We have rec'd and reviewed an engineered evaluation (dated August 15, 2000 by McRae and Short)of
the septic system in use at the Hall-Irwin Construction Company site. The evaluation fulfills Condition of
Approval 2.D. of AMUSR-1172. If you have any questions, please call me at X2214.
Trevor Jiricek
Environmental Health Services
Weld County Department of Public Health and Environment
tjiricek@co.weld.co.us
970-304-6415 Extension 2214
fz ! �
z? //7
2000-2136
CITIZEN INQUIRY FORM
WELD COUNTY DEPARTMENT OF PLANNING SERVICES/BUILDING INSPECTION
1400 N. 17th Avenue, Greeley, CO 80631
Phone: (970) 353-6100 Ext. 3540 Fax: (970) 352-6312
XTELEPHONE ❑ OFFICE FIRST INQUIRY? ❑ YES NO DATE: t// 4/co Li. y�1
IA
NAME: IA 0111 l a{�� PHONE:
ADDRESS: fl&A Le Avo z 't
TYPE OF INQUIRY: l (J
_ MHZP _ SKETCH PLAN _ MINOR SUB SKETCH PLAN
_ ZPMH _ PRELIMINARY PLAN MINOR SUB FINAL PLAT
RE _ FINAL PLAT _ ZONING
_ AMENDED RE _ RESUBDIVISION ADDRESSING
_ SE _ FHDP _ BUILDING PERMIT
AMENDED SE _ GHDP SETBACKS/OFFSETS
_ SITE PLAN REVIEW _ USR _ HOME OCCUPATION
REZONING _ AMENDED USR VIOLATION
_ PUD SKETCH PLAN X USR MINING Ara-)5C11-1* _ OTHER
_ PUD DISTRICT USR MAJOR FACILITY
PUD FINAL PLAT _ USR DISPOSAL SITE
STAFF PERSON: / ILILLY
ITEMS DISCUSSED:
Time Spent: )rY) I Staff Member's Initials: Lz" f
citizen.shl
CITIZEN INQUIRY FORM
WELD COUNTY DEPARTMENT OF PLANNING SERVICES/BUILDING INSPECTION
1400 N. 17th Avenue, Greeley, CO 80631
Phone: (970) 353-6100 Ext. 3540 Fax: (970) 352-6312
)( TELEPHONE ('❑AAOF�,FIC,,E FIRST INQUIRY? ❑ YES ❑ NO DATE: Iln'W
NAME: MOIFj LAMM u)I1t1ifIcApp(I ak.. PHONE:
ADDRESS:
TYPE OF INQUIRY:
_ MHZP _ SKETCH PLAN _ MINOR SUB SKETCH PLAN
_ ZPMH _ PRELIMINARY PLAN _ MINOR SUB FINAL PLAT
RE _ FINAL PLAT _ ZONING
- AMENDED RE _ RESUBDIVISION - ADDRESSING
SE _ FHDP _ BUILDING PERMIT
_ AMENDED SE - _GHDP SETBACKS/OFFSETS
SITE PLAN REVIEW - USR HOME OCCUPATION
-
REZONING AMENDED U VIOLATION
_ PUD SKETCH PLAN X- USR MININGI III _ OTHER
- PUD DISTRICT - USR MAJOR FACILITY _
PUD FINAL PLAT - USR DISPOSAL SITE _
STAFF PERSON: •
.
ITEMS DISCUSSED:(Alt it eletiote �7y
et/Atli at sufi'G issat.
Will att It) )QM
li.
The) I€ Au bill' iadent& +wit pliticlo iv
awlyvtAS hi s Jo retn4 '4u /
Time Spent: 5 \1 Staff Members Initials: �r 1
citizen.shi
Anne Johnson- Re: AmUSR 1172 Page 1
From: Sheble McConnellogue
To: Johnson, Anne
Date: 6/27/00 1:56PM
Subject: Re: AmUSR 1172
I have tried calling Molly at Tuttle Applegate, she was in a meeting. NO, I don't think it is sufficient because
that was for the original USR that didn't include the additional employees. I will call her again right now!
Thanks, Sheble
Sheble McConnellogue
Environmental Health Services
Weld County Department of Public Health & Environment
smcconne@co.weld.co.us
>>>Anne Johnson 06/27/00 11:25AM >>>
So, you're the last to sign off on their permit. Do they have the correct septic stuff, Condition of Approval
D?
Anne Johnson - Re: AmUSR 1172 Page 1
From: Sheble McConnellogue
To: Johnson, Anne
Date: 6/27/00 2:01 PM
Subject: Re: AmUSR 1172
I just spoke with Molly and she will have the engineer write an evaluation letter and fax it my way. Later,
Sheble
Sheble McConnellogue
Environmental Health Services
Weld County Department of Public Health & Environment
smcconne@co.weld.co.us
>>>Anne Johnson 06/27/00 11:25AM >>>
So, you're the last to sign off on their permit. Do they have the correct septic stuff, Condition of Approval
D?
Page 5 Colorado Department of Public Health and Environment
Air Pollution Control Division
Hall-Irwin Construction Company
Permit No. 98WE0005
Final Approval
PARTICULATE EMISSIONS CONTROL PLAN FOR MINING AND PROCESSING ACTIVITIES
THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE
PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY
CONTROL COMMISSION REGULATION NO.1, SECTION III.D.1.b. THIS SOURCE IS SUBJECT TO THE
FOLLOWING EMISSION GUIDELINES:
a. Mining and Processing Activities - Visible emissions not to exceed 20%, no off-property transport
of visible emissions.
b. Haul Roads - No off-property transport of visible emissions shall apply to on-site haul roads, the
nuisance guidelines shall apply to off-site haul roads.
c. Haul Trucks - No off-property transport of visible emissions except that when operating off the
property of the owner or operator, the applicable guidelines shall be no off-vehicle transport of
visible emissions.
Control Measures
1. Adequate soil moisture must be maintained in-topsoil and overburden to control emissions during
removal. Watering shall be implemented if necessary.
2. Topsoil and overburden stockpiles shall be compacted and revegetated within one year.
3. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering
at all times unless natural moisture is sufficient to control emissions.
4. Vehicle speed on unpaved roads and disturbed areas shall not exceed a maximum of 20 m.p.h.
Speed limit signs shall be posted.
5. Vehicle speed on haul roads and service roads shall be restricted to 20 miles per hour. Speed limit
signs shall be posted.
6. Unpaved haul roads shall be watered as often as needed to control fugitive particulate emissions
such that the above guidelines are met.
7. Reclamation works and sequential extraction of material shall be initiated to keep the total
disturbed areas at any one time to a minimum.
8. Material stockpiles shall be watered as necessary to control fugitive particulate emissions.
Aggregate materials shall be sprayed with water during material loading into the storage bins or
stockpiles.
9. Plant entryway, truck service roads, and concrete batching areas shall be graveled. Watering shall
be implemented if emission guidelines above are not met.
123/0530/001
•
?� (1 DEPARTMENT OF PUBLIC HEALTHAND ENVIRONMENT
1555 N. 17TH AVENUE
GREELEY,COLORADO 80631
ADMINISTRATION(970)304-6410
PUBLIC HEALTH EDUCATION AND NURSING(970)304-6420
C FAX(970)304-6416
O ENVIRONMENTAL HEALTH SERVICES(970)304-6415
FAX(970)304-6411
COLORADO
MEMORANDUM
TO: Anne Best-Johnson DATE: June 26, 2000
FROM: Troy E. SwairV4
SUBJECT: Dust Abatement Plan for Amended USR-1172
The department has received the fugitive dust control plan for Amended USR-1172 dated June
23, 2000. Hall-Irwin Construction Company proposes using the fugitive emissions control plan
and dust control measures found in their Colorado Department of Public Health&
Environment's Air Pollution Control Division issued Construction Permit. The control plan and
dust control measures can be found on page 5 of the Construction Permit Number 98WE0005
(Final Approval 8/17/99). A copy of Hall-Irwin Construction Company's Dust Abatement Plan
is attached.
Please accept this memo as the Environmental Health Division's approval of the attached Dust
Abatement Plan for Hall-Irwin Construction Company for the mining site located at 11723 Weld
County Road 2.
cc: Sheble McConnellogue
.I 2UW(�UsalI„m.1)
Weld County Planning Cep,
- JUN 23 2000
mttleAppiegate,inc. RECEIVED
Consultants for Land,Mineral and Water Development
LETTER OF TRANSMITTAL
DATE: June 23, 2000 PROJECT: 99-228
TO: Anne Best-Johnson
Weld County Department of Planning Services
1555 N. 17th Avenue
Greeley, CO 80631
Hand delivered
WE TRANSMIT: THE FOLLOWING: FOR YOUR:
® Attached n Prints/Bluelines ■ Use
nUnder Separate Cover ® Originals ❑ Approval
nInformation Below ❑ Copy of Letter n Information
InApplications n Review & Comment
nSpecifications n Material Returned
® Other n Revise &Resubmit
Number of Copies Dated Sheet No. Description
1 6/00 Amended USR plat for recording (mylar)
1 6/00 Letter
1 6/00 Recording fee—check for$30.00
Remarks:
Please call if you have any questions.
Copy to: File 99-228 Signed: /l L at - «ki
w/Enclosures:
11990 Grant Street, Suite 304 .Denver,Colorado 80233 ■(303)452-6611 ■Fax(303)452-2759
- ==
tainSis
SUN INIMIES
Se
lbttleAppiegate,In.
Consultants for Land, Mineral and Water
June 23, 2000
Anne Best-Johnson
Weld County Department of Planning Services
1555 N. 17th Avenue
Greeley, CO 80631
RE: Approval of a Site Specific Development Plan and Amendment to Special Review
Permit#1172 —Hall Irwin Construction Company
Dear Anne:
The conditions identified under the resolution for the above project are addressed as
follows:
1. The attached Development Standards for the Special Review Permit shall be
adopted and placed on the Special Review Plat prior to recording the plat. The
completed plat shall be delivered to the Department of Planning Services and be
ready for recording in the Weld County Clerk and Recorder's Office within 30
days of approval by the Board of County Commissioners.
The development standards adopted for the Special Review Permit have been
placed on the Special Review Plat and delivered to the Department of Planning
Services for recording within 30 days of approval by the Board of the County
Commissioners.
2. Prior to recording the plat:
A. The plat is to be amended to include all development standards for Use by
Special Review Permit#1172 on the plat for the Amended Use by Special
Review Permit #1172.
This has been completed and is illustrated on Sheet 3 of the amended plat.
B. The applicant will submit to the Weld County Department of Planning
Services, documentation to indicate this amended use will not require an
amendment to the Flood Hazard Development Permit.
1 i 990 Grant St. • Suite 304 • Denver, CO 80233 5441 Boeing Drive • Suite 200 • Loveland, CO 80538-8855
(303) 452-6611 • Fax (303) 452-2759 (970) 461-9884 • Fax (970) 613-1177
Amended Special Review Permit#1172
Page 2 of 3
A letter from a licensed engineer is enclosed addressing this issue (see
Exhibit A).
C. The applicant shall use the existing trailer for bathroom facilities. This
trailer is located 100 feet from the proposed trailer location. The plat shall
be amended to illustrate this change.
The applicant will use the existing trailer for bathroom facilities. The
existing trailer is located 100 feet from the proposed trailer location and
is illustrated on the amended plat.
D. The existing septic system for the existing trailer shall be reviewed by a
Colorado Registered Engineer. The review shall consist of an observation
of the system and a technical review describing the system's ability to
handle the proposed hydraulic load. The review shall be submitted to the
Weld County Department of Public Health and Environment, Environ-
mental Health Services Division. In the event the system is found to be
inadequately sized or constructed, the system shall be brought into
compliance with current regulations.
Enclosed is a report submitted to the Environmental Health Services—
Weld County Health Department for the septic system. Also, enclosed is
the permit for the septic system issued by Weld County (see Exhibit B).
E. The operator shall submit a dust abatement plan for approval to the Weld
County Department of Public Health and Environment and Planning
Services.
Please find enclosed an approved Construction Permit from the Colorado
Department of Public Health and Environment—Air Pollution Control
Division for air pollution emissions that will be produced on-site. On
page 5 of this permit are the control measures of the dust abatement plan
that the applicant must adhere to in order be in compliance with the
permit (see Exhibit C).
F. All storm water drainage shall flow north toward the pit and into the
dewatering trenches.
Where possible, storm water drainage will be directed north toward the
pit and into dewatering trenches.
G. Weld County Road 2 is designated as an arterial roadway. Access to the
amended site shall be from Weld County Road 2 (168th Avenue) to the
existing Hall-Irwin Sand and Gravel Mining Operation. No additional
accesses will be granted to Weld County Road 2.
Amended Special Review Permit#1172
Page 3 of 3
Access to the amended site will be from Weld County Road 2.
H. Additional parking areas shall be provided to accommodate the landscape
materials sales. The plat shall be amended to show all parking areas.
A parking area is illustrated on the amended plat for the landscape sales
area.
3. The Special Review activity shall not occur nor shall any building or electrical
permits be issued on the property until the Special Review plat is ready to be
recorded in the office of the Weld County Clerk and Recorder.
The applicant is willing to comply with this condition.
If you should any further questions,please do not hesitate to contact me.
Sincerely,
TUTTLEAPPLEGATE, INC.
/l-tel CPS — L17
Molly Orkild-Larson, AICP
cc: Dwayne Wood, Jeff Greg—Hall-Irwin Company
File 99-228
EXHIBIT A
—
7bttleApplegate,lnc.
Consultants for Land, Mineral and Water
June 21,2000
Anne Best-Johnson
Weld County Department of Planning Services
1555 N. 17th Avenue
Greeley, CO 80631
RE: Amendment to Special Review Permit#1172—Hall Irwin Company
Effect on the Flood Hazard Development Permit
This letter is to serve as documentation that the amended use of the Baseline Resource property
will not require an amendment to the Flood Hazard Development Permit. A Flood Hazard
Development Permit was submitted and approved for the Baseline Resource property. The
analysis and results of the permit are still valid. The amendment to the Special Review permit
#1172 is to add a Landscape Materials sales yard.
The temporary landscape material stockpiles are small spaced piles. Therefore flow is not fully
obstructed as it passes through the area. Consequently the overall flow area is not reduced from
the original anticipated flow area with the prior approved use. Thus the water surface elevation
will not be increased.
The scale house finish floor elevation and leach field design and elevation were subject to
specific, detailed study and design in a Weld County Health Department permit application by
McRae& Short, dated January 16, 1998, and are not affected by this amendment.
Therefore it is our determination that the amended use does not alter the Flood Hazard in this
area.
Cordially,
Tuttle Applegate, Inc. ( • - t
721,
4)
Dan Giroux, P.E. •
Cc: Jeff Gregg, Hall-Irwin Construction
File#99-228
11990 Grant St. • Suite 304 • Denver, CO 80233 5441 Boeing Drive. • Suite 200 • Loveland, CO 80536-8855
(303) 452-6611 • Fax (303) 452-2759 (970) 461-9884 • Fax (970) 613-1177
f ( EXHIBIT B
/ WELD COUNTY HEALTH DEPARTMENT
1517 16TH AVENUE COURT, GREELEY, CO 80631
(970) 353-0635 EXT 2225 FAX (970) 356-4966
Fina led
Permit # : SP-9800114 Sec/Twn/Rng: 36 01 67 Status : r'SsUao
Permit Type : CNEW C=commercial, R=residential . NEW, REPair, VauLT
Applied : 03/25/1998
Parcel No : 1469 36 0000" i Issued : 04/28/1998
Finaled: ID, tt i ( gt(b'
Location : 11723 WCR : FOR MANUFACTURED HOME TEMP > _. 7 OFC
Legal Desc : 20188 SE4 5 1 67 ,AXC BEG 30 ' N OF SE CC. Y ) ' N1
11585 2 CR WELD
APPLICANT GREGG J : 970-352-6284
P O BOX 487, JOHNSTOWN, CO 80534
OWNER HIBE LLC _ hol_ 352-6284
P O BOX 487, JOHNSTOWN, 7O 0534
SEPT-ENGR MCRAE & SHORT INC (970) 356-3101
1231 8TH AVENUE, GREELEY, COLORADO 806 _
SEPT-INSTL GREIN CONSTRUCTION I'TC _�h . : (303 ) 659-3969
PO BOX 381, BRIGHTON CO 80601
Description: HWY 85 SOUTH T'm '•7'' 72, TO JOB SITE
Commercial (Y/N) : y Resiat._ N acres : 89 . 00
Number of Persons : Basement Plumbing (Y/N) : N
Number of Bedrooms : Bathrooms-> Full : 1/2 : 1
Water Public (Y/N) : N Utility Name :
Water Private (Y/N) : Y Cistern (Y/N) : N ' >.l f/N) : Y
Water Permit No :
Percolation Rate : c 5 . 0 Limiting Zone : 01 ft 00 in Desc: . SAND & GRAVEL
°s Ground Slope : Dir: Soil Suitable (Y/N) : N
Engineer Design Req' d (Y/N) : Y In 100 Yr Flood Plain (Y/N) : Y •
Minimum Installation
Septic Tank : 1000 gal Absorption Trench: sq. ft .
Absorption Bed: 165 sq. ft .
Actual Installation
Septic Tank : loci° gal Absorption Trench: sq. ft .
Absorption Bed: "ci.D sq. ft .
Design Type :
- -- ----- ------- - - - - --- --------------- ---------------------------- -- -- --- ---- -- -
NOTICE
The issuance of this permit does not imply compliance with other state, county or local regulatory or building requirements, nor
shall it act Co certify that the subject system will operate in compliance with applicable state, county and local regulations
adopted persuant to Article 10, Title 25, CRS as amended, except for the purpose of establishing final approval of installed
system for issuance of a local occupancy permit persuant to CRS 1973 25-10-111 121 .
This permit is not transferable. The Weld County Health Department reserves the right to impose additional terms and conditions
required to meet our regul :ions on a continuing basis. Final permit approval was contingent upon the final inspection of the
completed system by the Weld County Health Department.
X )Clu\A yF
4 McRAE & SHORT, INC.
1231 8th Avenue
Greeley, Colorado 80631
Telephone (97a 356-3101
Engineering, Surveying, Planning & Land Development
January 16, 1998
PROJECT NO. 97015
Environmental Health Services
Weld County Health Department
1517 - 16th Avenue Court
Greeley, CO 80631
RE: INDIVIDUAL SEWAGE DISPOSAL SYSTEM - HALL IRWIN CONSTRUCTION CO.
BASELINE RESOURCE OFFICE/SCALE HOUSE, 11723 WCR No. 2, WELD
COUNTY, COLORADO
LOCATION: Part of the Southeast Quarter, Section 36, Township I North, Range
67 West of the 6th P.M. , Weld County, Colorado.
GENERAL: Hall- Irwin is opening a new gravel resource pit at this location.
A new Scale House/ Office will be built to serve the gravel pit op-
eration. A Use By Special Review, and Flood Hazard Permits are
being processed through Weld County Department of Planning. Based
on these permits and prior topographic surveys, and soils boring,
we know the soil to be sand and gravel .
To extract the sand and gravel from the pit areas, the groundwater
will be lowered and stabilized by pumping to 15 to 20 feet below
the surface. This procedure will also lower the water table under
the leach field to at least 8 feet below the surface.
Due to the site conditions and commercial operation, this engineered
design system is proposed. Ground elevation at site is 4946.6±.
SYSTEM ANALYSIS:
The leach field area is to be replaced with a minimum of 4 feet of
suitable soil below the field. The top of the leach field area is
to be at a minimum elevation of 4952.5, the Regulatory Elevation
for protection from the 100-Year Flood Level . *See note.
SYSTEM DESIGN: SEWAGE LOAD - OFFICE/SCALE HOUSE:
5 day workers @ 15 gpd = 75 gpd
Peak loading 150 % X 1 . 5
Design Loading = 115 gpd
January i6, 1998
Environmental Health Services
PROJECT NO. 97015
RE: INDIVIDUAL SEWAGE DISPOSAL SYSTEM - HALL-IRWIN CONSTRUCTION CO
BASELINE RESOURCE OFFICE/SCALE HOUSE, 11723 WCR #2, WELD COUNTY,
COLORADO.
SEPTIC TANK:
115 gpd X 30 hr./24 hr retention = 145 gallons
Use Standard 1000 gallon Septic Tank (Minimum Size) .
If required, a lift station, located after the septic tank, with
a standard sump pump, 1 /3 to 1 /2 hp, 15 to 20 gpm at 8 to 10 feet
of head and mercury switch controls should be installed.
LEACH FIELD: STANDARD BED
Standard bed with perforated pipe distribution, selected gravel
encasement, silt barrier and top soil cover.
Bed size based on a percolation rate of 15 mpi for the replace-
ment soil .
BED AREA = X �/ X 1 .30 I
3.5
AREA = 115 X IS X 1 .3 = 165 SF
3.5
ALTERNATE BED SIZES: (MINIMUM)
Width Length Area Description
6' X 28' = 168 SF ( 1 line X 28' )
12' X 14' = 168 SF (2 lines X 14' )
LEACH FIELD - ALTERNATE WITH INFILTRATOR UNITS:
Standard absorption bed 165 SF
Infiltrator System Factor X 0.50
Infiltrator Bed Size 83 SF
INFILTRATOR UNITS:
83 SF = 5.3 Units . . . . Use 6 Units (Minimum)
15.6 SF/Unit
INFILTRATOR LAYOUT: ( One Unit is 3' wide X 6.25' long)
Leach Area Bed Area
3' X 37.5' = 112.5 SF
row X 6 Units = 6 Units = 93.65SF
2 rows X 3 Units = 6 Units = 93.65 SF 6' X 18.75' = 112.5 SF
Environmental Health Services January 16, 1998
PROJECT NO. 97015
RE: INDIVIDUAL SEWAGE DISPOSAL SYSTEM - HALL IRWIN
CONSTRUCTION CO, BASELINE RESOURCE OFFICE/SCALE
HOUSE, 11723 WCR NO. 2, WELD COUNTY, COLORADO
NOTES:
The absorption bed area is to be fenced or barricaded to prevent
large animals or vehicular use of surface above the bed.
The attached General Notes and Design Specifications shall be
used in conjuntion with the standards established by the Weld
County Health Department.
``'`,`UNUatuununp
O RFCi,
t
McRae 8 Short, Inc. -i:'44 ,4;...Mt
=D :" 6616 mrn=
SO dered,X 71 <9) ...... - •
hil ND eser----7
Gerald B. McRae, Professional nglhllew and
Land Surveyor, Colorado Reg. No. 6616
Enclosures: Specifications and Detail
Vicinity Map
Flood Plain Information (2)
*NOTE: The 100-Year Flood Plain is shown on the Flood Insurance Rate Map, Community
Panel No. 080266-0995-C, dated September 28, 1982. The elevation of the
port on the South PlaTte River, Volume I , Weld County, Colorado prepared by
the Corps of Engineers in April 1977.
McRAE & SHORT, INC. CLIENT HALL -64N 9701 5
PROJECT NO.
Greeley, Colorado PROJECT BASELINE RESOURCES - SEWAGE D I SPOSAL
Engineering, Surveying MADE BY DATE_CHECKED BY_DATE_SHEET L ,S
OF
GENERAL NOTES
I . ALL CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE WELD COUNTY HEALTH
DEPARTMENT AND STATE REGULATIONS.
2. ANY DEVIATIONS FROM THE PLAN MUST BE APPROVED PRIOR TO CONSTRUCTION BY
THE WELD COUNTY HEALTH DEPARTMENT AND/OR THE DESIGN ENGINEER.
3. ALL PARTS OF THE FIELD SHALL BE LOCATED A MINIMUM OF 10 FEET FROM ALL
PROPERTY LINES, A MINIMUM OF 20 FEET FROM ALL BUILDINGS, AND THE REQUIRED
MINIMUM DISTANCES FROM ALL OTHER PERTINENT LAND FEATURES.
4. THE SYSTEM SHALL BE INSPECTED BY THE WELD COUNTY HEALTH DEPARTMENT AND/
OR THE DESIGN ENGINEER DURING THE CRITICAL PARTS OF CONSTRUCTION OF THE
SYSTEM.
5. POSITIVE DRAINAGE SHOULD BE PROVIDED TO MINIM4ZE SURFACE RUNOFF WATER
FROM ENTERING THE SYSTEM.
6. THE TOP OF THE FIELD AND FILL SLOPES SHOULD BE SEEDED OR SODDED WITH
LAWN GRASS OR EQUAL TO CONTROL EROSION AND TO AID THE EVAPORATION-TRANS-
PIRATION PROCESS.
THE PLANTING OF LARGE TREES, SHRUBS, OR ANY DEEP-ROOTING PLANT SHOULD
BE PROHIBITED.
7. NO PART OF THE FIELD SHOULD BE COVERED WITH PAVEMENT OR GRAVEL NOR SHOULD
THE FIELD BE DRIVEN OVER.
8. IT IS IMPORTANT THAT TRACTOR TREAD COMPACTION OF THE SOILS AT THE BOTTOM
OF THE BED BE MINIMIZED SO THAT THESE SOILS DO NOT BECOME IMPERMEABLE
FOR THE ABSORPTION OF THE EFFLUENT. IF THESE SOILS ARE COMPACTED, IT IS
RECOMMENDED THAT THE BOTTOM OF THE EXCAVATION BE LOOSENED AND ROUGHENED
PRIOR TO PLACEMENT OF THE SAND.
DESIGN SPECIFICATIONS
I . SEPTIC TANK - I000GALLONS (MINIMUM) PRECAST TANK CONSISTING OF 2 COMPART-
MENTS.
2. BED AREA- 165 SQUARE FEET (MINIMUM) WITH LEVEL BOTTOM 8 LAYERS.
3. ENGINEERED FILL MATERIAL - 4 FEET (MINIMUM) OF MATERIAL COMPOSED OF IM-
PORTED, WELL GRADED GRANULAR MATERIAL APPROVED BY THE ENGINEER. THE EN-
GINEERED FILL SHALL BE PLACED IN 6" to 8" LIFTS AND MECHANICALLY COMPACTED
TO 85% OF STANDARD PROCTOR DENSITY ASTM D 698-78 AND HAVE A PERCOLATION
RATE OF BETWEEN 5 AND 15 MINUTES/INCH (SEE DESIGN) . THE FILL SHOULD NOT
BE OVERCOMPACTED. SUBMIT MATERIAL SAMPLE FOR APPROVAL PRIOR TO CONSTRUC-
TION. FIELD DENSITY TESTS SHOULD BE PERFORMED IN THE ENGINEERED FILL
AND SUBMITTED TO THE WELD COUNTY HEALTH DEPARTMENT.
n- TANDARD DESIGN,
REPLAL,_,L.,. __ ; �. ,NL i�; livi ,.:-r... �- 'EEi� THE uivI is SHALL GE 1HE $6ML
AS THE REPLACEMENT SOIL, EXTENDING AT LEAST 2" ABOVE THE UNITS.
5. COVER - UNTREATED BUILDING PAPER PLACED OVER THE ABSORPTION MATERIAL TO
PREVENT THE BED FROM BEING CLOGGED DURING BACKFILLING OPERATION ON STANDARD BED.
6. APPROVED BACKFILL MATERIAL - 10 TO 18 INCHES (MAXIMUM) OF SELECT SILTY
SAND AND/OR SANDY SILT. SUBMIT MATERIAL SAMPLE FOR APPROVAL PRIOR TO CON-
STRUCTION.
McRAE & SHORT, INC. CLIENT HALL—IRWIN PROJECT No. 97015
Greeley, Colorado4
Engineering, Surveying PROJECT BASELINE RESOURCES - SEWAGE DISPOSAL SYSTEM
MADE BY DATE CHECKED BY DATE SHEET 2 OF S
b b
v o
o o e c\k /c/ W
b 4- "
o l
h - o
l
O O c o a a IL 0 co cn fi <, I�� ti
a
• .%Y
4.
O
V
o\ . , % 114E
� D m 4o
-
t O le U) D.—
(Id b f -r- 1 a 0 0 (0C
` L
' • O
�.
a / k cc,' a:
W
)N .-J S.
*/VA
I
McRAE & SHORT, INC. CLIENT HALL-IRWIN PROJECT NO. 97015
Greeley, Colorado4
PROJECT BASELINE RESOURCES - SEWAGE DISPOSAL SYSTEM
Engineering, Surveying MADE BY DATE_CHECKED BY_DATE_SHEET OF S
_)__
-.�49eo— / � I � n ) ..
a I
J r
it
.._- •--.\ soon
•
\9Vatteaberg �// L • - "• I. /45 . �. 4915 I49w 4950
It 4.950 5000 wy . ,y�.� /
0 ti
t
Z
--:-\:)\ , ,.,.,, _ 30 �
II
4 /
- IraI
,o
� -- --2.4.—
__ e t rc k,-• �� / 496.
I II
O N C44 as1946 =_ l �� �� 4960
Ca 4. ' 1/ •-
_ _ - ;
14 n
SF,� = O
499: _ i
CQ 4
�//�r��.y,�^-� ��jp�]y�• 50.(e� e :p \ __G::fl•}y_ !/ BA3,
,Natt'if r`e 4 4:7"N F~;� oWell e (tom }� I� 1 I� I `� I i-" /�ru '
f�.;l '' \ •
is �C / Well4 c—
M : L
. . ...._
of \ N �. G:p40 ° �0rn � I I
6 I
r.i � Iyiii o
,,
a77. I�� . ie I I. � •
/—'—I Wen oo
oITL` —LJ •
i yo`'o a I
b{alms j I
'f well.. __ — : t LI�IbOTH A R<96I -♦ �•f t—'.�.- �. —
1 A a \�1
'':o I • .
® a
•
-iri u, •
! _
k • .
_ice . y..' •,1 • ✓� �}{( J1• .4k' (c.
lt
` • •t C:
•1• 'ir
•• • La' rf }
•
t '- s. • ` • .
/ i. ...,.. 4._..,,/.3.,- ..,,,...,./•:..: .. . . ..
01 . .
•
red
. '..","',;1.1,1;•.;
•
-�. y� [!,
...r•
Yr,.✓ •.c i
11 vs.. w •
a •a', \.7 r at'— Zetr. z . AK:: .D }r I.PicriftYla` 1 tiZ`�" yam•, t ., �y
r.� " S„b•Rts - yy.? " f3 \'r` � •.C•w_
T+ tta+ �Y, �Z.} r a.. 51 ,..E---' ( _7 r " • r .r.. _
. • -; •- -eXtavt..• '
•
f : .c` ♦ ? `� may, ` a Apr
�. •'VI• lar y, •
.sr 1 _. `10 r ,HIS j .� a a: y' i S,. -colt 8 i
SOUTH PLATTE RIVER BASIN
WELD COUNTY, COLORADO
A " SOUTH PLATTE RIVER
FLOODED AREA
1: 3 ARMY c'aCjr5ER r,cio'rT OMA'i!A
CDHPS CF E--IGINELR°-, 11RSAHA NENHnSY,.1
APRIL 1977 PI •
-TALL— IRWIN — 1 SIDS, BASELINE RESOURCE McRAE Si SHORT, INC. PROJECT NO. 97015 <2-ac4-
.
4960, - , +¢ " i - I - - -
■:�:_ ■:s■�i:. ::_:::: • u ::::::
4-4
1. ■
ri - _ _ _
n5. _ _ ..
4955 � :.�0:1_ _I T
1111 - - 1 Ill
495/s . 11 ; } 1 11
4950 t, ,���N. _ I t
I _
-_ � i '■=ii r ■ � 4 I 1 1 ' ` -
--tit
:■ �� tin- -Y-4 }t t---F-+;. }- - ■ -
\ -- 1 r >-
4945 ^ ! +t I . 1 ,' +1 I 171 I 4- I -- . 1
4940
' I
r-+1 �.. t *-L I I■ -- ■ ~ � 1 � ■.t �i J-:-
w 1- .. " ' 4 4- --- - - �- ILL:
U_
■■ 1 Cfl _. ..�,�■■■■■■�
iz 4935 - D W ' -�. I ■ j`•si
- E ° ~ �■_■ —:■_ ' �, 1111111111
4930 T W F < U.. 11011 1!1 __ ■ ►.. SCI=11111
- < D5. —i soa ..�_ .� �.�' .. _.. _ _���•
H- O I Cl. - O LEGEND Ell
-■ ��� 't��
1973 HIGH WATER MARK
= O j 500 YEAR FLOOD - , ■ _
4925 - p 3 V - -- - 100 YEAR FLOOD
- u) - 50 YEAR FLOOD J
10 YEAR FLOOD
Y. STREAM BED
4920 - 23 CROSS SELOCATCTION
— 'I ATE E _ __I■ ■�■■■■■■■■■■
4915 ■■
15500+00 15460+00 15420+00
DISTANCE IN FEET ABOVE $
-ALt- IRYJIY N- I SDS, BASEL I F RESOURCE McRAE & SHORT, INC. MOUTH
EXHIBIT C
STATE OF COLORADO
COLO
RADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
AIR POLLUTION CONTROL DIVISION
TELEPHONE: (303) 692-3150 91
476*
CONSTRUCTION PERMIT
PERMIT NO: 98WE0005
FINAL APPROVAL
DATE ISSUED: AUGUST 17, 1999
ISSUED TO: Hall-Irwin Construction Company
THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:
Sand and gravel pit operation located in NW 34 Section 31, T1N, R66W; E %] Section 36,
T1 N, R67W, one mile west of Brighton on Baseline Road, Weld County, Colorado.
THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING:
Material Extraction, Handling, Stockpiling, Hauling, and Associated Conveyors and Transfer
Points.
THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR
QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY CONTROL ACT C.R.S. (25.7-101)
et seq), TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE REVERSE SIDE OF THIS
DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS:
1. Visible emissions from processing equipment transfer points shall not exceed twenty percent (20%)
opacity during normal operation of the source. During periods of startup, process modification, or
adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six
minutes in any sixty consecutive minutes. Opacity shall be measured by EPA Method 9.
(Reference: Regulation 1, Section II.A.1.& 4.)
2. The particulate emission control measures listed on the attached page (as approved by the Division)
shall be applied to the particulate emission producing sources as required by Regulation No. 1,
Section III.D.1.b.
3. This source shall be limited to a maximum production rate as listed below and all other activities,
operational rates and numbers of equipment as stated in the application. Daily records of the actual
production rate shall be maintained by the applicant and made available to the Division for
inspection upon request. (Reference: Regulation 3, Part B,III.A.4)
Production of sand and gravel shall not exceed 2,744 tons per day or 450,000 tons per year.
123/0530/001
{
GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 5.6.7 AND 8)
1. This permit is issued in reliance upon the accuracy and completeness of information suppliedby the applicant and
is conditioned upon conditt of the activity, or construction, installation and operation of the source, in accordance
with this information and with representations made by the applicant or applicant's agents. It is valid only for the
equipment and operations or activity specifically identified on the permit.
2. Unless specifically stated otherwise,the general and specific conditions contained in this permithave been determined
by the APCD to be necessary to assure compliance with the provisions of Section 25.7-114.5(7)(a), C.R.S.
3. Each and every condition of this permit is a material part hereof and is not severfile. Any challenge to or appeal of,
a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be
deemed denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution Control
Division (APCD)on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Contra
Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a
permit, conditions imposed upon a permit are contested by the applicant, or the Division revokes a permit, the
applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division's action
4. This permit and any required attachments must be retained and made available for inspection upon request at the
location set forth herein. With respect to a portable source which is moved to a new location, a copy of the
Relocation Notice(required by law to be submitted to the APCD whenever a portable source is relocated) should be •
attached to this permit. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation
No. 3, Part B, Section 111.8. upon a request for transfer of ownership and the submittal of a revised APEN and the
required fee.
5. Issuance (initial approval) of an emission permit does not provide "final"authority for this adivity or operation of this
source. Final approval of the permit must be secured from the APCD in writingin accordance with the provisions
of 25-7.114.5 C.R.S. and AQCC Regulation No. 3, Part B, Section IV.H. Final approval cannot be granted until the
operation or activity commences and has been verified by the APCD as conforming in all respects with the condlions
of the permit. If the APCD so determines, it will provide written documentation of such final approval, which does
constitute "final" authority to operate.Compliance with the permit conditions must be demonstrated within 1W days
after commencement of operation.
6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 18 months
after either the date of issuance of this permit or the date on which such construction or activity was scheduled to
commence as set forth in the permit, whichever is later; (2) discontinue construction for a period of 18 months or
more; or (3) do not complete construction within a reasonable time of the estimated completion date. Extensions
of the expiration date may be granted by the APCD upon a showing of good cause by the permittee.
7. YOU MUST notify the APCD at least thirty days(fifteen days for portable sources) prior to commencement of the
permitted operation or activity. Failure to do so is a violation of Section 25-7-114.5(12)(a), C.R.S. and AQCC •
Regulation No. 3, Part B. Section IV.H.1., and can result in the revocation of the permit. You must demonstrate
compliance with the permit conditions within 180 days after commencement of operation as stated in condition 5.
8. Section 25-7-114.7(2), C.R.S. requires that all sources required tofile an Air Pollution Emission Notice(APEN) must
pay an annual fee to cover the costs of inspections and adninistration. If a source or activity is to be discontinued,
the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee
• billing will terminate.
9. Violation of the terms of a permit or of the provisions of the Colorado Air Quality Control Act or the regulations of
the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115(enforcement),
-121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S.
Page 2 Colorado Department of Public Health and Environment
Hall-Irwin Construction Company Air Pollution Control Division
Permit No. 98WE0005
Final Approval
4. Fugitive particulate emissions shall not exceed the following limitations (as calculated in the
Division's preliminary analysis): (Reference: Regulation 3, Part B, III.A.4)
Particulate Matter: 38.1 tons per year
PM,o (Particulate Matter<10pm): . 15.9 tons per year.
Note: Compliance with these fugitive emission limits shall be demonstrated by not exceeding the
production limits in condition number 3 and by following the attached particulate emissions
control plan.
5. Emissions of air pollutants from transfer points shall not exceed the following limitations (as
calculated in the Division's preliminary analysis): (Reference: Reg. 3, Part B, III.A.4)
Particulate Matter: 2.32 tons per year
PMlo (Particulate Matter<10 pm): 1.10 tons per year.
6. This permit is for the activities specified above, any additional process equipment (i.e. crushers,
screens, etc.) to be located at this site must have a separate permit from the Division. (Reference:
Reg. 3, Part B, IV.E.)
7. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg.3, Part A,II.C)
a. Annually whenever a significant increase in emissions occurs as follows:
For any criteria pollutant:
For sources emitting less than 100 tons per year, a change in actual emissions of five tons
per year or more, above the level reported on the last APEN; or
For VOC sources in ozone non-attainment areas emitting less than 100 tons of VOC per
year, a change in actual emissions of one ton per year or more or five percent, whichever
is greater, above the level reported on the last APEN submitted; or
For sources emitting 100 tons per year or more, a change in actual emissions of five
percent or 50 tons per year or more, whichever is less, above the level reported on the last
APEN submitted; or
A change in actual emissions, above the level reported on the last APEN submitted, of 50
pounds of lead.
For any non-criteria reportable pollutant:
If the emissions increase by 50% or five (5) tons per year, whichever is less, above the
level reported on the last APEN submitted to the Division.
123/0530/001
Page 3 Colorado Department of Public Health and Environment
Air Pollution Control Division
Hall-Irwin Construction Company
Permit No. 98WE0005
Final Approval
b. Whenever there is a change in the owner or operator of any facility, process, or activity;
or
c. Whenever new control equipment is installed, or whenever a different type of control
equipment replaces an existing type of control equipment; or
d. Whenever a permit limitation must be modified; or
e. No later than 30 days before the existing APEN expires.
NOTE: A one ton per year emission increase will occur when the production rate increases by
approximately 49.4 tons per year. (Based on emission factors noted on the last page of this permit
which assume all operations change in the same proportion and there is no change in haul trucks
or length of haul roads).
8. This source will be subject to the New Source Performance Standards requirements of Regulation
number 6, Subpart 000 whenever there is primary crushing capacity greater than 150 tons per
hour (portable equipment) or 25 tons per hour (fixed equipment) at this location as follows:
a. Visible emissions from conveyors and transfer points shall not exceed 10% opacity.
In addition, the following requirements of Regulation No. 6, Part A, Subpart A, General Provisions,
apply.
a. No article, machine, equipment or process shall be used to conceal an emission
which would otherwise constitute a violation of an applicable standard. Such
concealment includes, but is not limited to, the use of gaseous diluents to achieve
compliance with an opacity standard or with a standard which is based on the
concentration of a pollutant in the gases discharged to the atmosphere. (§ 60.12)
b. Written notification of construction and initial startup dates shall be submitted to
the Division as required under § 60.7.
c. Records of startups, shutdowns, and malfunctions shall be maintained, as required
under § 60.7.
d. Compliance with opacity standards shall be demonstrated according to § 60.11.
123/0530/001
Page 4 Colorado Department of Public Health and Environment
Air Pollution Control Division
Hall-Irwin Construction Company
Permit No. 98WE0005
Final Approval
e. At all times, including periods of start-up, shutdown, and malfunction, the facility
and control equipment shall, to the extent practicable, be maintained and operated
in a manner consistent with good air pollution control practices for minimizing
emissions. Determination of whether or not acceptable operating and maintenance
procedures are being used will be based on information available to the Division,
which may include, but is not limited to, monitoring results, opacity observations,
review of operating and maintenance procedures, and inspection of the source.
(Reference: Regulation 6, Part A. General Provisions from 4OCFR6O.11)
By: 62t— \ By:
Sunday A. Fadeyi Dennis Myers P.E.
Permit Engineer Construction Permits Unit
Stationary Sources Program
Air Pollution Control Division
Initial Approval: Issued on April 1, 1998.
Notes to permit holder:
•
1. The production or raw material processing limits and emission limits contained in this permit are
based on the production/processing rates requested in the permit application. These limits may be
revised upon request of the permittee providing there is no exceedance of any specific emission
control regulation or any ambient air quality standard. A revised air pollution emission notice
(APEN) and application form must be submitted with a request for a permit revision.
2. This source is subject to the Common Provisions Regulation Part II, Subpart E, Upset Conditions
and Breakdowns. The permittee shall notify the Division of any upset condition which causes a
violation of any emission limit or limits stated in this permit as soon as possible, but no later than
two (2) hours after the start of the next working day, followed by written notice to the Division
explaining the cause of the occurrence and that proper action has been or is being taken to correct
the conditions causing said violation and to prevent such excess emission in the future.
3. The emission levels contained in this permit are based on the following emission factors (any
change in operations may change these factors):
Particulate Matter: 0.0103 pounds per ton of sand and gravel
PM10 (particles less than 10 microns): 0.0049 pounds per ton of sand and gravel
Fugitive Particulate Matter: 0.2936 pounds per ton of sand and gravel
Fugitive PM10 (particles less than 10 microns): 0.1263 pounds per ton of sand and gravel
4. This source is classified as a: Minor source
123/0530/001
Page 5 Colorado Department of Public Health and Environment
Air Pollution Control Division
Hall-Irwin Construction Company
Permit No. 98WE0005
Final Approval
PARTICULATE EMISSIONS CONTROL PLAN FOR MINING AND PROCESSING ACTIVITIES
THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE
PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY
CONTROL COMMISSION REGULATION NO.1, SECTION III.D.1.b. THIS SOURCE IS SUBJECT TO THE
FOLLOWING EMISSION GUIDELINES:
a. Mining and Processing Activities - Visible emissions not to exceed 20%, no off-property transport
of visible emissions.
b. Haul Roads - No off-property transport of visible emissions shall apply to on-site haul roads, the
nuisance guidelines shall apply to off-site haul roads.
c. Haul Trucks - No off-property transport of visible emissions except that when operating off the
property of the owner or operator, the applicable guidelines shall be no off-vehicle transport of
visible emissions.
Control Measures
1. Adequate soil moisture must be maintained in topsoil and overburden to control emissions during
removal. Watering shall be implemented if necessary.
2. Topsoil and overburden stockpiles shall be compacted and revegetated within one year.
3. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering
at all times unless natural moisture is sufficient to control emissions.
4. Vehicle speed on unpaved roads and disturbed areas shall not exceed a maximum of 20 m.p.h.
Speed limit signs shall be posted.
5. Vehicle speed on haul roads and service roads shall be restricted to 20 miles per hour. Speed limit
signs shall be posted.
6. Unpaved haul roads shall be watered as often as needed to control fugitive particulate emissions
such that the above guidelines are met.
7. Reclamation works and sequential extraction of material shall be initiated to keep the total
disturbed areas at any one time to a minimum.
8. Material stockpiles shall be watered as necessary to control fugitive particulate emissions.
Aggregate materials shall be sprayed with water during material loading into the storage bins or
stockpiles.
9. Plant entryway, truck service roads, and concrete batching areas shall be graveled. Watering shall
be implemented if emission guidelines above are not met.