HomeMy WebLinkAbout20002397.tiff DEPARTMENT OF PLANNING SERVICES
1555 N. 17th Avenue, Greeley, CO 80631
Phone (970) 353-6100, Ext. 3540, Fax#(970) 304-6498
MINOR SUBDIVISION CHANGE OF ZONE APPLICATION
App. Ch'd By: c; 3/%o Case Number:
App. Fee: //Or, Receipt Number: 060,5/
Record. Fee: Receipt Number:
Planner Assigned to Case:
TO BE COMPLETED BY APPLICANT. Please print or type, except for necessary signature.
I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Weld
County Board of County Commissioners concerning the proposed Change of Zone for the following described
unincorporated area of Weld County, Colorado:
LEGAL DESCRIPTION: Lot A RE2668 (pending) , situate in the SW 1/4 Section 7,
Township 4North, Range 68 West, Weld County, Colorado. See Attached Exhibit
(If additional space is required, attach an additional sheet) for metes & bounds description.
Property Address (if available): WCR 1, N. or WCR 46
Present Zone AG Proposed Zone Estate Total Acreage 32.845
Overlay Districts (if applicable) NA
SURFACE FEE (PROPERTY OWNERS) OF AREA PROPOSED FOR CHANGE OF ZONE:
Name: Harl e 3 Schultz Home Telephone#: (970) 532-5001
Address: 119 rn„nty Road 46 Bus.Telephone#:
Berthoud, Co 8051'1
Name: Home Telephone#:
Address: Bus. Telephone#:
APPLICANT OR AUTHORIZED AGENT (if different than above)
Name: Home Telephone#:
Address: Bus.Telephone#:
ignature: er or Authorized gent
Revised: 1-22-96
Planning/ Engineering Consultant
Landmark .Engineering, Ltd
Attn. Deanne Frederickson
3521 W. Eisenhower Blvd.
Loveland, CO 80537
(970) 667-6286 8
EXHIBIT
2000-2397 1
Minor Subdivision Change of Zone Application
Schultz First Subdivision Exhibit A
Lot A
Beginning at the Southwest Corner of Section 7,Township 4 North,Range 68 West of the 6'"Principal
Meridian, County of Weld, State of Colorado;thence along the West line of the Southwest Quarter of
said Section 7 North 01°26'45" East 1223.10 feet to the TRUE POINT OF BEGINNING;thence
continuing along said West line North 01°26'45" East 835.01 feet to the Southwest Corner of Lot A of
the Amended Recorded Exemption RE 1129; thence along the South and East lines of said Recorded
Exemption and the East line of Lot A of the Recorded Exemption No. 609 North 89°57'08"East 570.00
feet; thence North 01°26'45"East 603.10 feet to a point on the North line of the Southwest Quarter of
said Section 7; thence along said North line North 89°38'25" East 664.13 feet;thence departing said
North line South 01°11'02" West 1432.50 feet;thence South 89°32'00" West 1,240.85 feet to the TRUE
POINT OF BEGINNING.
The above described Lot A contains 32.845 acres more or less.
Minor Subdivision Change of Zone Application
Schultz First Subdivision
Change of Zone Questionnaire
Introduction:
The Schultz First Subdivision is currently zoned AG: Agricultural in the Weld County Zoning
Ordinance. This application requests a change of zone of 32.8 acres to E: Estate District. A
Concept Review application and a Recorded Exemption application(still pending)have preceded
this application. It is the intent of the owner/applicant to subdivide this 32.8-acre parcel into 5
residential lots. The following is a narrative that answers the change of zone questionnaire:
1. How is the proposed rezoning consistent with the policies of the Weld County Comprehensive
Plan?
The primary goals of the Weld County Comprehensive Plan are as follows:
• Preservation of agriculture and rural character.
• Concentrate urban development in urbanized areas
• Maintaining compatible land use in unincorporated areas.
• Accommodate and promote industrial base
• Expand and promote commercial base
• Housing is affordable, high quality, and serviceable
• Encourage creative design approaches in PUD developments
The goals that apply to this project have to do with the preservation of agriculture and
rural character, and making sure residential housing is high quality and is serviceable by
utilities and community services. The intended equestrian uses, and estate lot development
will compliment the predominant uses in the immediate area, and maintain the agrarian
goals of the Weld County Master Plan.
The concept review report as well as the Recorded Exemption application provided an
analysis of the compliance of this project with the Comprehensive plan. The following
summarizes the analysis, and provides further explanation to address these issues:
A. Goal 1: "Preserve prime farmland for agricultural purposes which foster the economic health
and continuance of agriculture. "
The Schultz property is currently used for non-irrigated agricultural purposes. Though
it is listed in the 1979 Farmland inventory as prime farmlands (U.S. Department of
Agriculture Soil conservation Service, 1979),the property has not been irrigated or used
for significant farm production for over 9 years. There are no plans or opportunities to
significantly change the farming potential of this property.
A. Policy 3: "conversion of agricultural land to residential, commercial and industrial
development will be discouraged when the subject site is located outside of a municipality's
comprehensive plan area, urban growth boundary area, or 1-25 Mixed Use Development area
and urban development nodes."
The Concept review analysis indicates that the "Town of Berthoud has indicated that
the proposed subdivision does not conform to their long-range plans for the area."
03/02/00 1 Schultz First Subdivision
However, a written response from the Berthoud Town Planner indicates they have no
issues regarding the recorded exemption application. The Town of Berthoud Land use
Plan indicates the Schultz property to be within the Berthoud Planning Area, in an
agricultural land use area. After reviewing the definition for this district, it appears the
proposed project is consistent with the goals of the Berthoud land use plan.
The following service providers will serve the property:
• Water: Little Thompson Water District: A letter of commitment attached with this
application.
• Sewer: On-Site septic systems: Initial percolation and soils profiles are included
with this application. The preliminary tests indicate a need for combined septic
systems, but appear initially to be within the acceptable limits of the Weld County
requirements. (Per phone conversations with Seble McConnellogue, Environmental
Health Services).
• Schools: Thompson School district RE-2J: Concept Review indicates this proposal
will not cause district enrollment to exceed service level C
• Fire: Berthoud Fire District: The applicant is aware of the possible requirements for
additional water line and hydrants for fire protection. This aspect of the proposal is
subject to review during the subdivision application phase of the project. There is
an existing fire hydrant on the corner of WCR 1 and WCR 46, which serves the
needs of the existing structures.
A.Goal 4: "Provide a mechanism for the division of land which is agriculturally zoned. The
intent of this goal should be to maintain and enhance the highest level of agricultural productivity
in Weld County"
The Schultz property is currently used for non-irrigated agricultural purposes. Though
it is listed in the 1979 Farmland inventory as prime farmlands (U.S. Department of
Agriculture Soil conservation Service, 1979),the property has not been irrigated or used
for significant farm production for over 9 years. There are no plans or opportunities to
significantly change the farming potential of this property.
R.Policy 5: "New Residential development should demonstrate compatibility with existing
surrounding land-use... "
Two previous recorded exemptions have resulted in the creation of residential lots
adjacent to the property that are used for equestrian boarding. There are currently a
number of equestrian-use ranches and "ranchettes" in the immediate vicinity, as well as
large-lot residential uses. The applicant feels this would be the best agricultural use for
his property as well.
A.Policy 7: "Weld County recognizes the "right to farm".
The applicant understands the agricultural uses that are in the area, and potential
conflicts that may exist between agricultural uses and residential uses, such as noise,
odor, etc. The applicant recommends placing notes on the future subdivision plat that
addresses these issues as well.
03/02/00 2 Schultz First Subdivision
P.Goal 2: .."requires adequate facilities and services to assure the health, safety, and general
welfare of the present and future residents of Weld County... "
Future subdivision applications will reflect the required roadway widths, R.O.W.
dedication, and pavement type and maintenance responsibilities.
2. How will the uses allowed by the proposed rezoning be compatible with the surrounding land
uses?
Two previous recorded exemptions have resulted in the creation of residential lots
adjacent to the property that are used for equestrian boarding. There are currently a
number of equestrian-use ranches and "ranchettes" in the immediate vicinity, as well as
large-lot residential uses. The applicant feels this would be the best agricultural use for
his property as well.
Include a description of existing land uses for all properties adjacent to the subject property.
3. Will the property use a septic system or public sewer facilities?
The proposed lot (and future subdivision) will be served by an on-site septic system.
The permit for the existing septic system has been included in previous submittals for
your information. Also, preliminary percolation tests and soil profiles were conducted
on the remaining parcel to determine adequacy for septic systems for future
development. This information is also included with this packet for your information.
4. Who will provide adequate water, including fire protection, to the property?
There is domestic water available for the site, as demonstrated by the letter of
commitment from the Little Thompson Water District(attached).
The Berthoud Fire District will serve the fire protection needs of the future residential
uses planned for this property. The applicant is aware of the possible requirements for
the placement of additional water line and hydrants for fire protection. This aspect of
the proposal is subject to review during the subdivision application phase of the project.
There is an existing fire hydrant on the corner of WCR 1 and WCR 46, which serves the
needs of the existing structures.
5. Does the property have soils with moderate or severe limitations for construction? If yes,the
applicant shall submit information that demonstrates that the limitations can be overcome.
Soils data was collected and percolation tests were conducted to determine the adequacy
of the soil for residential construction and septic system use. The perc tests indicate that
percolation rates were somewhat slow, and that septic systems will likely require
engineered systems using a combination/ET design.
SCS soils data indicates that this soil type has "fair to poor potential for urban
development. It has moderate to high shrink swell, low strength, and moderately slow
permeability. These features create problems in dwelling and road construction". The
limitations presented by the soil conditions can be easily overcome by the use of
engineered foundations. This is a very low-density residential development that does
not have a huge impact on the area(as would be the case with a standard, more urban
03/02/00 3 Schultz First Subdivision
development). The planned cul-de-sac that will serve the residences will be carefully
engineered as well. It is not anticipated that the road will be paved at this time.
6. Is the road and/or highway facility providing access to the properties adequate to meet the
requirements of the proposed zone district?
The existing road,WCR 1 will adequately serve the proposed development. There will
be a maximum of 5 homes in this development,which will not produce a significant
impact on the local transportation system.
7. Is there sand, gravel, or other mineral resource on or under the subject property?
Soils data indicates there could be small,long and narrow areas of sand and gravel
deposits. Because the relative size of the area is small,extraction of any potential
mineral deposits would not be economically feasible.
8. Is the change of zone area located in a Flood Hazard Overlay District?
NO.
9. Is the change of zone area located in a Geologic Hazard Overlay District?
NO. See also, attached Geologic Hazards report prepared by Landmark Engineering
Ltd.,August 2, 1999.
10. Is the change of zone area located in the Airport Overlay District?
NO
03/02/00 4 Schultz First Subdivision
Hello