Loading...
HomeMy WebLinkAbout20002577.tiff #1Th 1'/eld County Planning Dept. OCT 12 2000 PUBLIC WORKS DEPARTMENT PHONE (970) 356-4000, EXT 3754 RECEIVED FAX: (\,711, 3t;4-649 11 1 1 3 ST REE` wiipe BOY 75,. GREELEY, COLORADO 8003 COLORADO October I L 2000 Philip N.Soo III, P.E. LSC Transportation Consultants, Inc. 1889 York Street Denver, CO 80206 Dear Mr. Scott: I have reviewed the revised Traffic Impact Study for the Et.Lupton gravel mining facility and have the following cur iment k appears the acceleration and deceleration lanes on U. S. Highway 35 do not meet the requirements of the Colorado Star Highway Access Code. I apologize that I did not clarify that it would be the developer's responsibility to correct au substandard lane geometry. According to the I:. S. Highway 85 Access Controi Plan, no signal is planned tic the intersection of WCR 18 u d U. • Highway 85. Since it requires two-thirds of the approving agencies to modify the plan, it is unlikely a sigma; will ev' r occ,. at this intersection. In your report, you suggest restricting the eastbound left turn movements during the evenir g p:al: hors if a signal is not installed. The traffic snidy will be accepted if the developers agree to the following modifications: I. The acceleration and deceleration lanes on U. S. Highway 85 shall be improved to meet the requirement (tithe Colorado State Highway Access Code. 2. Eastbound left turns will be prohibited on weekdays between the hours of 4 p.m. snd 6 p.m. to ruainta the level of service on U. S. Highway 85. If you have any questions, please call me at (970) 356-4000 Ext. 3788. Sincerely, s/2' • Lfj.t 7-crl - Diane Diane M. Houghtaling, P.E affic Engineer pc USR-1255 Shen Lockman, Department of Planning Services L.G. Everist, Inc. 2000-2577 NUN/PRIES di neDl DEVELOPMENT l SR 1255 A.wp Hello