Loading...
HomeMy WebLinkAbout20001379.tiff DEPARTMENT OF PLANNING SERVICES l°O;(1li PHONE (970)353-6100, EXT.3540 FAX (970) 304-6498 MINIST RATIVE OFFICES C. WELD COUN GREDELEY, 5C N.17T AVENUE COLORADO May 30, 2000 Bill Hedberg 40,000.Weld County Road 25 Ault, Colorado 80610-9748 Dear Mr. Hedberg, This letter is in response to your proposed design modifications to your sanitary landfill that was originally approved as a Use by Special Review (USR-895). Your modifications were reviewed by the Department of Planning Services staff and Weld County Department of Environmental Health and it was determine that your modifications would not be considered a substantial change to your original application (USR-895). No further applications are therefore needed from the Weld County Department of Planning Services. However, any future revisions to your landfill will need to be reviewed by the Weld County Department of Planning Services and may require the submittal of a new Use by Special Review application. „ti Chris Gathman Planner girt/1244 arta.-- U(0-05-moo Az, o777 2000-1379 NORTH WELD SANITARY LANDFILL Wirt A WASTE MANAGEMENT COMPANY Weld County Planning L ep 40,000 Weld County Road 25 Ault,Colorado 80610-9748 (970)686-2800 May 16,2000 MAY 23 2000 (970)686-1031 Fax Mr. Chris Gathman C E I \/ E n Weld County Department of Planning S Pede s V �"+ 1400 N 17 Avenue Greeley,CO 80631 RE: North Weld Sanitary Landfill(NWSL) Minor Design Modification Dear Mr. Gathman: Pursuant to our meeting on May 15, 2000 and in accordance with Condition#34 of the Certificate of Designation Development Standards included in USR-895, the NWSL is hereby filing this minor design modification with the Weld County Department of Planning Services(WCDPS). On June 27, 1990, the NWSL received its Certificate of Designation(CD) from the Weld County Board of County Commissioners. The original D&O Plan as well as condition 7b of the Certificate of Designation Development Standards, require that the entire landfill be underlain by a two foot thick compacted clay liner having a maximum permeability less than or equal to 1 x 10-7 cm/sec. In July 1991, Waste Services Corporation(WSC) merged with Waste Management of Colorado, Inc. (WMC). After the merger, WMC voluntarily requested approvals from the Colorado Department of Public Health and Environment (CDPHE) and Weld County Department of Public Health and Environment (WCDPHE) for certain design modifications in order for the site to more closely reflect WMC corporate guidelines at that time. The request included approval to increase the compacted clay liner thickness from two feet to three feet. Approvals were received from the regulatory agencies and Module 1 was constructed with a three foot compacted clay liner. The site opened to the public for the first receipt of solid waste on February 3, 1992. Subsequently, Modules 2, 3 and 4 were also constructed with a 3 foot thick liner. On July 15, 1999, NWSL submitted a request to the CDPHE and WCDPHE to begin using the original two foot thick soil liner. The request for the original two foot thick liner was based on our review of requirements under the Colorado Solid Waste Regulations, the Certificate of Designation and corresponding Development Standards issued by the Weld County Board of County Commissioners, the original Design and Operations Plan (D&O), waste types received at the facility and site specific technical information. We have received verbal approvals from the CDPHE and WCDPHE to use the original liner design of two feet thick as specified in the CD Development Standards and are currently awaiting written approval. The reduction in the liner thickness along with a previously approved six inch reduction in the protective/drainage layer placed above the clay liner results in a slight change in the set back from the permitted property from 200 feet to approximately 195 feet. Since the Letter Chris Gatham May 16, 2000 Page 2 NWSL owns an additional 320 acres adjacent to the site along the north and east sides of the landfill, we believe the change in set back is of no technical consequence as it relates to any defined property boundary or facility operations. The change in set back will not affect the site's ability to comply with the Colorado Solid Waste Regulations and County requirements and will continue to provide protection of public health and environment. We have enclosed a copy of the site plan and a drawing that illustrates the effect the design modification has on the set back for your reference. We have obtained concurrence from the WCDPHE that this modification constitutes a "minor change." Accordingly, we are filing this minor change with the WCDPS in accordance with Condition#34 of the CD Development Standards. Since receiving approvals from the CDPHE and WCDPHE for this change, NWSL has initiated design efforts to reflect this approval and construct the next disposal cell (Module 5) with a two foot thick liner, including the resulting change in set back. Since time is of the essence as it relates to our construction schedule, we would appreciate any questions you may have concerning this minor change as expeditiously as your schedule will allow. If necessary,please contact Alan Scheere at (303)280-9336 or Bill Hedberg at(970) 686-2800. Sincerely, ajar,, Alan Scheere 7 Bill Hedberg Environmental Specialist District Manager AS/as Enclosure cc: Trevor Jiricek, WCDPHE Cindi Etcheverrey, WCDPHE Doug Ikenberry, CDPHE J A EGEND 4 D j 4ICICI& it C �� z I ..._-..r... 1 ��\ (l� J I r 11 I l� 722 �I- L \ �I�' J �� ' _ c t i f I I ICI ji :o �( -,-..e ,_ ...,_�--. \\ , JA _/� , I -/ ,—±,! I VA \ \ _ I L g mce rtse!,,, ,Tram' \\ �~- �� - ma ( \ Wirt a TO I/28/92' me cuarcExMc.wc. � \ �� i mil V _ ' s.. _:. . . r�_� — ����••� l ��----=--- NORM pan swrurc,emi ) V " c ( , ' n i neon=SHE ouxamrunu� \\\ ] ,A � . I f '=- veain ianu+ ru arr.uw�s Vv yAN\ \\ \ - I ATEC Aeeocates,Incmov naauear nu. I / 0.5 FT. TOPSOIL 2 ET. PROTECTION LAYER / / 30 1A11L FLEXIBLE MEMBRANE BARRIER// , 0.5' " GRADE 0.5 FT. FOUNDATION LAYER 2.0' 0.5' / ' 4 / 1 � To REFUSE AND DAILY COVER ----` TO 12 ' T - 12.6' H-2.4 FT. 1.0_ I �` \ 1.0' PROTECTIVE LAYER \ \ \ 3.0' CLAY BARRIER LAYER \______ 1.0 SAND DRAINAGE LAYER SCALE '"--10' SCHEMATIC DRAWING OF LINER AND COVER DESIGN PROJECT NO. PHASE 1 MODULE 1 -- TYPICAL CROSS SECTION 4'-17238-2_ . ATEC NORTH WELD SANITARY LANDFILL DATE WELD COUNTY, COLORADO APRIL 199'? DRAWING NO. .1 Hello