\r, \\ ' rf1513',J 6-. • . .... , • 11 �; IC\.I • 1 ''. , i,/ry r • CI. CV 1 ._ •' ~\ t `_'ti..-� v'-� - -•... r // "� .t �r f 4, if : A`;'1 -r„ • I7• , . I -.( I =,, .et )1 i ./ Hi ' Lill q, a _i 4, ,----- -,Jc---2,----- ', i\I I ((.. I \ 1 `" ti - , II 1 ___S \t, i f- ` . �... r..+- 1 .•_.mot _. n '` Windsor-Severance Fire Protection District MEMORANDUM OF UNDERSTANDING This agreement will be entered into and agreed upon by Patrick Weakland, address 6461 Highway 392, Windsor, CO, and Windsor-Severance Fire District, address 728 Main Street, Windsor, CO, the address of the proposed new facility and subject to this agreement shall be 6461 Highway 392, Windsor, CO. Patrick Weakiand wants to develop a commercial greenhouse facility at the above stated location. Currently there is not sufficient water supply to support fire protection requirements. Due to the cost of supplying sufficient water flow, reasonable alternatives of fire protection have been agreed upon until a permanent water supply source is available. Additionally, said plans must be submitted and approved by the district prior to installation. The alternative fire protection method for proposed buildings on site will require a NFPA 13 compliant sprinkler system with temporary water source (i.e. underground water vault). This alternative method must be in place prior to issuance of Certificate of Occupancy. Progress to this end will be reviewed at the 6 month and 15 month period. From the date of the Certificate of Occupancy issuance, Dr. Weakland will have 24 months to comply with below listed permanent requirements of the 1994 UFC: • Hydrant on site capable of 1000 GPM per 1994 UFC Appendix III A&B requirements • NFPA 13 system shall be connected to permanent municipal water system with required GPM and pressure per approval by district On or before the 24-month date the progress of the project will be reviewed. Should the aforementioned requirements not be meet, the following actions may be taken: Obtain 1: The occupancy permit should be withdrawn until the compliance is met Obtain 2: If it is shown circumstance beyond Dr. Weakland's control has prevented the completion of the requirements, a new compliance date may be negotiated. (Ake-% jsee. Patrick Weakland Ward Fire Chief %-96 CC) z4 7o-X Date to EX-Mint ph 970.686.9596 ea fa 970.686.9623 728 Main 'west tia Windsor,Colorado 80550 Hello