May 18, 2000
Bill Owens
Governor
Parties Greg E.Walther
112 Permit Amendment Application Executive Director
La Poudre Sand and Gravel Pit Michael B.Long
Division Director
File No. M-1983-090
RE: Pre-hearing Order, File No. M-1983-090, Hall-Irwin Construction Company
La Poudre Sand and Gravel Pit - 112 Permit Amendment Application
To Whom It May Concern:
The enclosed Pre-hearing Order, drafted as a result of the Pre-hearing Conference held in this matter
on May 16, 2000, is being sent to you pursuant to Construction Materials Rule 2.7.1(3).
If you have any questions, concerns, or objections regarding the provisions of the enclosed
document, please direct them to the Mined Land Reclamation Board at the final hearing to be held in
this matter on Wednesday, May 24, 2000, in Denver, Colorado.
Sin�erincer l�
H. Bruce Humphries
Minerals Program Supervisor
Attach.(1): Tuttle-Applegate Witness List
cc: Jeff Gregg, Hall-Irwin Construction Company/Applicant
Clem McNancy/Objector
Dana Moore, Tuttle-Applegate
Rick Moss, DOW
Weld County Commissioners
Michael Shay, West Greeley SCD
Kenneth Baumbach, Weld County Planning Dept.
Erica Crosby, DMG-Denver
Sandy Brown, DMG-Denver
Cheryl Linden, OAG
Tom Roan, OAG
C e /2L Fe) (?h'
?T1,,1'-1;. !t,b0 2000-2265
4--
hnll-Irwin-esc pL_1d5 ]
Mailing List
JEFF GREGG
HALL-IRWIN CONSTRUCTION COMPANY
PO BOX 519
GREELEY CO 80632
DANA MOORE
TUTTLE-APPLEGATE INC
11990 GRANT ST STE 304
DENVER CO 80233
CLEM MCNANEY
P O BOX 248
WINDSOR CO 80550
•
RICK MOSS
COLORADO DIVISION OF WILDLIFE
NE REGIONAL OFFICE
6060 NORTH BROADWAY
DENVER CO 80216
WELD COUNTY COMMISSIONERS
915 10TH STREET
GREELEY CO 80632
MICHAEL SHAY
WEST GREELEY SOIL CONSERVATION DISTRICT
4302 W 9TH ST RD
GREELEY CO 80634
WELD COUNTY PLANNING DEPARTMENT
ATTN: KENNETH BAUMBACH
1555 N 17TH AVE
GREELEY CO 80631
hauhwin-ecs
BEFORE THE MINED LAND RECLAMATION BOARD
STATE OF COLORADO
PRE-HEARING ORDER
IN THE MATTER OF HALL IRWIN CONSTRUCTION COMPANY, THE LA POUDRE
SAND AND GRAVEL PIT AMENDMENT 001, FILE NO. M-83-090, APPROVAL OF A 112
PERMIT AMENDMENT APPLICATION OVER OBJECTIONS
This Pre-hearing Order is proposed to the Mined Land Reclamation Board ("the Board") by the
Pre-hearing Conference Officer, Sandra Brown, to govern the hearing in this matter. This Order,
and amendments thereto, if any, shall be effective upon approval by the Board. If any party has
objections to the provisions of this Pre-hearing Order, those objections must be raised at the final
hearing before the Board during its deliberations under Section VI.1 below.
I. FORMAL PUBLIC HEARING
The Formal Public Hearing on this matter(unless noticed otherwise) shall be held before the
Board on May 24, 2000, at the Centennial Building, 1313 Sherman Street, Denver, Colorado,
80203, Room 318, during the Board's regular May meeting. The Board's agenda (unless noticed
otherwise) will begin at 9:00 a.m.
IL PARTIES
1. The Pre-hearing Conference in this matter was held on May 16, 2000 in Denver,
Colorado. The applicant was represented by Tuttle Applegate. The objector did not appear. The
Pre-hearing Conference Officer verified the following party list:
a. APPLICANT
Hall-Irwin Construction Company
Jeff Gregg
P.O. Box 519
Greeley, CO
b. OBJECTORS
Clem McNaney
P.O. Box 248
Windsor, CO 80550
•
xG%C�' - ,a)•?/
Note: The Division of Minerals and Geology ("Division") shall not be a party, but shall
participate in the hearing as staff to the Board.
III. ISSUES TO BE CONSIDERED
Presentations to the Board shall be strictly limited to the issue of whether the pending application
complies with the requirements of the Colorado Land Reclamation Act for the Extraction of
Construction Materials, Sections 34-32.5-101 et seq., C.R.S. (1999) ("Construction Materials
Act") and the rules and regulations promulgated by the Board. The parties shall limit
presentations to the question of whether the pending application should be approved or denied,
based on the issues stated below.
1. Potential impacts to prevailing hydrologic balance due to the construction of the slurry wall.
2. Potential impacts to prevailing hydrologic balance due to the construction and location of
berms.
IV. ISSUES NOT TO BE CONSIDERED
All other issues raised by the parties that are not included in the list above will not be considered
by the Board, either because the concern has been addressed or because the issue is outside the
jurisdiction and authority of the Board under the Construction Materials Act.
V. WITNESSES AND EXHIBITS
Rules 2.7.1(2)(d) and (e) require that pre-hearing orders contain lists of all witnesses and exhibits
that the parties will introduce at the hearing. The purpose of this rule is to ensure that parties are
given an opportunity to prepare replies or rebuttals to the materials offered by other parties. A
list of Witnesses and a list of Exhibits were submitted for the Applicant. They are attached to
this Order.
The parties shall note that if no witness or exhibit lists were submitted by a party at the Pre-
hearing Conference, that party may not introduce any exhibits or present any witnesses at the
final hearing in this matter without express permission from the Board.
All documents, exhibits and photographs presented as evidence at the Formal Public Hearing will
become part of the administrative record. Upon request, a party may recover any evidence
introduced by that party, if no action for judicial review is commenced within thirty (30) days of
the date agency action in this matter becomes effective.
VI. PROCEDURE
The Division, parties and members of the public shall make presentations in the following order.
The time limits set out below are maximum limits and shall be strictly enforced. The Board, in its
discretion, may allow additional time when warranted. The Board has the right to limit any
2
redundant or irrelevant testimony. As noted below, all parties will be afforded an opportunity to
conduct cross-examination of any witnesses that testified during the presentation.
1. Board's Consideration and Adoption of the Pre-hearing Order:
The Pre-hearing Conference Officer shall present this Pre-hearing Order to the Board for
adoption. The Board will hear any objections to the proposed Order at that time, and will
make any necessary amendments prior to adopting the Order.
2. Division's Introduction and Overview:
The Division shall have 5 minutes in which to present an introductory overview of the
application.
3. Applicant's Presentation:
The Applicant shall have 5 minutes in which to make a presentation to the Board.
4. Division's Presentation and Recommendation:
The Division shall have 10 minutes in which to present its recommendation to the Board.
5. Objectors' Presentations:
The Objectors shall have 10 minutes in which to make a presentation to the Board.
6. Public Comment Period:
Members of the public who are not parties to this action shall have 5 minutes collectively
to address the Board.
7. Cross-Examination and Rebuttal Statement- Applicant
The Applicant shall have 15 minutes to cross-examine witnesses and make a rebuttal
statement.
8. Cross-Examination, Rebuttal Statements, and Closing Comments - Objectors:
The Objector shall have 15 minutes to cross-examine witnesses and make rebuttal and
closing statements.
9. Rebuttal Statements - Division:
The Division shall have 10 minutes to make a rebuttal statement.
3
a'GGIi —. : r'e
10. Applicant's Closing Statement:
The Applicant shall have 5 minutes to make a closing statement.
11. Division's Closing Statement:
The Division shall have 5 minutes to make a closing statement.
Dated this 18`h day of May, 2000.
BY: 7444_LA c
Sandra L. Brown
Pre-hearing Conference Officer
do Division of Minerals and Geology
1313 Sherman St., Room 215
Denver, CO 80203
4
,, _ ? &S
xGc- l'
'.a •i. l;T —_ 4Pn!_,E3,4 INC 3034512759203452661 '.. lay ' 11:35:
^`'R^ �7G8 1 '1
v? 3
■ead
■
rf
— - -
71httleApplegate,lnc.
Consultants for Land, Mineral and Water
FAX TRANSMITTAL
DATE: May 17, 2000 TA FILE # 99-226
NUMBER OF PAGES: 1 including cover sheet
TO: Erica Crosby , . FAX NUMBER: 303-832-8106
FROM: Dana Moore
COMMENT: Here is a list of witnesses we may call at the May 24`h Board Hearing to
• go along with the list of exhibits 1 faxed earlier
I . Jeff Gregg, Vice President, Aggregate Division, Hall Irwin Construction
Corporation
2. Mike Applegate,Tuttle Applegate, Inc.
3. Dana Moore, Tuttle Applegate Inc.
Thanks,
Dana
If you have received this communication in error,please notify us immediately by tclophone
(if long distance.please call collect)and return the original message via the U.S. Postal Service at our expense.
If there are problems with this transmission,please call the receptionist at(303)452-6611.
11990 Grant Street, Suite 304 • Donver, Colorado 80233 • (303)452.6611 • (Fax)452-2759 c?G yC'- ,!:4:5
, .10- 3y: _._ APPL= = INC 32:303»:26611 : 7:10: � _ye I
•
III Id
I 9 `
t'te-
7WttleApplegate,inc.
Consultants for Land, Mineral and Water
FAX TRANSMITTAL
DATE: May 17, 2000 TA FILE # 99-226
NUMBER OF PAGES: 1 including cover sheet
TO: Erica Crosby FAX NUMBER: 303-832-8106
FROM: Dana Moore
COMMENT: Here is a list of exhibits we will have for the May 24b Board Hearing.
They should be the same as the ones noted during the PreBoard Hearing Conference on
May 16th, In addition to drawings that are currently on record with the DMG, we would
like to exhibit:
1.. The FEMA Flood Insurance Rate Map for Weld County, Colorado
2. The 7.5 Minute Series Windsor Quadrangle Map
3. The 1983 La Poudre Pit Reclamation Plan with Information Added by
Tuttle Applegate
Also, were you able to get in touch with Clem MeNaney yesterday regarding any
exhibits or witnesses he was planning to bring firth during the Board Hearing? If you
would just let me know what you find out when you are able to talk with him, I would
appreciate it. Thanks!
Dana
If you have received this communication in error, please notify us immediately by telephone
(If long distance,please call collect)and return the original message via the U.S. Postal Service at our expense.
If there are problems with this transmission,please call the receptionist at(303)452-6811.
11990 Grant Street,Suite 304 • Denver, Colorado 80233 • (303)452-6611 • (Fax)452-2759 _
Hello