HomeMy WebLinkAbout20002880 ��,a"a4vPp DENVER AIRPORTS DISTRICT OFFICE
26805 EAST 68th AVENUE, SUITE 2.'4
DENVER, COLORADO 80249-631 1
°S;ATB00''4' (303) 342-1255 fax: 342-1200
FEDERAL AVIATION
ADMINISTRATION
November 3, 2000
Mr. Robert Anderson, Planner
Weld County Planning Department
1555 N. 17th Ave.
Greeley, CO 80631
Dear Mr. Anderson:
Greeley-Weld County Airport Final PUD Case 5-563
Thank you for the opportunity to review the Final PUD layout for the airport.
We have several minor comments, which follow.
1. The airport owner should he encouraged to acquire all of the R/W 27 RPZ in fee sunp e
2. Publicly owned recreation areas near the airport, especially along the Cache La l'oudre
River, should be developed in locations where they will not interfere with airport
development occasioned due to changes in aeronautical activity. This is a concern jl
Section 303 of the DOT Act.
3. The Runway 34 RFZ's should be labeled existing since the R/W has been commissioned.
4. The outer dimension of the R/W 27 RPZ should be 1010' wide,not 1000' wide.
5. Thanks for showing the note about the Zoning Overlay District Disclosure requirement
so prominently.
Thanks for the opportunity to provide comment.
Sincerely,
J- es M. Fels, P.E.
Colorado State Planner
Denver Airports District Office
cc: Reisman, Lohne
2000-2880
ieicy t I,tm ,1 c i
r
a MEMORANDUM
TO: Robert Anderson, Plainer IDATE Oc obe 1C 000 .
'{ PROM: Diane Houghtaling, P I:., Traffic Enginee :D tr l ,,I
i:iii.titii:,.-itttit 11 #r
SUBJECT: S-563: G eeley-Weld County Airport PUD
:53r
COLORADO
The Weld County Public Works irpartrnent has reviewer this PUD Fir al Plan request.
COMMENTS:
External Roadways: A CDC' access permit will be required for F ver Road. WCR 62 and WC �, 43
designated as collector roads, w:iitch require a minimum BC foot right-of-way. The developer will ric ad tc aerlfy t
required right-of-way has beer Medicated. Intersection sight distance triangles will be shown n- tin plat
Ianiscaping i t the intersection sift distance triangles must be less than 3.5 feet high at maturity.
Interne S Roadways: The i oadwf: alignments do not meet the requirements of the subdivision leg slat oils.
developer should consult with th .Y%ublic Works Department in the realigr mentof the internal road.v.: s- '>t )p sit >
and street --ame signs will be recietred at al! intersections. The internal roadways will need to dedicate 6J fee t
right-of-way to the County. It is a .:leshabletouseknucklesinindustrialsubdivisionsduetotheincieasirgnom r
of large trucks. Fi aril plat must `s::accompanied by final roadway plane
Storm Water: A drainage rep repoR signed by a professional engineer censed in the State of C e era I will
required -he report will comply with the City of Greeley criteria.
Traffic Impacts: This developrneritwill require a traffic impact study. Tf e developer is encouraged-o ci i sutty
the Public works Department bei.re start ng the study-
RECOMMENDATION: Approvoi
o The internal roadways sF.i!I be realigned. The recuired right-of-way must remain cider Ott ow r-'rshq
the public
o The additional right-of-w%:+for the external roadways shall he dedicated to the public.
o Drainage and traffic imp:'ct studios will be required before app oval of the plat
o Sight distance triangles^ ;il be showy on the plat.
o The plat shall be drawn §., meet the requirements of the Colorado Revised Statues.
If you have any questions, plea34 call.
pc: S-563
WCR 62
WCR 43
SH 263
M_YNPF IL ES‘dianeA DEVELOP MENIAz- :a.md
a
#.
.5* PUBLIC WORKS DEPARTMENT
_,It fi
h: _ PHONE (970) 356-4000, EXT 375u
FAX: (970) 30=-643 '
WEBSITE www co.wel 1.a) .1
: 5i#;3. 1111 H STRE
P.O. 1BC fl
:.:.:.:.:•:.:.• ?: r fi;ffQ GREELEY, COLORADO. 306
COLORADO
August 23, 2000
Mr. Mike Reisman
Airport Manager
Greeley/Weld County Airport
P.O. Box 727
Greeley, CO 80632
Re: Airport Roadways
Dear Mike:
This letter shall serve as my assessment of the functional capacity of public roadwa is or.
the Greeley-Weld County Airport property.
The public roadways contained within the airport property are sufficient in functioral
classification and capacity based on current engineering and traffic capacity guideline;.
If you or others have questions regarding this issue„ please advise.
Sincerely,
; 0
/
Frank B. Hempen, Jr., P.B.
Director of Public Works/County Engineer
pc: Robert Anderson, Planning Services
Greeley/Weld County Airport file
m:\vrpf Iles\'rat i klai rprlrticap.wpd
Hello