Loading...
HomeMy WebLinkAbout20002208.tiff MINUTES OF THE WELD COUNTY UTILITIES ADVISORY COMMITTEE A regular meeting of the Weld County Utilities Coordinating Advisory Committee was held on Thursday, March 9. 2000, at 10:00 a.m., in the Conference Room of the Weld County Administrative Offices at 1555 N. 17th Avenue, Greeley, Colorado. Members Present Jesse Trujillo U.S. West Communications Paul Gregg U.S. West Communications Mark Peterson St. Vrain Sanitation Jerry Adams Greeley Gas Cody Wooldridge Central Weld County Water District Gary Sandau La Salle Fire Protection District Don Carroll Public Works Also Present: Chris Gathman, Planner, Monica Daniels-Mika, Director, Department of Planning Services; Trisha Swanson, Secretary. CASE NUMBER: S-526 PLANNER: Chris Gathman APPLICANT: Lifestyle Homes LEGAL DESCRIPTION: Lot 3, Block 1, West Hill-N-Park, Section 26, Township 5 North, Range 66 West of the 6th P.M., Weld County, Colorado. LOCATION: 4648 Mesa Verde Drive, Hill-N-Park 4th Filing. REQUEST: Vacate a portion of the existing utility easement. Chris Gathman, Planner, presented Case S-526. Chris stated that Lifestyle Homes is requesting a change in the 15' utility easement to 12' along the east side of Lot 3, Block 1 of West Hill 'N' Park 4th Filinc. Chris stated that the house is constructed into 2' of the easement. The applicant has submitted petition signed by the surrounding property owners, as well as a petition signed by all the utility companies that use the easement. These petitions show support for the vacation of part of the easement. Tie Utility Board discussed the case and looked at the plat. Cody Wooldridge moved to vacate the 3' of easement along the east side of Lot 3, Block 1, Hill 'N' Park 4th Filing as all the affected utility companies have signed off their agreement with the vacation. Jerry Adams seconded the motion. Motion passed unanimously. CASE NUMBER: S-525 PLANNER: Monica Daniels-Mika APPLICANT: Beebe Draw Farms / Jim Fell LEGAL DESCRIPTION: Sections 3,4,5,8,9,10,15,16 and 17, T3N, R65W of the 6th P.M. Weld County, Colorado. LOCATION: Approximately 6 miles east of the Town of Platteville; east of WCR 39 and south of WCR 38. For a more precise location, see legal. REQUEST. PUD Final Plat for Beebe Draw 2nd Filing for 536 Lots Monica Daniels-Mika, Planning Director, presented Case S-525. Monica stated the history of the case as well as why it is being brought to the Utility Board at the final plat stage, rather than the zore change stage. Discussion ensued concerning the easements along the county roads, the use of environmental easements in conjuntion with utility easements, and utility easements along the open tracts (open spaces). The basic utility easement for the entire subdivision is 25'. The Utility Board discussed that all utility 2000-2208 easements shall continue at this same width. The easements need to be added on several areas of the plat. These are listed in the next few sentences. First, all interior roadways, including lots, tracts and open space areas must have a 25' utility easement. Next, all county roads shall have a 25' utility easement associated with their row. Third, a 25' utility easement must be placed along entire perimeter cf the filing. Finaly, there needs to be a 25' utility easement between filing one and filing two Also requested by the committee, the applicant shall modify the plat to show utility easements located in the tract areas (this is intended for utility placement to transcend through the large open space areas). On the final plat, the Utility Board requested the addition of the following in the notes on the plat: 1. 25' utility easements and placements shall be identified in the buffer/building setback area and 2. Existing note on page 3 of the utility plan shall include all of the areas identified as well as the additional utility easement areas requested by the utility board. Jesse Trujillo and Paul Gregg of U.S. West Communications will be setting up the areas requested for:he utility easements across the large tract areas. Cody Wooldridge moved to accept the plat for S-525 with the additions requested by the utility board at this meeting and when Don Carroll has given his approval of the changed plat. Jerry Adams seconded the motion. Motion carried unanimously. Respectfully submitted, Trisha Swanson Secretary I J L Walter Consulting 114 E. 5th Street Loveland, CO 80537 (970)613-2037 FAX (970) 203-1147 March 15, 2000 Department of Planning Services Weld County 1555 North 17th Avenue Greeley, CO 80631 RE: Water System for Filing II, Beebe Draw Farms Metropolitan District A potable water system has been designed and provided to Milestone Engineering to be included in the preliminary plan submittal to Weld County for the referenced project. This letter is to certify that this system has been prepared to a level that indicates the size of lines required to provide adequate flow for domestic use and fire protection based on the existing and proposed infrastructure of the water provider, Central Weld County Water District, and per the LaSalle Fire Protection District. The above referenced plans do not show the detail that will be required of anal drawin€s. including class of pipe and type. valves, fittings, fire hydrant locations, pressure reducing v aloe-,, blow-off, and appurtenances. The details will be added to final drawings prepared for each Phase of Filing II. Easements for the system are to be provided on the subdivision plat. If you have any questions regarding the above, please advise. Sincerely, w- Q 3 96,3/4'.,,r J.L...-Wn Cons • L ._.;:-.-`c .,:t?rsrEr,,:GC .*, 2 �' *mac-) . avid B. Sh e, P.E. ,, `•,", s 0,,,. ,r,>,..,,,, % r'n v ' _. Cc: Aaron Thompson, Milestone`+F,}� refril S1� Jim Fell, Beebe Draw Farms McWbpeiitertttstrict LIJ3 /EST life's better here US WEST 3351 Eastbrook Dr. Fort Collins, CO. 80525 May I, 2000 Subject: Telephone facilities to planned / proposed development. Attn: James Fell US WEST will provide service to your planned / proposed development, Beebe Draw Farms, Filing 2. Provisioning the service will be in accordance with tariffs on file at :he Colorado Public Utilities Commission. I will need a final plat with measurements, easements, addresses, your phasing plan, and a trench plan before I can have this engineered. If there are any further questions, or if I can provide any assistance, please contact me on 970-377-6406. Sincerely, Carole A. Veysey Land Development Engineer PUBLIC SERVICE COMPANY OF COLORADO ' r`/ A NEW CENTURY ENERGIES COMPANY Greeley Operations 1500 6th Avenue Greeley, Coloraco 80631 Telephone 970.395.1240 May 9, 2000 Facsimile 970.355.1 224 James W Fell 11409 W 17th Place Lakewood, CO 80215 Dear Jim, The Second Filing of BeeBe Draw Farms lies within the Service Territory that PSC currently has an Invasion Agreement with PVREA. Public Service has the capacity and facilities available to serve this Subdivision, in accordance with our service extension policy which is on file with the Colorado PIJC. and within the guidelines of the invasion agreement. If you have any other questions please give me a call at (970) 395-1207. Thank you, • Terr, E. Stencel Planner PSC GREELEY GAS COMPANY May 12, 2000 REI, LLC Jim Fell 11409 W l7`"Place Lakewood, Colorado 80215 RE: Greeley Gas Company plans to install a Natural Gas Main Extension to service each phasing plan for Pelican Lake Ranch/BeeBe Draw. Jim Fell: Greeley Gas Company will be able to serve natural gas to the proposed and planned phases of BeeBe Draw Subdivision by extending a natural gas main extension. The main extension design has been completed to provide the natural gas utility infrastructure to the next planned phases. Greeley Gas Company expect;to install the main extension as grade work and construction allows. A main extension contract will have to be signed and the deposit will have to be paid prior to the main extension installation. At the time of installation,the utility easements for this main extension should be to final grade and al IOW clear access to the easements. Property pins should be visible and clearly marked. All sleeves for crossing should be installed prior to the main extension installation as per drawings and specifications provided by Greeley Gas Company. o This main extension installation will need to follow the installation policy and procedures, and other applicable terms and conditions of service subject to the regulatory and pipeline safety oversight oftlh': CPUC -Public Utilities Commission of the State of Colorado. 0 0 if you have any questions, please telephone Chris McDermott at 970-304-2080. ,y CD c7 Sincere, 0 Chris McDermott Sales Representative Greeley Gas Company 0 0 U 0 CD U) uj 0 ID Hello