Loading...
HomeMy WebLinkAbout841139.tiff • PEpp aEc°w UNITED STATES t . 9 NUCLEAR REGULATORY COMMISSION n REGION IV "`�"`` 5 611 RYAN PLAZA DRIVE, SUITE 1000 '4 %2 e° ARLINGTON,TEXAS 76011 APR 2 4 1984 In Reply Refer To: P!r'n r �• ��,r� Docket: 50-267 LDI Ir-i;-� ,�g7..s IP" I APR 3 0 1984 '1 Mr. 0. R. Lee, Vice President cx'__ Electric Production Public Service Company of Colorado P.O. Box 840 Denver, Colorado 80201 Dear Mr. Lee: SUBJECT: FORT ST. DRAIN NUCLEAR GENERATING STATION, PROPOSED CHANGES TO THE ELECTRICAL SYSTEM REQUIREMENTS OF THE TECHNICAL SPECIFICATIONS In a letter from R. Tedesco (NRC) to D. Warembourg (PSC) dated August 25, 1980, NRC provided five pages of model Technical Specifications concerning requirements for (a) setpoints and surveillance of loss of power undervoltage relays on 4160V emergency buses, and (b) testing of diesel generators. These model Technical Specifications were to be incorporated into all facility operating licenses. In accordance with that letter, PSC was required to propose comparable Technical Specification changes to the Fort St. Vrain (FSV) operating license within 45 days. In reply to NRC' s new requirements, D. Warembourg letters to R. Tedesco dated October 15, 1980, and December 5, 1980, stated that additional time was necessary to prepare the submittal and obtain approvals from the Plant Operations Review Committee and the Nuclear Facility Safety Committee. A subsequent letter from D. Warembourg to R. Tedesco dated February 17, 1981 , requested that the submittal be deferred until such time that PSC could provide a response to and resolution of an NRC consultant' s questions on upcoming FSV electrical system modifications. In D. Warembourg' s letter to G. Kuzmycz dated September 16, 1982, PSC requested that the submittal again be deferred until FSV' s third refueling shutdown when modifications to the electrical system were planned, thus insuring that the proposal reflects as-installed conditions. Finally, in your letter to J. Collins (NRC) dated December 30, 1983, PSC responded to the aforementioned NRC letter of 1980 and proposed changes to the FSV Technical Specifications. The PSC proposal was also designed to increase the consistency between the overall electrical system requirements at FSV and those in the standard Technical Specifications (i .e. , NUREG-0452, Revision 4) , and it also reflected requirements for previously approved design changes to the 480V Class 1E buses and the 4160/480V transformers. 841139 C- MCo /O G ;,,t, vv Public Service Company of -2- APk ` y rsea Colorado The newly proposed Technical Specifications in PSC' s letter of December 30, 1983, did not address the required model Technical Specifications given in our letter of August 25, 1980. Our reviewer (D. Powers) inquired about this omission during discussions with PSC personnel at the FSV site on March 8, 1984, and -was told that these model Technical Specifications may be included in the Plant Protective System Technical Specifications that are to be submitted by January 31, 1985. We believe that such a delay will serve no useful purpose and that this issue can and should be resolved as soon as possible. Accordingly, we again request that PSC submit the required Technical Specifications that remain outstanding. We furthermore request that PSC respond to this concern within 30 days of receipt of this letter. Since this reporting requirement relates solely to the FSV facility, fewer than ten respondents are affected, therefore, clearance from the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, P. L. 96-511, is not required. Sincerely, E. H. Johnson, Chief Reactor Project Branch 1 Enclosure: As stated cc: Attached list Public Service Company of Colorado C. K. Millen Chairman , Board of County Comm. Senior Vice President of Weld County, Colorado Public Service Company Greeley, Colorado 80631 of Colorado P. 0. Box 840 Regional Representative Denver, Colorado 80201 Radiation Programs Environmental Protection Agency James B. Graham, Manager 1860 Lincoln Street Licensing and Regulation Denver, Colorado 80203 East Coast Office General Atomic Company Don Warembourg 2021 K Street, NW, Suite 709 Nuclear Production Manager Washington, DC 20006 Public Service Company of Colorado P. 0. Box 368 J. K. Fuller, Vice President Platteville, Colorado 80651 Public Service Company of Colorado Albert J. Hazle, Director P. 0. Box 840 Radiation Control Division Denver, Colorado 80201 Department of Health 4210 East 11th Avenue Denver, Colorado 80220 G. L. Plumlee NRC Senior Resident Inspector Kelly, Stansfield & O'Donnell P. 0. Box 640 Public Service Company Building Platteville, Colorado 80651 Room 900 550 15th Street Denver, Colorado 80202 Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Hello