Loading...
HomeMy WebLinkAbout993076 APPENDIX D HCS : Signals Release 3 . 1b Inter: SH 119 City/St : Analyst : GC Proj # : Date: 12/9/99 Period: EX ST ( L) (Ay) PM E/W St : SH 119 N/S St : FRONTAGE ROAiY SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 2 3 0 1 3 0 2 2 1 1 2 1 LGConfig L TR L TR L T R L T R Volume 480 1040 850 170 660 140 200 290 220 135 290 560 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 215 35 55 140 Duration 0 . 25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P P SB Left P P Thru P P Thru P P Right P P Right P P Peds Peds NB Right P EB Right SB Right P WB Right Green 18 . 0 16 . 0 12 . 0 13 . 0 11 . 0 8 . 0 Yellow 0 . 0 0 . 0 4 . 0 0 . 0 0 . 0 4 . 0 All Red 0 . 0 0 . 0 2 . 0 0 . 0 0 . 0 2 . 0 Cycle Length: 90 . 0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound L 700 3502 0 . 72 0 . 200 41 . 8 D TR 1844 4882 0 . 98 0 . 378 32 . 6 C 34 . 6 C Westbound L 325 0 . 58 0 . 311 40 . 2 D TR 1579 5075 0 . 51 0 . 311 19 . 0 B 23 . 0 C Northbound L 506 3502 0 .42 0 . 144 40 . 6 D T 963 3610 0 .33 0 . 267 27 . 5 C 28 . 2 C R 754 1615 0 . 24 0 .467 15 . 2 B Southbound L 289 0 . 52 0 . 211 39 . 1 D T 762 3610 0 .42 0 . 211 32 . 5 C 25 . 9 C R 772 1615 0 . 57 0 .478 16 . 6 B Intersection Delay = 31 . 0 (sec/veh) Intersection LOS = C HCS : Signals Release 3 . 1b Phone : Fax: E-Mail : OPERATIONAL ANALYSIS Intersection: SH 119 City/State : Analyst : GC Project No: Time Period Analyzed: EX ST LT AM PM Date : 12/9/99 East/West Street Name : SH 119 North/South Street Name : FRONTAGE ROAD VOLUME DATA Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 480 1040 850 170 660 140 200 290 220 135 290 560 PHF 0 . 95 0 . 95 0 . 90 0 . 90 0 . 95 0 . 90 0 . 95 0 . 90 0 . 90 0 . 90 0 . 90 0 . 95 PK 15 Vol 126 274 236 47 174 39 53 81 61 38 81 147 Hi Ln Vol Grade 0 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ParkExist NumPark s Heavy Veh 0 0 0 0 0 0 0 0 0 0 0 0 No. Lanes 2 3 0 1 3 0 2 2 1 1 2 1 LGConfig L TR L TR L T R L T R Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 215 35 55 140 Adj Flow 505 1801 189 812 211 322 183 150 322 442 InSharedLn Prop Turns 0 . 39 0 . 14 NumPeds 0 0 0 0 NumBus 0 0 0 0 0 0 0 0 0 0 Duration 0 . 25 Area Type : All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 4 5 3 5 4 3 3 3 3 4 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 I 5 6 7 8 EB Left P NB Left P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P P SB Left P P Thru P P Thru P P Right P P Right P P Peds Peds NB Right P EB Right SB Right P WB Right Green 18 . 0 16 . 0 12 . 0 13 . 0 11 . 0 8 . 0 Yellow 0 . 0 0 . 0 4 . 0 0 . 0 0 . 0 4 . 0 All Red 0 . 0 0 . 0 2 . 0 0 . 0 0 . 0 2 . 0 Cycle Length: 90 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop . Prop . Appr. / Mvt Flow No. Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 480 0 . 95 505 2 L 505 Thru 1040 0 . 95 1095 3 TR 1801 0 . 39 Right 850 0 . 90 706 0 215 Westbound Left 170 0 . 90 189 1 L 189 Thru 660 0 . 95 695 3 TR 812 0 . 14 Right 140 0 . 90 117 0 35 Northbound Left 200 0 . 95 211 2 L 211 Thru 290 0 . 90 322 2 T 322 Right 220 0 . 90 183 1 R 55 183 Southbound Left 135 0 . 90 150 1 L 150 Thru 290 0 . 90 322 2 T 322 Right 560 0 . 95 442 1 R 140 442 * Value entered by user . SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Ad Lane Sat f f f f f f f f f Sat Group Flow W HV G P BB A LU RT LT Flow Eastbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 97 ---- 0 . 950 3502 TR 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 91 0 . 941 1 . 000 4882 Westbound Sec LT Adj /LT Sat : 0 . 250 475 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 950 1805 TR 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 91 0 . 978 1 . 000 5025 Northbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 97 ---- 0 . 950 3502 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 95 1 . 000 1 . 000 3610 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - -- 1615 Southbound Sec LT Adj /LT Sat : 0 . 557 1058 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 - -- - 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 95 1 . 000 1 . 000 3610 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - --- 1615 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green --Lane Group- - Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . Sec . Left L 505 3502 0 . 14 0 . 200 700 0 . 72 Thru TR 1801 4882 0 . 37 0 . 378 1844 0 . 98 Right Westbound Pri . 105 1805 0 . 06 0 . 133 241 0 . 44 Sec . 475 0 . 178 84 Left L 189 0 . 311 325 0 . 58 Thru TR 812 5075 0 . 16 0 . 311 1579 0 . 51 Right Northbound Pri . Sec . Left L 211 3502 0 . 06 0 . 144 506 0 . 42 Thru T 322 3610 0 . 09 0 . 267 963 0 . 33 Right R 183 1615 0 . 11 0 .467 754 0 . 24 Southbound Pri . 21 1805 0 . 01 0 . 089 160 0 . 13 Sec . 1058 0 . 122 129 Left L 150 0 .211 289 0 . 52 Thru T 322 3610 0 . 09 0 . 211 762 0 .42 Right R 442 1615 0 . 27 0 .478 772 0 . 57 Sum (v/s) critical = 0 . 00 Lost Time/Cycle, L = 0 . 00 sec Critical v/c (X) = 0 . 00 LEVEL OF SERVICE WORKSHEET Appr/ Ratios Unf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound L 0 . 72 0 . 200 33 . 7 1 . 054 700 0 . 50 6 . 3 0 . 0 41 . 8 D TR 0 . 98 0 . 378 27 . 6 0 . 595 1844 0 . 50 16 . 1 0 . 0 32 . 6 C 34 . 6 C Westbound L 0 . 58 0 . 311 32 . 8 1 . 000 325 0 . 50 7 .4 0 . 0 40 . 2 D TR 0 . 51 0 . 311 25 . 4 0 . 699 1579 0 . 50 1 . 2 0 . 0 19 . 0 B 23 . 0 C Northbound L 0 . 42 0 . 144 35 . 1 1 . 085 506 0 . 50 2 . 5 0 . 0 40 . 6 D T 0 . 33 0 . 267 26 . 6 1 . 000 963 0 . 50 0 . 9 0 . 0 27 . 5 C 28 . 2 C R 0 . 24 0 .467 14 .4 1 . 000 754 0 . 50 0 . 8 0 . 0 15 . 2 B Southbound L 0 . 52 0 . 211 32 . 6 1 . 000 289 0 . 50 6 .5 0 . 0 39 . 1 D T 0 . 42 0 . 211 30 . 7 1 . 000 762 0 . 50 1 . 7 0 . 0 32 . 5 C 25 . 9 C R 0 . 57 0 .478 16 . 9 0 . 799 772 0 . 50 3 . 1 0 . 0 16 . 6 B Intersection Delay = 31 . 0 (sec/veh) Intersection LOS = C SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 90 . 0 sec Actual Green Time for Lane Group, G 28 . 0 19 . C) Effective Green Time for Lane Group, g 16 . 00 11 . 00 Opposing Effective Green Time, go 34 . 0 24 . 0 Number of Lanes in Lane Group, N 1 1 Number of Opposing Lanes, No 3 2 Adjusted Left-Turn Flow Rate, Vlt 189 150 Proportion of Left Turns in Opposing Flow, Plto 0 . 00 0 . 00 Adjusted Opposing Flow Rate, Vo 1801 322 Lost Time for Lane Group, tl 6 . 00 6 . 00 Left Turns per Cycle : LTC=V1tC/3600 4 . 72 3 . 75 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 16 . 49 4 . 24 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 67 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl , gf<=g 0 . 0 0 . 0 Opposing Queue Ratio: qro=1-Rpo (go/C) 0 . 37 0 . 73 gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gqc=g 7 . 39 0 . 00 gu =g-gq if gq>=gf, =g-gf if gq<gf 8 . 61 11 . 00 n= (gq-gf) /2 , n>=0 3 . 70 0 . 00 Ptho=1-Plto 1 . 00 1 . 00 P1*=Plt [l+{ (N-1) g/ (gf+gu/Ell+4 . 24) ) ) 1 . 00 1 . 00 Ell (Figure 9-7) 8 . 51 1 . 80 E12= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 1 . 00 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g 0 . 25 0 . 36 gdiff=max (gq-gf, 0) 0 . 00 0 . 00 fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) 0 .25 0 . 56 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) }] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt 0 . 250 0 . 557 For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>1, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes , flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SB Cycle Length, C 90 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle : LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp ( - a * (LTC ** b) ) ] -tl, gf<=g Opposing Queue Ratio: qro=1-Rpo (go/C) gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl , gq<=g gu =g-gq if gq>=gf, =g-gf if gqcgf n= (gq-gf) /2 , n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) Ell= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g gdiff=max (gq-gf, 0) fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt Primary For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WELT NBLT SBLT Adj . LT Vol from Vol Adjustment Worksheet, v 189 150 v/c ratio from Capacity Worksheet, X Primary phase effective green, g 16 . 00 11 . 00 Secondary phase effective green, gq 7 . 39 0 . 00 (From Supplemental Permitted LT Worksheet) , gu 8 . 61 11 . 00 Cycle length, C 90 . 0 Red = (C-g-gq-gu) , r 62 . 0 71 . 0 Arrivals : v/ (3600 (max (X, 1 . 0) ) ) , qa 0 . 05 0 . 04 Primary ph. departures : s/3600, sp 0 . 501 0 . 50_ Secondary ph. departures : s (gq+gu) / (gu*3600) , ss 0 . 25 0 . 29 XPerm 1 . 94 1 . 06 XProt XCase 5 5 Queue at beginning of green arrow, Qa 1 . 98 0 . 18 Queue at beginning of unsaturated green, Qu 3 . 64 2 . 96 Residual queue, Qr 0 . 00 0 . 00 Uniform Delay, dl 32 . 8 32 . 6 DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur. Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 31 . 0 sec/veh Intersection LOS C ERROR MESSAGES No errors to report . HCS : Signals Release 3 . 1b Inter: SH 119 City/St : Analyst : GC Proj # : Date : 12/9/99 Period: EX ST LT AM PM E/W St : SH 119 N/S St : FRONTAGE RO• : SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 2 3 0 1 3 0 2 2 1 1 2 1 LGConfig L TR L TR L T R L T R Volume 320 1050 320 240 1300 110 400 355 350 175 280 585 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 80 30 85 145 Duration 0 . 25 Area Type : All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P P SB Left P P Thru P P Thru P P Right P P Right P P Peds Peds NB Right P EB Right SB Right P WB Right Green 14 . 0 16 . 0 12 . 0 17 . 0 11 . 0 8 . 0 Yellow 0 . 0 0 . 0 4 . 0 0 . 0 0 . 0 4 . 0 All Red 0 . 0 0 . 0 2 . 0 0 . 0 0 . 0 2 . 0 Cycle Length: 90 . 0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate _ Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound L 545 3502 0 . 62 0 . 156 43 .5 D TR 1679 5036 0 . 82 0 . 333 22 . 9 C 26 . 9 C Westbound L 325 0 . 82 0 . 311 54 . 1 D TR 1599 5139 0 . 91 0 . 311 30 . 2 C 33 . 9 C Northbound L 661 3502 0 . 64 0 . 189 40 . 3 D T 1123 3610 0 . 35 0 . 311 24 . 8 C 27 . 9 C R 825 1615 0 . 36 0 . 511 14 .4 B Southbound L 281 0 . 69 0 . 211 47 . 4 D T 762 3610 0 . 41 0 . 211 32 . 3 C 30 . 5 C R 700 1615 0 . 66 0 . 433 22 .2 C Intersection Delay = 30 . 7 (sec/veh) Intersection LOS = C HCS : Signals Release 3 . 1b Phone : Fax: E-Mail : OPERATIONAL ANALYSIS Intersection: SH 119 City/State : Analyst : GC Project No : Time Period Analyzed: EX ST LT AM PM Date : 12/9/99 East/West Street Name : SH 119 North/South Street Name : FRONTAGE ROAD VOLUME DATA Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 320 1050 320 240 1300 110 400 355 350 175 280 585 PHF 0 . 95 0 . 95 0 . 90 0 . 90 0 . 95 0 . 90 0 . 95 0 . 90 0 . 90 0 . 90 0 . 90 0 . 95 PK 15 Vol 84 276 89 67 342 31 105 99 97 49 78 154 Hi Ln Vol % Grade 0 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ParkExist NumPark Heavy Veh 0 0 0 0 0 0 0 0 0 0 0 0 No. Lanes 2 3 0 1 3 0 2 2 1 1 2 1 LGConfig L TR L TR L T R L T R Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 80 30 85 145 Adj Flow 337 1372 267 1457 421 394 294 194 311 463 aInSharedLn Prop Turns 0 . 19 0 . 06 NumPeds 0 0 0 0 NumBus 0 0 0 0 0 0 0 0 0 0 Duration 0 .25 Area Type : All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 4 5 3 5 4 3 3 3 3 4 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 I 5 6 7 8 EB Left P NB Left P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P P SB Left P P Thru P P Thru P P Right P P Right P P Peds Peds NB Right P EB Right SB Right P WB Right Green 14 . 0 16 . 0 12 . 0 17 . 0 11 . 0 8 . 0 Yellow 0 . 0 0 . 0 4 . 0 0 . 0 0 . 0 4 . 0 All Red 0 . 0 0 . 0 2 . 0 0 . 0 0 . 0 2 . 0 Cycle Length: 90 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop . Prop. Appr. / Mvt Flow No. Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 320 0 . 95 337 2 L 337 Thru 1050 0 . 95 1105 3 TR 1372 0 . 19 Right 320 0 . 90 267 0 80 Westbound Left 240 0 . 90 267 1 L 267 Thru 1300 0 . 95 1368 3 TR 1457 0 . 06 Right 110 0 . 90 89 0 30 Northbound Left 400 0 . 95 421 2 L 421 Thru 355 0 . 90 394 2 T 394 Right 350 0 . 90 294 1 R 85 294 Southbound Left 175 0 . 90 194 1 L 194 Thru 280 0 . 90 311 2 T 311 Right 585 0 . 95 463 1 R 145 463 * Value entered by user. SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Ad- Lane Sat f f f f f f f f f Sat Group Flow W HV G P BB A LU RT LT Flow Eastbound Sec LT Adj/LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 97 - - -- 0 . 950 3502 TR 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 91 0 . 971 1 . 000 5036 Westbound Sec LT Adj /LT Sat : 0 . 250 475 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 950 1805 TR 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 91 0 . 991 1 . 000 5139 Northbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 97 -- -- 0 . 950 3502 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 95 1 . 000 1 . 000 3610 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - -- 1615 Southbound Sec LT Adj /LT Sat : 0 . 519 987 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 -- -- 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 0 . 95 1 . 000 1 . 000 3610 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - -- 1615 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green --Lane Group- - Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . Sec . Left L 337 3502 0 . 10 0 . 156 545 0 . 62 Thru TR 1372 5036 0 . 27 0 . 333 1679 0 . 82 Right Westbound Pri . 183 1805 0 . 10 0 . 133 241 0 . 76 Sec . 475 0 . 178 84 Left L 267 0 . 311 325 0 . 82 Thru TR 1457 5139 0 . 28 0 . 311 1599 0 . 91 Right Northbound Pri . Sec . Left L 421 3502 0 . 12 0 . 189 661 0 . 64 Thru T 394 3610 0 . 11 0 . 311 1123 0 . 35 Right R 294 1615 0 . 18 0 .511 825 0 . 36 Southbound Pri . 73 1805 0 . 04 0 . 089 160 0 . 46 Sec . 987 0 . 122 121 Left L 194 0 . 211 281 0 . 69 Thru T 311 3610 0 . 09 0 . 211 762 0 . 41 Right R 463 1615 0 . 29 0 . 433 700 0 . 66 Sum (v/s) critical = 0 . 00 Lost Time/Cycle, L = 0 . 00 sec Critical v/c (X) = 0 . 00 LEVEL OF SERVICE WORKSHEET Appr/ Ratios Unf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound L 0 . 62 0 . 156 35 . 5 1 . 079 545 0 . 50 5 . 2 0 . 0 43 . 5 D TR 0 . 82 0 . 333 27 . 5 0 . 667 1679 0 . 50 4 . 5 0 . 0 22 . 9 C 26 . 9 C Westbound L 0 . 82 0 . 311 33 . 8 1 . 000 325 0 . 50 20 . 3 0 . 0 54 . 1 D TR 0 . 91 0 . 311 29 . 8 0 . 699 1599 0 . 50 9 .4 0 . 0 30 . 2 C 33 . 9 C Northbound L 0 . 64 0 . 189 33 . 7 1 . 061 661 0 . 50 4 . 6 0 . 0 40 . 3 D T 0 .35 0 . 311 24 . 0 1 . 000 1123 0 . 50 0 . 9 0 . 0 24 . 8 C 27 . 9 C R 0 .36 0 . 511 13 . 2 1 . 000 825 0 . 50 1 . 2 0 . 0 14 . 4 B Southbound L 0 . 69 0 . 211 34 .4 1 . 000 281 0 . 50 13 . 1 0 . 0 47 . 4 D T 0 .41 0 . 211 30 . 6 1 . 000 762 0 . 50 1 . 6 0 . 0 32 . 3 C 30 . 5 C R 0 . 66 0 . 433 20 . 3 0 . 857 700 0 . 50 4 . 9 0 . 0 22 . 2 C Intersection Delay = 30 . 7 (sec/veh) Intersection LOS = C SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 90 . 0 sec Actual Green Time for Lane Group, G 28 . 0 19 . 0 Effective Green Time for Lane Group, g 16 . 00 11 . 00 Opposing Effective Green Time, go 30 . 0 28 . 0 Number of Lanes in Lane Group, N 1 1 Number of Opposing Lanes, No 3 2 Adjusted Left-Turn Flow Rate, Vlt 267 194 Proportion of Left Turns in Opposing Flow, Plto 0 . 00 0 . 00 Adjusted Opposing Flow Rate, Vo 1372 394 Lost Time for Lane Group, tl 6 . 00 6 . 00 Left Turns per Cycle : LTC=V1tC/3600 6 . 68 4 . 85 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 12 . 56 5 . 18 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 67 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl, gfc=g 0 . 0 0 . 0 Opposing Queue Ratio: qro=1-Rpo (go/C) 0 .44 0 . 69 gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gqc=g 0 . 89 0 . 00 gu =g-gq if gq>=gf , =g-gf if gq<gf 15 . 11 11 . 00 n= (gq-gf) /2 , n>=0 0 .44 0 . 00 Ptho=1-Plto 1 . 00 1 . 00 P1*=Plt [1+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) 1 . 00 1 . 00 Ell (Figure 9-7) 5 . 38 1 . 93 E12= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 1 . 00 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g 0 . 25 0 . 36 gdiff=max (gq-gf, 0) 0 . 00 0 . 00 fm= [gf/g] + [gu/g] [1/{1+P1 (E11-1) } ] , (min=fmin;max=1 . 00) 0 . 25 0 . 52 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** fit 0 . 250 0 . 519 For special case of single-lane approach opposed by multilane approach, see text . * If P1>=1 for shared left-turn lanes with N>1, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SE Cycle Length, C 90 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle : LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600fluo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp (- a * (LTC ** b) ) ] -tl, gf<=g Opposing Queue Ratio: qro=1-Rpo (go/C) gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl , gq<=g gu =g-gq if gq>=gf , =g-gf if gq<gf n= (gq-gf) /2 , n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) E12= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g gdiff=max (gq-gf, 0) fm= [gf/g] + [gu/g] [1/{1+Pl (Ell-1) } ] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (1+Plt (Ell-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt Primary For special case of single-lane approach opposed by multilane approach, see text . * If P1>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WBLT NBLT SBLT Adj . LT Vol from Vol Adjustment Worksheet, v 267 194 v/c ratio from Capacity Worksheet, X Primary phase effective green, g 16 . 00 11 . 00 Secondary phase effective green, gq 0 . 89 0 . 00 (From Supplemental Permitted LT Worksheet) , gu 15 . 11 11 . 00 Cycle length, C 90 . 0 Red = (C-g-gq-gu) , r 62 . 0 71 . 0 Arrivals : v/ (3600 (max (X, 1 . 0) ) ) , qa 0 . 07 0 . 05 Primary ph. departures : s/3600 , sp 0 . 501 0 . 501 Secondary ph. departures : s (gq+gu) / (gu*3600) , ss 0 . 14 0 . 27 XPerm 2 . 74 1 .. 47 XProt XCase 5 5 Queue at beginning of green arrow, Qa 3 . 67 1 . 40 Queue at beginning of unsaturated green, Qu 4 . 66 3 . 83 Residual queue, Qr 0 . 00 0 . 00 Uniform Delay, dl 33 . 8 34 . 4 DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur . Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 30 . 7 sec/veh Intersection LOS C ERROR MESSAGES No errors to report . HCS : Signals Release 3 . 1b Inter: SH 66 City/St : Analyst : GC Proj # : //� l Date : 12/9/99 Period: ST LT ( AM / PM E/W St : SH 119 N/S St : FRONTAGE ROAD �� SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 1 1 1 1 1 1 1 1 1 1 1 1 LGConfig L T R L T R L T R L T R Volume 200 650 325 35 475 25 200 30 35 65 55 50 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 80 0 10 10 Duration 0 . 25 Area Type : All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P P NB Left P P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P SB Left P Thru P Thru P Right P Right P Peds Peds NB Right EB Right SB Right WB Right Green 11 . 0 28 . 0 13 . 0 12 . 0 Yellow 0 . 0 3 . 0 0 . 0 4 . 0 All Red 0 . 0 2 . 0 0 . 0 2 . 0 Cycle Length: 75 . 0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound L 329 0 . 67 0 . 520 23 . 8 C T 988 1900 0 . 73 0 . 520 18 . 7 B 18 . 0 B R 840 1615 0 . 32 0 . 520 11 . 4 B Westbound L 197 527 0 . 20 0 . 373 18 . 1 B T 709 1900 0 . 74 0 . 373 27 . 4 C 26 . 2 C R 603 1615 0 . 05 0 . 373 15 . 1 B Northbound L 468 0 .47 0 . 333 22 . 5 C T 633 1900 0 . 05 0 .333 17 . 1 B 21 . 3 C R 538 1615 0 . 05 0 . 333 17 . 1 B Southbound L 224 1398 0 .32 0 . 160 31 . 7 C T 304 1900 0 . 20 0 . 160 28 . 8 C 29 . 9 C R 258 1615 0 . 17 0 . 160 28 . 6 C Intersection Delay = 21 . 3 (sec/veh) Intersection LOS = C HCS : Signals Release 3 . 1b Phone : Fax: E-Mail : OPERATIONAL ANALYSIS Intersection: SH 66 City/State : Analyst : GC Project No: Time Period Analyzed: ST LT AM PM Date : 12/9/99 East/West Street Name : SH 119 North/South Street Name : FRONTAGE ROAD VOLUME DATA _ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 200 650 325 35 475 25 200 30 35 65 55 50 PHF 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 PK 15 Vol 56 181 90 10 132 7 56 8 10 18 15 14 Hi Ln Vol Grade 0 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ParkExist NumPark Heavy Veh 0 0 0 0 0 0 0 0 0 0 0 0 No . Lanes 1 1 1 1 1 1 1 1 1 1 1 1 LGConfig L T R L T R L T R L T R Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 80 0 10 10 Adj Flow 222 722 272 39 528 28 222 33 28 72 61 44 oInSharedLn Prop Turns NumPeds 0 0 0 0 NumEus 0 0 0 0 0 0 0 0 0 0 0 0 Duration 0 . 25 Area Type : All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 3 3 3 3 3 3 3 3 3 3 3 3 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 I 5 6 7 8 EB Left P P NB Left P P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P SB Left P Thru P Thru P Right P Right P Peds Peds NB Right EB Right SB Right WB Right Green 11 . 0 28 . 0 13 . 0 12 . 0 Yellow 0 . 0 3 . 0 0 . 0 4 . 0 All Red 0 . 0 2 . 0 0 . 0 2 . 0 Cycle Length: 75 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop. Prop . Appr. / Mvt Flow No . Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 200 0 . 90 222 1 L 222 Thru 650 0 . 90 722 1 T 722 Right 325 0 . 90 272 1 R 80 272 Westbound Left 35 0 . 90 39 1 L 39 Thru 475 0 . 90 528 1 T 528 Right 25 0 . 90 28 1 R 0 28 Northbound Left 200 0 . 90 222 1 L 222 Thru 30 0 . 90 33 1 T 33 Right 35 0 . 90 28 1 R 10 28 Southbound Left 65 0 . 90 72 1 L 72 Thru 55 0 . 90 61 1 T 61 Right 50 0 . 90 44 1 R 10 44 * Value entered by user . SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Adj Lane Sat f f f f f f f f f Sat Group Flow W HV G P BB A LU RT LT Flow Eastbound Sec LT Adj /LT Sat : 0 . 173 330 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - - - 1615 Westbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 278 527 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 -- -- 1615 Northbound Sec LT Adj /LT Sat : 0 . 618 1175 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 - --- 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - - - 1615 Southbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 --- - 0 . 736 1398 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - - - 1615 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . 193 1805 # 0 . 11 0 . 107 193 1 . 00 Sec . 29 330 0 . 09 0 .413 136 0 . 21 Left L 222 0 . 520 329 0 . 67 Thru T 722 1900 0 . 38 0 . 520 988 0 . 73 Right R 272 1615 0 . 17 0 . 520 840 0 . 32 Westbound Pri . Sec . Left L 39 527 0 . 07 0 . 373 197 0 . 20 Thru T 528 1900 # 0 . 28 0 . 373 709 0 . 74 Right R 28 1615 0 . 02 0 . 373 603 0 . 05 Northbound Pri . 217 1805 # 0 . 12 0 . 120 217 1 . 00 Sec . 5 1175 0 . 00 0 .213 251 0 . 02 Left L 222 0 . 333 468 0 . 47 Thru T 33 1900 0 . 02 0 . 333 633 0 . 05 Right R 28 1615 0 . 02 0 . 333 538 0 . 05 Southbound Pri . Sec . Left L 72 1398 # 0 . 05 0 . 160 224 0 . 32 Thru T 61 1900 0 . 03 0 . 160 304 0 . 20 Right R 44 1615 0 . 03 0 . 160 258 0 . 17 Sum (v/s) critical = 0 . 56 Lost Time/Cycle, L = 22 . 00 sec Critical v/c (X) = 0 . 79 LEVEL OF SERVICE WORKSHEET Appr/ Ratios Unf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound L 0 . 67 0 . 520 13 . 2 1 . 000 329 0 . 50 10 . 6 0 . 0 23 . 8 C T 0 . 73 0 . 520 13 . 9 1 . 000 988 0 . 50 4 . 8 0 . 0 18 . 7 B 18 . 0 B R 0 . 32 0 . 520 10 .4 1 . 000 840 0 . 50 1 . 0 0 . 0 11 . 4 B Westbound L 0 . 20 0 . 373 15 . 9 1 . 000 197 0 . 50 2 . 2 0 . 0 18 . 1 B T 0 . 74 0 . 373 20 .4 1 . 000 709 0 . 50 7 . 0 0 . 0 27 . 4 C 26 . 2 C R 0 . 05 0 . 373 15 . 0 1 . 000 603 0 .50 0 . 1 0 . 0 15 . 1 B Northbound L 0 .47 0 . 333 19 . 0 1 . 000 468 0 . 50 3 .4 0 . 0 22 . 5 C T 0 . 05 0 . 333 17 . 0 1 . 000 633 0 . 50 0 . 2 0 . 0 17 . 1 B 21 . 3 C R 0 . 05 0 . 333 17 . 0 1 . 000 538 0 . 50 0 . 2 0 . 0 17 . 1 B Southbound L 0 . 32 0 . 160 27 . 9 1 . 000 224 0 . 50 3 . 8 0 . 0 31 . 7 C T 0 . 20 0 . 160 27 . 3 1 . 000 304 0 .50 1 . 5 0 . 0 28 . 8 C 29 . 9 C R 0 . 17 0 . 160 27 . 2 1 . 000 258 0 . 50 1 . 4 0 . 0 28 . 6 C Intersection Delay = 21 . 3 (sec/veh) Intersection LOS = C SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G 39 . 0 28 . 0 25 . 0 12 . 0 Effective Green Time for Lane Group, g 31 . 00 28 . 00 16 . 00 12 . 00 Opposing Effective Green Time, go 28 . 0 39 . 0 12 . 0 25 . 0 Number of Lanes in Lane Group, N 1 1 1 1 Number of Opposing Lanes, No 1 1 1 1 Adjusted Left-Turn Flow Rate, Vlt 222 39 222 72 Proportion of Left Turns in Opposing Flow, Pito 0 . 00 0 . 00 0 . 00 0 . 00 Adjusted Opposing Flow Rate, Vo 528 722 61 33 Lost Time for Lane Group, tl 5 . 00 5 . 00 6 . 00 6 . 00 Left Turns per Cycle : LTC=V1tC/3600 4 . 63 0 . 81 4 . 63 1 . 50 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 11 . 00 15 . 04 1 . 27 0 . 69 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 00 1 . 00 1 . 00 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl, gf<=g 0 . 0 0 . 0 0 . 0 0 . 0 Opposing Queue Ratio: qro=1-Rpo (go/C) 0 . 63 0 .48 0 . 84 0 . 67 gq= (4 . 943Voic**0 . 762) (gro**1 . 061) -tl, gq<=g 19 . 51 8 . 11 2 . 21 0 . 00 gu =g-gq if gq>=gf, =g-gf if gq<gf 11 . 49 19 . 89 13 . 79 12 . 00 n= (gq-gf) /2 , n>=0 9 . 75 4 . 06 1 . 10 0 . 00 Ptho=1-Plto 1 . 00 1 . 00 1 . 00 1 . 00 P1*=Plt [1+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) 1 . 00 1 . 00 1 . 00 1 . 00 Ell (Figure 9-7) 2 . 14 2 . 56 1 . 39 1 . 36 E12= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 1 . 00 1 . 00 1 . 00 fmin=2 (1+Plt) /g or fmin=2 (l+Pl) /g 0 . 13 0 . 14 0 . 25 0 . 32 gdiff=max (gq-gf, 0) 0 . 00 0 . 00 0 . 00 0 . 00 fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) 0 . 17 0 .28 0 . 62 0 . 74 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt 0 . 173 0 . 278 0 . 618 0 . 736 For special case of single-lane approach opposed by multilane approach, see text . * If P1>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle : LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp (- a * (LTC ** b) ) ] -tl , gf<=g Opposing Queue Ratio : qro=1-Rpo (go/C) gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gqc=g gu =g-gq if gq>=gf, =g-gf if gqcgf n= (gq-gf) /2, n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) E12= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (l+Plt) /g or fmin=2 (1+P1) /g gdiff=max (gq-gf, 0) fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) }] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt Primary For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>1, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WBLT NBLT BELT Adj . LT Vol from Vol Adjustment Worksheet, v 222 222 v/c ratio from Capacity Worksheet, X 0 . 21 0 . 02 Primary phase effective green, g 31 . 00 16 . 00 Secondary phase effective green, gq 19 . 51 2 . 21 (From Supplemental Permitted LT Worksheet) , gu 11 . 49 13 . 79 Cycle length, C 75 . 0 Red = (C-g-gq-gu) , r 36 . 0 50 . 0 Arrivals : v/ (3600 (max(X, 1 . 0) ) ) , qa 0 . 06 0 . 06 Primary ph. departures : s/3600, sp 0 . 501 0 . 501 Secondary ph. departures : s (gq+gu) / (gu*3600) , ss 0 . 25 0 . 38 XPerm 0 . 67 0 . 19 XProt 0 . 68 0 . 81 XCase 1 1 Queue at beginning of green arrow, Qa 2 .22 3 . 08 Queue at beginning of unsaturated green, Qu 1 . 20 0 . 14 Residual queue, Qr 0 . 00 0 . 00 Uniform Delay, dl 13 . 2 19 . 0 DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur. Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 21 . 3 sec/veh Intersection LOS C ERROR MESSAGES No errors to report . HCS : Signals Release 3 . 1b Inter: SH 66 City/St : Analyst : GC Proj # : Date : 12/9/99 Period: ST LT AM P E/W St : SH 119 N/S St : FRONTA - ROAD SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 1 1 1 1 1 1 1 1 1 1 1 1 LGConfig L T R L T R L T R L T R Volume 95 710 215 90 780 15 330 40 80 60 65 150 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 50 5 20 75 Duration 0 . 25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P P NB Left P P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P SB Left P Thru P Thru P Right P Right P Peds Peds NB Right EB Right SB Right P WB Right Green 6 . 0 36 . 0 15 . 0 7 . 0 Yellow 0 . 0 3 . 0 0 . 0 4 . 0 All Red 0 . 0 2 . 0 0 . 0 2 . 0 Cycle Length: 75 . 0 secs Intersection Performance Summary _ Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound L 173 0 . 61 0 .560 32 . 0 C T 1064 1900 0 . 74 0 .560 12 . 9 B 14 . 1 B R 904 1615 0 . 20 0 . 560 8 . 7 A Westbound L 251 522 0 .40 0 .480 17 . 2 B T 912 1900 0 . 95 0 .480 34 . 9 C 32 . 8 C R 775 1615 0 . 01 0 .480 10 . 2 B Northbound L 412 0 . 89 0 . 293 48 . 8 D T 557 1900 0 . 08 0 . 293 19 .4 B 42 . 1 D R 474 1615 0 . 14 0 .293 20 . 2 C Southbound L 129 1384 0 . 52 0 . 093 46 . 5 D T 177 1900 0 .41 0 . 093 38 . 8 D 35 .3 D R 409 1615 0 . 20 0 . 253 23 . 2 C Intersection Delay = 27 .4 (sec/veh) Intersection LOS = C HCS : Signals Release 3 . 1b Phone : Fax: E-Mail : OPERATIONAL ANALYSIS _ Intersection: SH 66 City/State : Analyst : GC Project No: Time Period Analyzed: ST LT AM PM Date : 12/9/99 East/West Street Name : SH 119 North/South Street Name : FRONTAGE ROAD VOLUME DATA Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 95 710 215 90 780 15 330 40 80 60 65 150 PHF 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 PK 15 Vol 26 197 60 25 217 4 92 11 22 17 18 42 Hi Ln Vol Grade 0 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ParkExist NumPark Heavy Veh 0 0 0 0 0 0 0 0 0 0 0 0 No . Lanes 1 1 1 1 1 1 1 1 1 1 1 1 LGConfig L T R L T R L T R L T R Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 50 5 20 75 Adj Flow 106 789 183 100 867 11 367 44 67 67 72 83 %InSharedLn Prop Turns NumPeds 0 0 0 0 NumBus 0 0 0 0 0 0 0 0 0 0 0 0 Duration 0 . 25 Area Type: All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 3 4 3 3 4 3 3 3 3 3 3 3 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 I 5 6 7 8 EB Left P P NB Left P P Thru P P Thru P P Right P P Right P P Peds Peds WB Left P SB Left P Thru P Thru P Right P Right P Peds Peds NB Right EB Right SB Right P WB Right Green 6 . 0 36 . 0 15 . 0 7 . 0 Yellow 0 . 0 3 . 0 0 . 0 4 . 0 All Red 0 . 0 2 . 0 0 . 0 2 . 0 Cycle Length: 75 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop . Prop. Appr. / Mvt Flow No. Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 95 0 . 90 106 1 L 106 Thru 710 0 . 90 789 1 T 789 Right 215 0 . 90 183 1 R 50 183 Westbound Left 90 0 . 90 100 1 L 100 Thru 780 0 . 90 867 1 T 867 Right 15 0 . 90 11 1 R 5 11 Northbound Left 330 0 . 90 367 1 L 367 Thru 40 0 . 90 44 1 T 44 Right 80 0 . 90 67 1 R 20 67 Southbound Left 60 0 . 90 67 1 L 67 Thru 65 0 . 90 72 1 T 72 Right 150 0 . 90 83 1 R 75 83 * Value entered by user. SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Adj Lane Sat f f f f f f f f f Sat Group Flow W HV G P BB A LU RT LT Flow Eastbound Sec LT Adj /LT Sat : 0 . 103 195 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 -- -- 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - - - 1615 Westbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 -- -- 0 . 275 522 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - --- 1615 Northbound Sec LT Adj /LT Sat : 0 . 527 1002 L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 950 1805 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 --- - 1615 Southbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 728 13E4 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 -- - - 1615 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . 72 1805 # 0 . 04 0 . 040 72 1 . 00 Sec . 34 195 0 . 17 0 . 520 101 0 . 34 Left L 106 0 . 560 173 0 . 61 Thru T 789 1900 0 .42 0 . 560 1064 0 . 74 Right R 183 1615 0 . 11 0 . 560 904 0 . 20 Westbound Pri . Sec . Left L 100 522 0 . 19 0 .480 251 0 .40 Thru T 867 1900 # 0 . 46 0 .480 912 0 . 95 Right R 11 1615 0 . 01 0 .480 775 0 . 01 Northbound Pri . 265 1805 # 0 . 15 0 . 147 265 1 . 00 Sec . 102 1002 # 0 . 10 0 . 147 147 0 . 69 Left L 367 0 . 293 412 0 . 89 Thru T 44 1900 0 . 02 0 . 293 557 0 . 08 Right R 67 1615 0 . 04 0 . 293 474 0 . 14 Southbound Pri . Sec . Left L 67 1384 0 . 05 0 . 093 129 0 . 52 Thru T 72 1900 0 . 04 0 . 093 177 0 . 41 Right R 83 1615 0 . 05 0 . 253 409 0 . 20 Sum (v/s) critical = 0 . 74 Lost Time/Cycle, L = 16 . 00 sec Critical v/c (X) = 0 . 95 LEVEL OF SERVICE WORKSHEET Appr/ Ratios Unf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound L 0 . 61 0 . 560 16 . 9 1 . 000 173 0 . 50 15 . 1 0 . 0 32 . 0 C T 0 . 74 0 . 560 12 .4 0 . 662 1064 0 . 50 4 . 7 0 . 0 12 . 9 B 14 . 1 B R 0 . 20 0 . 560 8 . 2 1 . 000 904 0 . 50 0 . 5 0 . 0 8 . 7 A Westbound L 0 . 40 0 .480 12 . 5 1 . 000 251 0 . 50 4 . 7 0 . 0 17 . 2 B T 0 . 95 0 . 480 18 . 7 0 . 796 912 0 . 50 20 . 0 0 . 0 34 . 9 C 32 . 8 C R 0 . 01 0 . 480 10 . 2 1 . 000 775 0 . 50 0 . 0 0 . 0 10 . 2 B Northbound L 0 . 89 0 . 293 24 . 8 1 . 000 412 0 . 50 24 . 0 0 . 0 48 . 8 D T 0 . 08 0 . 293 19 . 2 1 . 000 557 0 . 50 0 . 3 0 . 0 19 .4 B 42 . 1 D R 0 . 14 0 . 293 19 .5 1 . 000 474 0 . 50 0 . 6 0 . 0 20 . 2 C Southbound I, 0 . 52 0 . 093 32 . 4 1 . 000 129 0 . 50 14 . 2 0 . 0 46 . 5 D T 0 . 41 0 . 093 32 . 0 1 . 000 177 0 . 50 6 . 8 0 . 0 38 . 8 D 35 . 3 D R 0 . 20 0 . 253 22 . 0 1 . 000 409 0 . 50 1 . 1 0 . 0 23 . 2 C Intersection Delay = 27 .4 (sec/veh) Intersection LOS = C SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G 42 . 0 36 . 0 22 . 0 7 . 0 Effective Green Time for Lane Group, g 39 . 00 36 . 00 11 . 00 7 . 00 Opposing Effective Green Time, go 36 . 0 42 . 0 7 . 0 22 . 0 Number of Lanes in Lane Group, N 1 1 1 1 Number of Opposing Lanes, No 1 1 1 1 Adjusted Left-Turn Flow Rate, Vlt 106 100 367 67 Proportion of Left Turns in Opposing Flow, Plto 0 . 00 0 . 00 0 . 00 0 . 00 Adjusted Opposing Flow Rate, Vo 867 789 72 44 Lost Time for Lane Group, tl 5 . 00 5 . 00 6 . 00 6 . 00 Left Turns per Cycle : LTC=V1tC/3600 2 . 21 2 . 08 7 . 65 1 .40 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 18 . 06 16 . 44 1 . 50 0 . 92 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 33 1 . 33 1 . 00 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl , gf<=g 0 . 0 0 . 0 0 . 0 0 . 0 Opposing Queue Ratio: qro=1-Rpo (go/C) 0 . 36 0 . 25 0 . 91 0 . 71 gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gq<=g 36 . 35 9 . 04 2 . 83 0 . 00 gu =g-gq if gq>=gf, =g-gf if gqcgf 2 . 65 26 . 96 8 . 17 7 . 03 n= (gq-gf) /2, n>=0 18 . 17 4 . 52 1 .42 0 . 03 Ptho=1-Plto 1 . 00 1 . 00 1 . 00 1 . 03 P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) 1 . 00 1 . 00 1 . 00 1 . 00 Ell (Figure 9-7) 2 . 93 2 . 72 1 .41 1 . 37 Ell= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 1 . 00 1 . 00 1 . 03 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g 0 . 10 0 . 11 0 . 36 0 . 57 gdiff=max (gq-gf, 0) 0 . 00 0 . 00 0 . 00 0 . 03 fm= [gf/g] + [gu/g] [1/{1+P1 (E11-1) } ] , (min=fmin;max=1 . 00) 0 . 10 0 . 27 0 . 53 0 . 73 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (i+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt 0 . 103 0 . 275 0 . 527 0 . 728 For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle : LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp ( - a * (LTC ** b) ) ] -tl, gf<=g Opposing Queue Ratio: qro=1-Rpo (go/C) gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gq<=g gu =g-gq if gq>=gf, =g-gf if gq<gf n= (gq-gf) /2 , n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) E12= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g gdiff=max (gq-gf, 0) fm= [gf/g] + [gu/g] [1/ {1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + (gu/g] [1/ (1+Plt (E11-l) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt Primary For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WELT NBLT SELT Adj . LT Vol from Vol Adjustment Worksheet, v 106 367 v/c ratio from Capacity Worksheet, X 0 . 34 0 . 69 Primary phase effective green, g 39 . 00 11 . 00 Secondary phase effective green, gq 36 . 35 2 . 83 (From Supplemental Permitted LT Worksheet) , gu 2 . 65 8 . 17 Cycle length, C 75 . 0 Red = (C-g-gq-gu) , r 33 . 0 53 . 0 Arrivals : v/ (3600 (max (X, 1 . 0) ) ) , qa 0 . 03 0 . 10 Primary ph. departures : s/3600 , sp 0 . 501 0 . 501 Secondary ph. departures : s (gq+gu) / (gu*3600) , ss 0 . 80 0 . 37 XPerm 0 . 54 0 . 37 XProt 0 . 70 1 . 18 XCase 1 2 Queue at beginning of green arrow, Qa 0 . 97 5 . 40 Queue at beginning of unsaturated green, Qu 1 . 07 2 . 69 Residual queue, Qr 0 . 00 0 . 00 Uniform Delay, dl 16 . 9 24 . 8 DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur. Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 27 . 4 sec/veh Intersection LOS C ERROR MESSAGES No errors to report . HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: FROIyCE ROAD & CR28 Count Date: ST T 1'",',/ll PM Time Period: Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 10 130 20 155 250 10 130 10 175 10 10 10 HFR: 11 137 21 163 263 11 137 11 184 11 11 "_1 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0 .00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: TWLTL # of vehicles: 1 Flared approach Movements: # of vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 • T R L T R L T R Y Y N N N Y N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N Y N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 0 0 Shared In volume, major rt vehicles: 0 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 2 2 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 • c,hv 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,1t 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 • c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 stage 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0 .00 t c 1 stage 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 2 stage 4.1 4.1 6.5 5.5 6.9 6.5 5.5 6.9 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3 .3 3 .5 4.0 3 .3 t f,HV 1.0 1.0 1.0 1.0 1.0 1.0 1 .0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2.2 2.2 3.5 4.0 3 .3 3.5 4.0 3 .3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 79 137 Potential Capacity 972 893 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 972 893 Probability of Queue free St. 0.81 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 137 263 Potential Capacity 1460 1313 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1460 1313 Probability of Queue free St. 0.89 0 .99 Worksheet 7a - Computation of the effect of Two-stage gap acceptance Step 3: TH from Minor St. 8 11 Part 1- First Stage Conflicting Flows 168 595 Potential Capacity 763 496 1.00 1.00 Pedestrian Impedance Factor .89 Cap. Adj . factor due to Impeding mvmnt 0.99 0 Movement Capacity 757 440 Probability of Queue free St. 0.99 0.98 Part 2- Second Stage Conflicting Flows 589 158 Potential Capacity 498 771 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.89 0.99 Movement Capacity 443 799 Part 3- Single Stage Conflicting Flows 758 753 Potential Capacity 339 341 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.88 0.88 Movement Capacity 299 301 Result for 2 stage process: 0.91 0.91 a 3 .43 0.46 y 367 362 C t Probability of Queue free St. 0.97 0 .97 Worksheet 7b - Computation of the effect of Two-stage gap acceptance 7 10 Step 4: LT from Minor St. Part 1- First Stage 168 595 Conflicting Flows 463 Potential Capacity 823 Pedestrian Impedance Factor 1.00 1.00 0.89 Cap. Adj . factor due to Impeding mvmnt 0.99 Movement Capacity 816 411 Part 2- Second Stage 463 95 Conflicting Flows 907 Potential Capacity 554 .00 1.00 Pedestrian Impedance Factor 0 79 Cap. Adj . factor due to Impeding mvmnt 0.86 Movement Capacity 474 719 Part 3- Single Stage 632 689 Conflicting Flows 336 Potential Capacity 369 1 .00 1.00 Pedestrian Impedance Factor 0.86 Maj . L, Min T Impedance factor 0.86 Maj . L, Min T Adj . Imp Factor. 0.89 0.89 0.88 0.72 Cap. Adj . factor due to Impeding mvmnt Movement Capacity 324 242 Result for 2 stage process: a 0.91 0.91 1, 3.53 0.54 C t 395 321 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II II I II v(vph) 137 11 184 11 11 11 Movement Capacity 395 367 972 321 362 893 Shared Lane Capacity 393 340 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II I I II I v(vnh) 11 163 147 184 21 11 C m(vph) 1313 1460 393 972 340 893 v/c 0.01 0.11 0.37 0.19 0.06 0.01 95% queue length Control Delay 7.8 7.5 19.5 9.6 16.3 9.1 LOS A A C A C A Approach Delay 14.0 13 .9 Approach LOS 2 E HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROLITWSC) ANALYSIS Analyst: GC Intersection: FRONTAGE ROAD 28 Count Date: ST LT AM PM Time Period: Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 2 3 4 5 6 7 8 9 10 11 12 Volume: 20 290 100 200 280 10 155 10 160 10 10 10 HFR: 21 305 105 211 295 11 163 11 168 11 11 11 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: TWLTL # of vehicles: 1 Flared approach Movements: # of vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 • T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R v_ Y N N N Y N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N Y N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 0 0 Shared In volume, major rt vehicles: 0 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 2 2 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 • c,hv 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 P by 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 G 0.00 0 .00 0.00 0.00 0.00 0 .00 0.00 0.00 t 3,1t 0 .0 0.0 0.0 0 .0 0 .0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 stage 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 t c 1 stage 4 .1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 2 stage 4 .1 4.1 6.5 5.5 6 .9 6 .5 5.5 6.9 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3.5 4.0 3 .3 3 .5 4.0 3.3 t f,HV 1 .0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P by 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2.2 2.2 3.5 4.0 3 .3 3.5 4.0 3 .3 Worksheet 6 Impedance and capacity equations Step 1: RT from Minor St. 9 12 Conflicting Flows 205 153 Potential Capacity 808 873 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 808 873 Probability of Queue free St. 0.79 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 305 295 Potential Capacity 1267 1278 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1267 1278 Probability of Queue free St. 0.83 0.98 Worksheet 7a - Computation of the effect of Two-stage gap acceptance Step 3: TH from Minor St. 8 11 Part 1- First Stage Conflicting Flows 400 721 Potential Capacity 605 435 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.98 0.83 Movement Capacity 595 363 Probability of Queue free St. 0.98 0.97 Part 2- Second Stage Conflicting Flows 716 347 Potential Capacity 437 638 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.83 0.98 Movement Capacity 365 628 Part 3- Single Stage Conflicting Flows 1116 1068 Potential Capacity 209 223 Pedestrian. Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.82 0.82 Movement Capacity 172 183 Result for 2 stage process: a 0.91 0.91 y 2.47 0.77 C t 268 260 Probability of Queue free St. 0 .96 0.96 Worksheet 76 - Computation of the effect of Two-stage gap acceptance Step 4: LT from Minor St. 7 10 Part 1- First Stage Conflicting Flows 400 721 Potential Capacity 603 389 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.98 0.83 Movement Capacity 593 325 Part 2- Second Stage Conflicting Flows 574 200 Potential Capacity 476 789 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.80 0.76 Movement Capacity 381 603 Part 3- Single Stage Conflicting Flows 974 921 Potential Capacity 209 229 Pedestrian Impedance Factor 1.00 1.00 Maj . L, Min T Impedance factor 0.79 0.79 Maj . L, Min T Adj . Imp Factor. 0.84 0.84 Cap. Adj . factor due to Impeding mvmnt 0.83 0.66 Movement Capacity 173 151 Result for 2 stage process: a 0.91 0.91 2.25 0.72 C t 276 230 Worksheet 8 Shared. Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 II II v(vph) 163 11 168 11 11 11 Movement Capacity 276 268 808 230 260 873 Shared Lane Capacity 275 244 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I I II I I II I v(vph) 21 211 174 168 21 11 C m(vph) 1278 1267 275 808 244 873 v/c 0.02 0.17 0.63 0.21 0.09 0.01 95% queue length Control Delay 7.9 8.4 38.0 10.6 21.1 9.2 LOS A A E B C A Approach Delay 24.5 17.1 Approach LOS C C HCS: Unsignalized Intersections Release 3 .1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: CR2 8 LT ACCE,�5 Count Date: ST AM PM Time Period: Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 2 3 4 5 7 9 Volume: 200 5 5 70 30 5 HFR: 211 5 5 74 32 5 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 0 # of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.30 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N N Y N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 0 70 Shared In volume, major rt vehicles: 0 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number cf major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 4 7 9 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P hv 0.00 0.00 0.00 t c,g 0.2 0.1 0 .00 0.00 0.00 t 3,1t 0 .0 0.7 0.0 t c,T: 1 stage 0.00 0 .00 0.00 t 1 stage 4.1 6.4 6.2 Follow Up Time Calculations: Movement 4 7 9 t f,base 2.2 3 .5 3 .3 t f,HV 0.9 0.9 0.9 P hv 0.00 0.00 0 .00 t f 2.2 3 .5 3 .3 Worksheet 6 Impedance and capacity equations Step 1: FT from Minor St. 9 12 Conflicting Flows 213 Potential Capacity 832 Pedestrian Impedance Factor 1.00 Movement Capacity 832 Probability of Queue free St. 0.99 Step 2: LT from Major St. 4 1 Conflicting Flows 216 Potential Capacity 1366 Pedestrian Impedance Factor 1.00 Movement Capacity 1366 Probability of Queue free St. 1 .00 Maj . L Shared ln. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 297 Potential Capacity 698 Pedestrian Impedance Factor 1.00 Maj . L, Min T Impedance factor 1.00 Maj . L, Min T Adj . Imp Factor. 1.00 Cap. Adj . factor due to Impeding mvmnt 1.00 Movement Capacity 696 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 II II II v(vph) 5 32 5 C m(vph) 1366 696 832 v/c 0.00 0.05 0.01 95% queue length Control Delay 7.6 10.4 9.4 LOS A B A Approach Delay 10.3 Approach LOS B Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 1.00 1.00 ✓ it 0 70 ✓ i2 0 0 S it 1700 1700 S i2 1700 1700 P* Oj 1.00 1.00 D maj left 0.0 7.6 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: CR2 ACCESS PM Count Date: ST LT AM Time Period: Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 2 3 4 5 7 9 Volume: 300 15 5 55 5 1 HFR: 316 16 5 58 5 1 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 0 # of vehicles: Southbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y N N N N N N N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 • T R L T R L T R Y N N N N Y N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared ln volume, major th vehicles: 0 55 Shared ln volume, major rt vehicles: 0 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 4 7 9 t c,base 4.1 7.1 6.2 t c,hv 1.0 1.0 1.0 P by 0 .00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,1t 0.0 0.7 0.0 t c,T: 1 stage 0.00 0.00 0.00 t c 1 stage 4 .1 6.4 6.2 Follow Up Time Calculations: Movement 4 7 9 t f,base 2.2 3.5 3 .3 t f,HV 0.9 0.9 0.9 P by 0.00 0.00 0.00 t f 2.2 3.5 3.3 Worksheet 6 Impedance and capacity equations Step 1: ET from Minor St. 9 12 Conflicting Flows 324 Potential Capacity 722 Pedestrian Impedance Factor 1.00 Movement Capacity 722 Probability of Queue free St. 1.00 Step 2 . LT from Major St. 4 1 Conflicting Flows 332 Potential Capacity 1239 Pedestrian Impedance Factor 1.00 Movement Capacity 1239 Probability of Queue free St. 1.00 Maj . L Shared in. Prob. Queue Free St. 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 392 Potential Capacity 616 Pedestrian Impedance Factor 1.00 Maj . L, Min T Impedance factor 1.00 Maj . L, Min T Adj . Imp Factor. 1.00 Cap. Adj . factor due to Impeding mvmnt 1.00 Movement Capacity 614 worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II v(vph) 5 5 1 C m(vph) 1239 614 722 v/c 0.00 0.01 0.00 95% queue length Control Delay 7.9 10.9 10.0 LOS A B A Approach Delay 10.8 Approach LOS B Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P oj 1.00 1.00 ✓ it 0 55 ✓ i2 0 0 S it 1700 1700 S i2 1700 1700 P. oj 1.00 1.00 D maj left 0.0 7.9 N number major st lanes 1 1 Delay, rank 1 mvmts 0.0 0 .0 HCS: Unsignalized Intersections Release 3 .1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: CR1 & CR2 Count Date: ST L AM PM Time Period: Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 100 100 1 5 50 25 25 5 1 10 1 75 HFR: 105 105 1 5 53 26 26 5 1 11 1 79 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 C .95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: • Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 1 # of vehicles: Southbound 1 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.C0 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 , T R L T R L T R I Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 100 50 Shared In volume, major rt vehicles: 1 25 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.7. 0.2 0.2 0.1 G 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t 3,1t 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2-2 2.2 3.5 4.0 3 .3 3.5 4.0 3 .3 t. f,HV 0 .9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Worksheet 6 Impedance and capacity equations Step 1: FT from Minor St. 9 12 Conflicting Flows 106 66 Potential Capacity 954 1004 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 954 1004 Probability of Queue free St. 1.00 0.92 Step 2: LT from Major St. 4 1 Conflicting Flows 106 79 Potential Capacity 1497 1532 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1497 1532 Probability of Queue free St. 1.00 0.93 Maj . L Shared ln. Prob. Queue Free St. 1.00 0.93 Step 3: TH from Minor St. 8 11 Conflicting Flows 406 393 Potential Capacity 537 546 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.92 0.92 Movement Capacity 496 504 Probability of Queue free St. 0.99 1.00 Step 4: LT from Minor St. 7 10 Conflicting Flows 433 396 Potential Capacity 537 568 Pedestrian Impedance Factor 1.00 1.00 Maj . L, Min T Impedance factor 0.92 0.91 Maj . L, Min T Adj . Imp Factor. 0.94 0.93 Cap. Adj . factor due to Impeding mvmnt 0.87 0.93 Movement Capacity 465 530 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II I I I II I v(vph) 26 5 1 11 1 79 Movement Capacity 465 496 954 530 504 1004 Shared Lane Capacity 478 900 Worksheet 9-Computation of effect of flared minor street approaches Movement 7 8 9 10 11 12 C sep 465 496 954 530 504 1004 Volume 26 5 1 11 1 79 Delay 13.2 12.3 8.8 11.9 12.2 8.9 Q sep 0.10 0.02 0.00 0.03 0.00 0.20 Q sep +1 1.10 1.02 1.00 1.03 1.00 1 .20 round (Qsep +1) 1 1 1 1 1 1 n max 1 1 C sh 478 900 SUM C sep 1915 2038 n 1 1 C act 1915 2038 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II II I i v(vph) 105 5 33 91 C m(vph) 1532 1497 1915 2038 v/c 0.07 0.00 0 .02 0.04 95% queue length Control Delay 7.5 7.4 6.9 6.8 LOS A A A A Approach Delay 6.9 6.8 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 P of 0.93 1.00 ✓ i1 100 50 ✓ i2 1 25 S it 1700 1700 S i2 1700 1700 9. Oj 0.93 1.00 D maj left 7.5 7.4 N number major st lanes 1 1 Delay, rank 1 mvmts 0.5 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: CR11 & CR28 Count Date: ST LT AM a Time Period: Intersection Orientation: East-West Major St. Vehicle Volume Data: Movements: 1 2 3 4 5 6 7 8 9 10 11 12 Volume: 100 200 5 5 50 50 10 5 1 10 5 25 HFR: 105 211 5 5 53 53 11 5 1 11 5 26 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: a Blockage: Median Type: None # of vehicles: 0 Flared approach Movements: # of vehicles: Northbound 1 # of vehicles: Southbound 1 Lane usage for movements i,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y Y Y N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Eastbound Westbound Shared In volume, major th vehicles: 200 50 Shared ln volume, major rt vehicles: 5 50 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 1 1 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 1 4 7 8 9 10 11 12 t c,base 4 .1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 t c,hv 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c,g 0.2 0.2 0.1 0.2 0.2 0.1 „ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 D.00 t 3,1t 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t c,T: 1 stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t c 1 stage 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Follow Up Time Calculations: Movement 1 4 7 8 9 10 11 12 t f,base 2.2 2.2 3 .5 4.0 3 .3 3.5 4 .0 3 .3 t f,HV 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0 .9 P hv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 t f 2 .2 2.2 3 .5 4.0 3 .3 3.5 4.0 3 .3 Worksheet 6 Impedance and capacity equations Step 1: FT from Minor St. 9 12 Conflicting Flows 213 79 Potential Capacity 832 987 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 832 987 Probability of Queue free St. 1.00 0.97 Step 2: LT from Major St. 4 1 Conflicting Flows 216 105 Potential Capacity 1366 1499 Pedestrian Impedance Factor 1.00 1.00 Movement Capacity 1366 1499 Probability of Queue free St. 1.00 0.93 Maj . L Shared ln. Prob. Queue Free St. 1.00 0.92 Step 3 : TH from Minor St. 8 11 Conflicting Flows 539 516 Potential Capacity 452 466 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.92 0.92 Movement Capacity 414 427 Probability of Queue free St. 0.99 0.99 Step 4: LT from Minor St. 7 10 Conflicting Flows 529 516 Potential Capacity 464 473 Pedestrian Impedance Factor 1.00 1.00 Maj . L, Min T Impedance factor 0.91 0.90 Maj . L, Min T Adj . Imp Factor. 0.93 0.93 Cap. Adj . factor due to Impeding mvmnt 0.90 0.93 Movement Capacity 418 438 Worksheet 8 Shared Lane Calculations Shared Lane Calculations Movement 7 8 9 10 11 12 I II II I II v(vph) 11 5 1 11 5 26 Movement Capacity 418 414 832 438 427 987 Shared Lane Capacity 430 668 Worksheet 9-Computation of effect of flared minor street approaches Movement 7 8 9 10 11 12 C sep 418 414 832 438 427 987 Volume 11 5 1 11 5 26 Delay 13.8 13 .8 9.3 13 .4 13.5 8.7 Q sep 0.04 0.02 0.00 0.04 0.02 0.06 Q sep +1 1.04 1.02 1.00 1.04 1.02 1.06 round (Qsep +1) 1 1 1 1 1 1 n max 1 1 C sh 430 668 SUM C sep 1664 1852 n 1 1 C act 1664 1852 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I II I I I v(vph) 105 5 17 42 C m(vph) 1499 1366 1664 1852 v/c 0.07 0.30 0.01 0.02 95% queue length Control Delay 7.6 7.6 7.2 7.0 LOS A A A A Approach Delay 7.2 7.0 Approach LOS A A Worksheet 11 Shared Major LT Impedance and Delay Rank 1 Delay Calculations Movement 2 5 p of 0.93 1.00 ✓ it 200 50 ✓ i2 5 50 S i1 1700 1700 S i2 1700 1700 5* Oj 0.92 1.00 D maj left 7.6 7.6 N number major st lanes 1 1 Delay, rank 1 mvmts 0.6 0.0 HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: GC Intersection: FRON AGE & ACCESS Count Date: ST T AM PM Time Period: Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 2 3 4 5 7 9 Volume: 255 240 60 325 310 35 HFR: 268 253 63 342 326 37 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: % Blockage: Median Type: TWLTL # of vehicles: 1 Flared approach Movements: # of vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y N N Y N N N Y Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N N Y N N N Channelized: N Grade: 0.00 Worksheet 7a - Computation of the effect of Two-stage gap acceptance Step 3 : TH from Minor St. 8 11 Part 1- First Stage Conflicting Flows 268 468 Potential Capacity 691 564 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 1.00 0.94 Movement Capacity 691 531 Probability of Queue free St. 1.00 1.00 Part 2- Second Stage Conflicting Flows 468 521 Potential Capacity 564 535 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.94 1.00 Movement Capacity 531 535 Part 3- Single Stage Conflicting Flows 737 989 Potential Capacity 348 249 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.94 0.94 Movement Capacity 328 234 Result for 2 stage process: a 0.91 0.91 y 1.79 1.25 C t 418 334 Probability of Queue free St. 1.00 1.00 Worksheet 7b - Computation of the effect of Two-stage gap acceptance Step 4: LT from Minor St. 7 10 Part 1- First Stage Conflicting Flows 268 468 Potential Capacity 758 602 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 1.00 0.94 Movement Capacity 758 566 Part 2- Second Stage Conflicting Flows 297 134 Potential Capacity 734 884 Pedestrian Impedance Factor 1.00 1.00 Cap. Adj . factor due to Impeding mvmnt 0.94 0.96 Movement Capacity 690 847 Part 3- Single Stage Conflicting Flows 566 603 Potential Capacity 459 435 Pedestrian Impedance Factor 1.00 1.00 Maj . L, Min T Impedance factor 0.94 0.94 Maj . L, Min T Adj . Imp Factor. 0.95 0.95 Cap. Adj . factor due to Impeding mvmnt 0.95 0.92 Movement Capacity 438 398 Result for 2 stage process: a 0.91 0.91 y 1.27 0.43 C t 529 470 Worksheet 10 delay,queue length, and LOS Movement 1 4 7 8 9 10 11 12 I I I I I I I I v(vph) 63 326 37 C m(vph) 1056 529 896 v/c 0.06 0.62 0.04 95% queue length Control Delay 8.6 22.2 9.2 LOS A C A Approach Delay 20.9 Approach LOS C HCS: Unsignalized Intersections Release 3.1b TWO-WAY STOP CONTROLITWSC) ANALYSIS Analyst: GC Intersection: PROW GE ROAD &CCESS Count Date: ST L AM PM Time Period: Intersection Orientation: North-South Major St. Vehicle Volume Data: Movements: 2 3 4 5 7 9 Volume: 360 365 70 480 320 80 HFR: 379 384 74 505 337 84 PHF: 0.95 0.95 0.95 0.95 0.95 0.95 PHV: 0.00 0.00 0.00 0.00 0.00 0.00 Pedestrian Volume Data: Movements: Flow: Lane width: Walk speed: °s Blockage: Median Type: TWLTL # of vehicles: 1 Flared approach Movements: # of vehicles: Eastbound 0 # of vehicles: Westbound 0 Lane usage for movements 1,2&3 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N Y N N Y N N N Y Channelized: N Grade: 0.00 Lane usage for movements 4,5&6 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N Y N N Y N Channelized: Y Grade: 0.00 Lane usage for movements 7,8&9 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R Y N N N N Y N N N Channelized: N Grade: 0.00 Lane usage for movements 10,11&12 approach: Lane 1 Lane 2 Lane 3 L T R L T R L T R N N N N N N N N N Channelized: N Grade: 0.00 Data for Computing Effect of Delay to Major Street Vehicles: Northbound Southbound Shared In volume, major th vehicles: 0 0 Shared In volume, major rt vehicles: 0 0 Sat flow rate, major th vehicles: 1700 1700 Sat flow rate, major rt vehicles: 1700 1700 Number of major street through lanes: 2 2 Length of study period, hrs: 0.25 Worksheet 4 Critical Gap and Follow-up time calculation. Critical Gap Calculations: Movement 4 7 9 t c,base 4.1 7.5 6.9 t c,hv 2.0 2.0 2.0 t by 0.00 0.00 0.00 t c,g 0.2 0.1 G 0.00 0.00 0.00 t 3,1t 0.0 0.7 0.0 t c,T: 1 stage 0.00 0.00 0.00 2 stage 0.00 1.00 0.00 t c 1 stage 4.1 6.8 6.9 2 stage 4.1 5.8 6.9 Follow Up Time Calculations: Movement 4 7 9 t f,base 2.2 3.5 3 .3 t f,HV 1.0 1.0 1.0 P by 0 .00 0.00 0.00 t f 2.2 3.5 3 .3 Worksheet 6 Impedance and capacity equations Step 1: FT from Minor St. 9 12 Conflicting Flows 189 Potential Capacity 826 Pedestrian Impedance Factor 1.00 Movement Capacity 826 Probability of Queue free St. 0.90 Step 2: LT from Major St. 4 1 Conflicting Flows 763 Potential Capacity 859 Pedestrian Impedance Factor 1.00 Movement Capacity 859 Probability of Queue free St. 0.91 7a - Computation of the effect of Two-stage gap acceptance 11 8 ______________ _ rom Minor St. 653 __ ___________ 467 Last Stage ____ ____ ----- --_ 379 r Flows 618 1.00 �Ppe 1.00 0 00 d octor Imp t 1.00 .91 ,n Impedanceeding m� 618 factor due to Impeding 1.00 ___--- 1.00 __________________ pacity _-___ i of queue free St. ____.._- _________________ ______________________ u 0ond Stage ------ 763 --�--��- 416 __Flow________ 6 653 1.00 7-l-ig Flows 1.00 it Capacity1.00 d Factor t 0 .91 416 0 y i Impedanceeding mvmn 427 _____________ factor due to Impeding __________________ t Capacity ---- ______-____ ingle Stage __ 1416 --- 1032 ___ _____________ 139 ___ __ Flows 235 1.00 cling CO 1 Capacity 0.91 era d e Factor 1t 0 .91 1 a an Impedance ________ ,o.� . factor due to Impeding m�m�n _______________________________ Capacity ____________21_____ :nt CaP _____ ____________ ___ _______ t stage process: 0.91 or 2 __ ___ ______________ __ 0.91 1.39 1.90 230 323 1.00 1.00 ______________________________ Ability of Queue free St. __________________ sheet 7b - Computation of the effect of Two-stage gap acceptance 10 7 _____ __________ • LT from Minor St. _ 653 Stage ____379_____ First _ --""- - - --"- 485 _-_______Flow_______ 6 9 1.00 3 8• ;cling Flows 1.00 0.91 < crian Capacity 1.00 factor e to oc Imp t 1 ------ h Impeding mvmr� 668 ____________________ r. Adz factor due Imp _--___ � -gent Capacity ______ --- 400-__- 189 Second Stage __________________ rt 2-____________________ 830 Flows 652 1.00 noting 1.00 0.90 > :ntri Capacity 0.91 Impedance Factor t .90 ____________ Impeding mvmn 96 -- to ImP ______________ 745 - Adj . factor due -_--_ �.ment Capacity _---—--" -_-_842 Single Stage ___ ________779-t 3- ___ __ _____ - 307 _________Flows_________ 337 9 1.00 -_tents ing 1.00 0.91 potential Capacity 0.91. Impedance Factor0.93 r-j .s L,Mi 0 .91 0.84 CapL. Min T Impedance factor ' Imp Factor. 0.93 L, Min T Adj . Impeding mamnt _____________ •�-� � due to ImP 315 ------""- factor -___________________________ Ant . ____________ Capacity _______________ ••-.vement CaP -_______- HCS : Signals Release 3 . 1b Inter: FRONTAGE RD - SITE ACCESS City/St : Analyst : GC Proj # : Date : 12/9/99 Period: ST L 1 � ... PM E/W St : SITE ACCESS N/S St : FRONTA ROAD SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 0 0 0 1 0 1 0 1 1 1 1 0 LGConfig L R T R L T Volume 310 35 240 255 60 325 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 5 5 Duration 0 . 25 Area Type : All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru P Right Right P Peds Peds WB Left P SB Left P Thru Thru P Right P Right Peds Peds NB Right P EB Right SB Right WB Right Green 30 . 0 35 . 0 Yellow 3 . 0 3 . 0 All Red 2 . 0 2 . 0 Cycle Length: 75 . 0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound L 722 1805 0 .48 0 .400 18 . 9 B 18 . 5 B R 646 1615 0 . 05 0 .400 13 . 9 B Northbound T 887 1900 0 . 30 0 .467 13 . 3 B 6 . 6 A R 1615 1615 0 . 17 1 . 000 0 . 2 A Southbound L 497 1066 0 . 13 0 .467 11 . 9 B T 887 1900 0 . 41 0 . 467 14 . 6 B 14 . 1 B Intersection Delay = 12 .3 (sec/veh) Intersection LOS = B HCS : Signals Release 3 . 1b Phone: Fax: E-Mail : OPERATIONAL ANALYSIS Intersection: FRONTAGE RD - SITE ACCESS City/State : Analyst : GC Project No: Time Period Analyzed: ST LT AM PM Date: 12/9/99 East/West Street Name : SITE ACCESS North/South Street Name : FRONTAGE ROAD VOLUME DATA Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 310 35 240 255 60 325 PHF 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 PK 15 Vol 86 10 67 71 17 90 Hi Ln Vol % Grade 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 ParkExist NumPark % Heavy Veh 0 0 0 0 0 0 No . Lanes 0 0 0 1 0 1 0 1 1 1 1 0 LGConfig L R T R L T Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 5 5 Adj Flow 344 33 267 278 67 361 %InSharedLn Prop Turns NumPeds 0 0 0 NumBus 0 0 0 0 0 0 Duration 0 . 25 Area Type : All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 3 3 3 3 3 3 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 1 5 6 7 8 EB Left NB Left Thru Thru P Right Right P Peds Peds WB Left P SB Left P Thru Thru P Right P Right Peds Peds NB Right P EB Right SB Right WB Right Green 30 . 0 35 . 0 Yellow 3 . 0 3 . 0 All Red 2 . 0 2 . 0 Cycle Length: 75 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop . Prop . Appr. / Mvt Flow No . Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 0 Thru 0 Right 0 Westbound Left 310 0 . 90 344 1 L 344 Thru 0 Right 35 0 . 90 33 1 R 5 33 Northbound Left 0 Thru 240 0 . 90 267 1 T 267 Right 255 0 . 90 278 1 R 5 278 Southbound Left 60 0 . 90 67 1 L 67 Thru 325 0 . 90 361 1 T 361 Right 0 * Value entered by user. SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Adj Lane Sat f f f f f f f f f Sat Group Flow W HV G P BE A LU RT LT Flow Eastbound Sec LT Adj /LT Sat : Westbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 ---- 0 . 950 18C5 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - -- - 1615 Northbound Sec LT Adj /LT Sat : T 1900 1 , 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 --- - 1615 Southbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 - - -- 0 . 561 1066 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green - -Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . Sec . Left Thru Right Westbound Pri , Sec . Left L 344 1805 # 0 . 19 0 .400 722 0 .48 Thru Right R 33 1615 0 . 02 0 .400 646 0 . 05 Northbound Pri . Sec . Left Thru T 267 1900 0 . 14 0 . 467 887 0 . 30 Right R 278 1615 0 . 17 1 . 000 1615 0 . 17 Southbound Pri . Sec . Left L 67 1066 0 . 06 0 .467 497 0 . 13 Thru T 361 1900 # 0 . 19 0 .467 887 0 .41 Right Sum (v/s) critical = 0 . 38 Lost Time/Cycle, L = 10 . 00 sec Critical v/c (X) = 0 .44 LEVEL OF SERVICE WORKSHEET _ Appr/ Ratios Unf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound Westbound L 0 .48 0 .400 16 . 7 1 . 000 722 0 . 50 2 . 2 0 . 0 18 . 9 B 18 . 5 B R 0 . 05 0 . 400 13 . 8 1 . 000 646 0 . 50 0 . 1 0 . 0 13 . 9 B Northbound T 0 . 30 0 .467 12 .4 1 . 000 887 0 . 50 0 . 9 0 . 0 13 . 3 B 6 . 6 A R 0 . 17 1 . 000 0 . 0 1 . 000 1615 0 . 50 0 .2 0 . 0 0 . 2 A Southbound L 0 . 13 0 . 467 11 .4 1 . 000 497 0 . 50 0 . 6 0 . 0 11 . 9 B T 0 . 41 0 .467 13 . 2 1 . 000 887 0 . 50 1 .4 0 . 0 14 . 6 B 14 . 1 B Intersection Delay = 12 . 3 (sec/veh) Intersection LOS = B SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G 35 . 0 Effective Green Time for Lane Group, g 35 . 00 Opposing Effective Green Time, go 35 . 0 Number of Lanes in Lane Group, N 1 Number of Opposing Lanes, No 1 Adjusted Left-Turn Flow Rate, Vlt 67 Proportion of Left Turns in Opposing Flow, Plto 0 . 00 Adjusted Opposing Flow Rate, Vo 267 Lost Time for Lane Group, tl 5 . 00 Left Turns per Cycle : LTC=V1tC/3600 1 . 40 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 5 . 56 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl , gf<=g 0 . 0 Opposing Queue Ratio : qro=1-Rpo (go/C) 0 . 53 gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gq<=g 1 . 97 gu =g-gq if gq>=gf, =g-gf if gq<gf 33 . 03 n= (gq-gf) /2 , n>=0 0 . 98 Ptho=1-Plto 1 . 00 P1*=Plt [1+{ (N-1) g/ (gf+gu/E11+4 .24) ) ) 1 . 00 Ell (Figure 9-7) 1 . 68 E12= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g 0 . 11 gdiff=max (gq-gf, 0) 0 . 00 fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) } ] , (min=fmin;max=1 . 00) 0 . 56 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (l+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt 0 . 561 For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>1, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes , flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle: LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp (- a * (LTC ** b) ) ] -tl, gf<=g Opposing Queue Ratio : qro=1-Rpo (go/C) gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gq<=g gu =g-gq if gq>=gf, =g-gf if gq<gf n= (gq-gf) /2 , n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) Ell= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g gdiff=max (gq-gf, 0) fm= [gf/g] + [gu/g] [1/{1+Pl (E11-1) }] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/ {1+Plt (E12-1) } ] + [gu/g] [1/ (l+Plt (Ell-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt Primary For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes , flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WELT NBLT SBLT Adj . LT Vol from Vol Adjustment Worksheet, v v/c ratio from Capacity Worksheet, X Primary phase effective green, g Secondary phase effective green, gq (From Supplemental Permitted LT Worksheet) , gu Cycle length, C 75 . 0 Red = (C-g-gq-gu) , r Arrivals : v/ (3600 (max (X, 1 . 0) ) ) , qa Primary ph. departures : s/3600, sp Secondary ph. departures : s (gq+gu) / (gu*3600) , ss XPerm XProt XCase Queue at beginning of green arrow, Qa Queue at beginning of unsaturated green, Qu Residual queue, Qr Uniform Delay, dl DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur. Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 12 . 3 sec/veh Intersection LOS B ERROR MESSAGES No errors to report . HCS : Signals Release 3 . 1b Inter: FRONTAGE RD - SITE ACCESS City/St : Analyst : GC Proj # : Date : 12/9/99 Period: ST LT AM PM E/W St : SITE ACCESS N/S St : FRONTA ROAD SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No . Lanes 0 0 0 1 0 1 0 1 1 1 1 0 LGConfig L R T R L T Volume 320 80 360 365 70 480 Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 5 5 Duration 0 . 25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru P Right Right P Peds Peds WB Left P SB Left P Thru Thru P Right P Right Peds Peds NB Right P EB Right SB Right WB Right Green 30 . 0 35 . 0 Yellow 3 . 0 3 . 0 All Red 2 . 0 2 . 0 Cycle Length: 75 . 0 secs Intersection Performance Summary _ Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capcity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound L 722 1805 0 .49 0 . 400 19 . 2 B 18 . 4 B R 646 1615 0 . 13 0 .400 14 . 6 B Northbound T 887 1900 0 .45 0 .467 15 . 2 B 7 . 8 A R 1615 1615 0 . 25 1 . 000 0 .4 A Southbound L 381 817 0 . 20 0 .467 13 . 0 B T 887 1900 0 . 60 0 .467 17 . 8 B 17 . 2 B Intersection Delay = 13 .4 (sec/veh) Intersection LOS = B HCS : Signals Release 3 . 1b Phone: Fax: E-Mail : OPERATIONAL ANALYSIS Intersection: FRONTAGE RD - SITE ACCESS City/State : Analyst : GC Project No : Time Period Analyzed: ST LT AM PM Date : 12/9/99 East/West Street Name: SITE ACCESS North/South Street Name : FRONTAGE ROAD VOLUME DATA Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Volume 320 80 360 365 70 480 PHF 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 0 . 90 PK 15 Vol 89 22 100 101 19 133 Hi Ln Vol Grade 0 0 0 Ideal Sat 1900 1900 1900 1900 1900 1900 ParkExist NumPark % Heavy Veh 0 0 0 0 0 0 No . Lanes 0 0 0 1 0 1 0 1 1 1 1 0 LGConfig L R T R L T Lane Width 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 RTOR Vol 5 5 Adj Flow 356 83 400 400 78 533 oInSharedLn Prop Turns NumPeds 0 0 0 NumBus 0 0 0 0 0 0 Duration 0 . 25 Area Type : All other areas OPERATING PARAMETERS Eastbound Westbound Northbound Southbound L T R L T R L T R L T R Init Unmet 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 Arriv. Type 3 3 3 3 3 3 Unit Ext . 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 3 . 0 I Factor 1 . 000 1 . 000 1 . 000 Lost Time 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ext of g 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 2 . 0 Ped Min g 0 . 0 0 . 0 0 . 0 PHASE DATA Phase Combination 1 2 3 4 I 5 6 7 8 EB Left NB Left Thru Thru P Right Right P Peds Peds WB Left P SB Left P Thru Thru P Right P Right Peds Peds NB Right P EB Right SB Right WB Right Green 30 . 0 35 . 0 Yellow 3 . 0 3 . 0 All Red 2 . 0 2 . 0 Cycle Length: 75 . 0 secs VOLUME ADJUSTMENT WORKSHEET Adjusted Prop . Prop . Appr. / Mvt Flow No . Lane Flow Rate Left Right Movement Volume PHF Rate Lanes Group RTOR In Lane Grp Turns Turns Eastbound Left 0 Thru 0 Right 0 Westbound Left 320 0 . 90 356 1 L 356 Thru 0 Right 80 0 . 90 83 1 R 5 83 Northbound Left 0 Thru 360 0 . 90 400 1 T 400 Right 365 0 . 90 400 1 R 5 400 Southbound Left 70 0 . 90 78 1 L 78 Thru 480 0 . 90 533 1 T 533 Right 0 * Value entered by user. SATURATION FLOW ADJUSTMENT WORKSHEET Appr/ Ideal Adj Lane Sat f f f f f f f f f Sat Group Flow W HV G P BB A LU RT LT Flow Eastbound Sec LT Adj /LT Sat : Westbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 -- -- 0 . 950 1805 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 - - - - 1615 Northbound Sec LT Adj /LT Sat : T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 R 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 0 . 850 ---- 1615 Southbound Sec LT Adj /LT Sat : L 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 - - -- 0 . 430 817 T 1900 1 . 000 1 . 000 1 . 000 1 . 000 1 . 000 1 . 00 1 . 00 1 . 000 1 . 000 1900 CAPACITY ANALYSIS WORKSHEET Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/C) (c) Ratio Eastbound Pri . Sec . Left Thru Right Westbound Pri . Sec . Left L 356 1805 # 0 . 20 0 .400 722 0 . 49 Thru Right R 83 1615 0 . 05 0 .400 646 0 . 13 Northbound Pri . Sec . Left Thru T 400 1900 0 . 21 0 . 467 887 0 . 45 Right R 400 1615 0 . 25 1 . 000 1615 0 . 25 Southbound Pri . Sec . Left L 78 817 0 . 10 0 .467 381 0 . 20 Thru T 533 1900 # 0 . 28 0 .467 887 0 . 60 Right Sum (v/s) critical = 0 . 48 Lost Time/Cycle, L = 10 . 00 sec Critical v/c (X) = 0 . 55 LEVEL OF SERVICE WORKSHEET Appr/ Ratios IInf Prog Lane Incremental Res Lane Group Approach Lane Del Adj Grp Factor Del Del Grp v/c g/C dl Fact Cap k d2 d3 Delay LOS Delay LOS Eastbound Westbound L 0 . 49 0 .400 16 . 8 1 . 000 722 0 . 50 2 . 4 0 . 0 19 . 2 B 18 . 4 B R 0 . 13 0 . 400 14 . 2 1 . 000 646 0 . 50 0 . 4 0 . 0 14 . 6 B Northbound T 0 . 45 0 . 467 13 . 5 1 . 000 887 0 . 50 1 . 7 0 . 0 15 . 2 B 7 . 8 A R 0 . 25 1 . 000 0 . 0 1 . 000 1615 0 . 50 0 .4 0 . 0 0 . 4 A Southbound L 0 . 20 0 .467 11 . 8 1 . 000 381 0 . 50 1 . 2 0 . 0 13 . 0 B T 0 . 60 0 .467 14 . 8 1 . 000 887 0 . 50 3 . 0 0 . 0 17 . 8 B 17 . 2 B Intersection Delay = 13 .4 (sec/veh) Intersection LOS = B SUPPLEMENTAL PERMITTED LT WORKSHEET for exclusive lefts APPROACH EB WB NB SB Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G 35 . 0 Effective Green Time for Lane Group, g 35 . 00 Opposing Effective Green Time, go 35 . 0 Number of Lanes in Lane Group, N 1 Number of Opposing Lanes, No 1 Adjusted Left-Turn Flow Rate, Vlt 78 Proportion of Left Turns in Opposing Flow, Plto 0 . 00 Adjusted Opposing Flow Rate, Vo 400 Lost Time for Lane Group, tl 5 . 00 Left Turns per Cycle : LTC=V1tC/3600 1 . 63 Opposing Flow per Lane, Per Cycle : Volc=VoC/3600f1uo 8 . 33 Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) 1 . 00 gf= [Gexp ( - a * (LTC ** b) ) ] -tl, gf<=g 0 . 0 Opposing Queue Ratio: qro=1-Rpo (go/C) 0 . 53 gq= (4 . 943Volc**0 . 762) (gro**1 . 061) -tl, gqc=g 6 . 43 gu =g-gq if gq>=gf, =g-gf if gq<gf 28 . 57 n= (gq-gf) /2 , n>=0 3 . 21 Ptho=1-Plto 1 . 00 Pl*=Plt [1+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) 1 . 00 Ell (Figure 9-7) 1 . 90 E12= (1-Ptho**n) /Plto, E12>=1 . 0 1 . 00 fmin=2 (1+Plt) /g or fmin=2 (l+Pl) /g 0 . 11 gdiff=max (gq-gf, 0) 0 . 00 fm= [gf/g] + [gu/g] [1/{1+Pl (Ell-1) }] , (min=fmin;max=1 . 00) 0 . 43 flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (1+Plt (E11-1) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** flt 0 . 430 For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL PERMITTED LT WORKSHEET for shared lefts APPROACH EB WB NB SE Cycle Length, C 75 . 0 sec Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Lanes in Lane Group, N Number of Opposing Lanes, No Adjusted Left-Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Proportion of Left Turns in Opposing Flow, Plto Adjusted Opposing Flow Rate, Vo Lost Time for Lane Group, tl Left Turns per Cycle : LTC=V1tC/3600 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600f1uo Opposing Platoon Ratio, Rpo (Table 9-2 or Eqn 9-7) gf= [Gexp (- a * (LTC ** b) 11 -tl , gf<=g Opposing Queue Ratio : qro=1-Rpo (go/C) gq= (4 . 943Vo1c**0 . 762) (gro**1 . 061) -tl, gq<=g gu =g-gq if gq>=gf, =g-gf if gq<gf n= (gq-gf) /2 , n>=0 Ptho=1-Plto P1*=Plt [l+{ (N-1) g/ (gf+gu/E11+4 . 24) ) ) Ell (Figure 9-7) E12= (1-Ptho**n) /Plto, E12>=1 . 0 fmin=2 (1+Plt) /g or fmin=2 (1+P1) /g gdiff=max(gq-gf, 0) fm= [gf/gl + [gu/g] [1/{l+Pl (E11-1) } ] , (min=fmin;max=1 . 00) flt=fm= [gf/g] +gdiff [1/{1+Plt (E12-1) } ] + [gu/g] [1/ (l+Plt (E11-l) ] , (min=fmin;max=1 . 0) or flt= [fm+0 . 91 (N-1) ] /N** fit Primary For special case of single-lane approach opposed by multilane approach, see text . * If Pl>=1 for shared left-turn lanes with N>l, then assume de-facto left-turn lane and redo calculations . ** For permitted left-turns with multiple exclusive left-turn lanes, flt=fm. For special case of multilane approach opposed by single-lane approach or when gf>gq, see text . SUPPLEMENTAL UNIFORM DELAY WORKSHEET EBLT WBLT NBLT SBLT Adj . LT Vol from Vol Adjustment Worksheet, v v/c ratio from Capacity Worksheet, X Primary phase effective green, g Secondary phase effective green, gq (From Supplemental Permitted LT Worksheet) , gu Cycle length, C 75 . 0 Red = (C-g-gq-gu) , r Arrivals : v/ (3600 (max (X, 1 . 0) ) ) , qa Primary ph. departures : s/3600 , sp Secondary ph. departures : s (gq+gu) / (gu*3600) , ss XPerm XProt XCase Queue at beginning of green arrow, Qa Queue at beginning of unsaturated green, Qu Residual queue, Qr Uniform Delay, dl DELAY/LOS WORKSHEET WITH INITIAL QUEUE Initial Dur. Uniform Delay Initial Final Initial Lane Appr/ Unmet Unmet Queue Unmet Queue Group Lane Demand Demand Unadj . Adj . Param. Demand Delay Delay Group Q veh t hrs . ds dl sec u Q veh d3 sec d sec Eastbound Westbound Northbound Southbound Intersection Delay 13 . 4 sec/veh Intersection LOS B ERROR MESSAGES No errors to report . Hello